Cnet 201 Lab Test01 - Test sample PDF

Title Cnet 201 Lab Test01 - Test sample
Author Anonymous User
Course Network Services
Institution Centennial College
Pages 12
File Size 719.4 KB
File Type PDF
Total Downloads 42
Total Views 153

Summary

Test sample...


Description

CNET201 - Routing and Switching Essentials 20W Skills Based Assessment/Lab Test CNET201 - Routing and Switching Essentials 20W SBA - Final Test 1. 90 MINUTES,

PASS/FAIL grade. With a pass grade 8 /13 mark 50%.

NAME : _________ _____________________________________ Course Name and date: ________________CNET 201______________________________ STUDENT NO: ______________________________________________ SECTION CRN#: ________006______________________________________

Follow the instruction in this page INFORMATION & INSTRUCTIONS: 1.

Read all of the following information before starting the exam.

2. Course Policies Students must pass both the theory tests and lab test; and achieve an overall passing grade to pass the course. You CANNOT proceed to the next course if you pass the theory test but fail the lab test. 3. No allowance will be given for late arrivals, except those that are covered by College Policies on exceptional circumstances. 4.

You have 100 minutes from the time that the test starts to complete the examination.

9.

“The College’s Policies on Academic Dishonesty will be enforced”.

Lab Skills Test Network design & Configuration - Using the provide topology diagram, cable and configure this small IP network - Use the provided IP & VLAN addressing table for your design configurations - Router and Switch hostnames must be configured where the # symbol is your student number followed by the host name: Example student ID:00001 Router Name: 00001-BR01 Switch Name: 00001-BR-SW01

Download the following to start the lab: 1- Cnet 201 Lab Test.pkt ( this is the lab design) 2- The Lab report which will have screenshots and running configuration for required devices.

Student NAME and NO Test date:

Device PC-B01

Interface NIC

Device PC-HQ01 PC-HQ02

Interface NIC NIC

Device BR-SW01 BR-R01 HQ-SW01 HQ-R01

Interface SVI FE0/0 FE1/0

Addressing Table Branch IP address Subnet Mask 192.168.10.10 /24 HQ Network IP address Subnet Mask 192.168.20.20 /24 192.168.30.30 /24 Network: IP address Subnet Mask 192.168.10.254 /24 192.168.10.1 /24 Point to Point Router

VLAN 20 VLAN 30 Point to Point Router

Default Gateway

VLAN VLAN 20 VLAN 30

Default Gateway

VLAN VLAN 10 VLAN 10

Default Gateway

SVI FE0/1 FE1/0

192.168.20.1 192.168.30.1 Point to Point Router

VLAN Subnet

VLAN 10

VLAN VLAN 10

Network 192.168.10. 0 192.168.30. 0 172.16.40.0

Subnet

255.255.255.0 255.255.255.0

10.10.10.0

255.255.255.252

255.255.255.0

VLAN 20, Vlan 30

Networking Addressing for the devices:

Branch office configuration: 1- Configure the PC 1 with IPv4 address and the default Gateway of BR-01 router. Assign Ip address from the IP address list provided. Also, it is part of VLAN 10 2- Configure the Branch Switch with the require virtual switch interface (SVI) and assign it to the interface VLAN provided in the table. 3- Configure the router (branch router) with Lan interface and wan interface as provided. 4- Set the static route to the branch LAN network. 5- Set the default route to the Head Office. 6- Assign the subnet mask 255.255.255.252 /30 between the HQ router and the BR- router. Make sure you record the IP addresses on the excel sheet provided

HQ office configuration: 1- Configure HQ-PC01 with vlan 20 and assign the IPv4 address as provided in the excel sheet. Configure the default Gateway in the PC for the sub interface of the vlan in the router. 2- Configure HQ-PC02 with vlan 30 and assign the IPv4 address as provided in the excel sheet. Configure the default Gateway in the PC for the sub interface of the vlan in the router. 3- Configure the HQ Switch with the require virtual switch interfaces (SVI) and assign it to the interface VLAN provided in the table. 4- Configure in the switch access ports for each port connected to the PCs with the required VLANs 5- Set the interface of the switch that connected to the router as trunk 6- Configure the HQ router LAN interface with sub interface for each of the vlans (20 and 30) and assign the required IP address provided in the excel sheet. 7- Configure static route to each Network in the HQ 8- Set a static route from the HQ router to BR router Make sure you record the IP addresses on the excel sheet provided

*** Could not set ip address on fa 0/1. Ip addressed overlap with subinterface error and bad mask error. Lab Test Screenshots: Branch office

1- Screenshots for IP address configuration for PC-B01

2- Running configuration for BR-SW01 and BR-R01 SWITCH:

ROUTER:

3456-

Screenshot for a ping between: PC-B01 and BR-Router LAN interface Screenshot for a ping between: PC-B01 and HQ02 Screenshot for a ping between: PC-B01 and HQ01 Screenshot for Switch VLANs, SVI interface.

Lab Test Screenshots: HQ office 1- Screenshots for IP address configuration for PC-HQ01 and HQ02

2- Running configuration for HQ-SW01 and HQ-R01 ROUTER:

Switch:

3456-

Screenshot for a ping between: PC-HQ01 and PC-HQ02 Screenshot for a ping between: PC-HQ01 and PC-BR01 Screenshot for Switch VLANs, SVI interface. Screenshot of the routing table for the router in the HQ.

Submit only the report in word format with all information and screenshots....


Similar Free PDFs