HEALTH&SAFETY FIELDWORKRISKASSESSMENTFORM   

RANo./ERMSRef.:     

Date:16/9/20

VersionNo.:     

ReviewDate:     

Authorisedby:GiriKattel

 

STEP1–ENTERINFORMATIONABOUTTHEACTIVITY/TASK,ITSLOCATIONANDTHEPEOPLECOMPLETINGTHERISKASSESSMENT 

School/Faculty/Department:

Date(s)offieldwork:

Assessedby(FieldWorkSupervisor):

HSR/Employeerepresentative:

MSE/InfrastructureEngineering

30/9‐4/102020

GiriKattel

MarkBettar

Locationoffieldwork:

Arethereanylicensing/permit requirements?

Farmdams5,9,16,23,25,30ontheDookiemainblock

Yes

Descriptionofthefieldwork:

If“yes”providedetails: 

No

NumberofParticipant(s):

Ourgroupisassessingwhethersurroundinglanduseshasaneffectontheparticlesizedistributionofbedsedimentsforfarmdams.Wehypothesizethatintensiveland 4 useswillcausegreatersedimentmobilizationfrompaddocksandthiswillcauseaverageparticlesizetobesmallerindamsthathaveahistoryofanimalstockingor intensivecropping(canolaplanting)comparedtofallowpaddocksorthebushlandreserve.Wewillcollect5sedimentsamplesofapproximately100cubiccmsfromeachof thefarmdamslistedaboveusingamodifiedEckmangrabsampler.Thesamplesarerandomlylocatedwithineachdam.Wherepossiblewewillwadetothesamplingpoint totakethesample.Thelargerdamsarelikelytorequiretheuseofasmallinflatableboattocollectthesamplebecausewaterwillbetoodeeptowade.  Listsystemsofworkfortheactivity/task: ●Training

●Inspecons

●SOPs

●Exisngcontrols

Istherepastexperiencewiththeactivity/taskthatmayassistintheassessment? ●Exisngcontrols

●SOPs 

●Industrystandards

●Incidents&near‐hits

●Legislaon&Codes

●Training

●IncidentInvesgaon

●Guidancematerial

safety.unimelb.edu.au

WehavedevelopedSOPsforthefieldactivitiesandthesewillbeincludedinourVirtualCampReportforformalassessment. TutorKattelaccompaniesgroupsintothefieldwherepossible.Wewillnotundertakefieldworkinvolvingtheinflatableboat unlessheispresent.ThisneedwillbeassessedonDay1ofthefieldcamp.

●Emergencysituaons



TheEckmangrabsamplercomesfromtheGeotechnicallabintheDepartmentofInfrastructureEngineering.Geotechstaff haveprovidedtrainingtotutorKattelinitsuse,whointurnwilldemonstrateitsusetousonthefirstfieldvisit.



●Standards

Weunderstandthatsimilarsamples,includingtheuseoftheinflatableboat,havebeentakenaspartoftheMonitoring EnvironmentalImpactsfieldcamppreviously.Coordinatorandtutorexperiencewillbevaluableforsafelyundertakingthis activity. Otherrelevantexperienceisdetailedinthesubject‐levelandtutorial‐level(farmdams)fieldworkriskassessments.

HEALTH&SAFETY:FIELDWORKRISKASSESSMENT1 Date:July2017Version:2.0Authorisedby:Manager,Health&Safety,OperationsNextReview:July2022 ©TheUniversityofMelbourne–Uncontrolledwhenprinted.

STEP2:RISKRATING–RISKMARTRIXANDDEFINTIONS

 Consequence

Likelihood



Insignificant

Minor

Moderate

Major

Severe

Almostcertain

Medium

High

High

Extreme

Extreme

Likely

Medium

Medium

High

Extreme

Extreme

Possible

Low

Medium

Medium

High

Extreme

Unlikely

Low

Low

Medium

High

High

Rare

Low

Low

Low

Medium

High

 Likelihood  Almostcertain–willoccurinmostcircumstanceswhentheactivityisundertaken(greater  than90%chanceofoccurring) Likely‐willprobablyoccurinmostcircumstanceswhentheactivityisundertaken(51to  90%chanceofoccurring)

Consequence Insignificant–Firstaidtreatment,minorinjury,notimeoffwork Minor–Singleoccurrenceofmedicaltreatment,minorinjury,notimeoffwork

Moderate–Multiplemedicaltreatments,non‐permanentinjury,lessthan10daysoff work Major–Extensiveinjuriesrequiringmedicaltreatment(e.g.surgery),seriousor Unlikely–couldhappenatsometimewhentheactivityisundertaken(1to20%chanceof  permanentinjury/illness,greaterthan10daysoffwork occurring) Rare–mayhappenonlyinexceptionalcircumstanceswhentheactivityisundertaken Severe–Severeinjury/illnessrequiringlifesupport,actualorpotentialfatality,greater  than250daysoffwork (lessthan1%chanceofoccurring) Possible–mightoccurwhentheactivityisundertaken(21to50%chanceofoccurring)



 RiskRatingPriorityforAction 

Riskacceptanceguide

Extreme

Notacceptable

High

Generally(inmostcircumstances)notacceptable

Medium

Generally(inmostcircumstances)acceptable

Low

Acceptable

Action Ceaseorisolatesourceofrisk Implementfurtherriskcontrols Monitor,reviewanddocumentcontrols Implementriskcontrolsifreasonablypracticable Monitor,reviewanddocumentcontrols Implementriskcontrolsifreasonablypracticable Monitor,reviewanddocumentcontrols Monitorandreview

Recommendedactiontimeframe Immediate Upto1month Ongoing 1to3months Ongoing 3to6months Ongoing Ongoing

  

safety.unimelb.edu.au

HEALTHASAFETY:FIELDWORKRISKASSESSMENTFORM2 Date:May2018Version:2.1Authorisedby:Manager,Health&Safety,OperationsNextReview:May2023 ©TheUniversityofMelbourne–Uncontrolledwhenprinted.

STEP3–IDENTIFYHAZARDSANDASSOCIATEDRISKSCORESANDCONTROLS Foreachofthefollowingprompts:

HierarchyofControl(ControlType)



Reviewtheprompts/examplesforeachhazardthatmaypotentiallyexistfortheactivity/task;

El–Elimination



Determineandrecordaninherentriskscoreusingtheriskmatrix;

S–Substitution



Inthecommentsbox,describewhenandwherethehazardispresent;

En–Engineering



Specifytheriskcontroltype,foreachcurrentorproposedriskcontrol;

Sh–Shielding

Is–Isolation

G–Guarding In–Inspection



Provideacontroldescriptionforeachcurrentorproposedriskcontrol;

A–Administrative

T–Training



Whereproposedriskcontrol(s)havebeenidentifiedcompleteaHealth&Safety:Actionplan;

M–Monitoring

H–HealthMonitoring



Determinetheresidualriskscoreusingtheriskmatrix

P–PPE

 Note:

FieldworkwithamediumtoextremeriskscorerequiresaFieldworkplan.

  Category

Inherent Riskscore

CananyonebeadverselyaffectedbytheENVIRONMENTAL conditions:

Likely

●Extremesintemperaturethatcouldcausehyperthermiaor  hypothermia

Moderate

●Weatherconditionssuchasstrongwinds,rainorcontinuous  sunshine(highUV) ●Thelocationisdifficulttoaccess

x = High

●Thelocationisremote

●Theterrainisrocky,uneven,verystep.

Comments(whenandwherehazardispresent) Genericrisksassociatedwithenvironmental conditionsarecoveredinthesubject‐levelrisk fieldworkriskassessment. Workingattheedgesofandwithinfarmdams createsanadditionalriskforthisprojectbecauseof theincreasedlikelihoodofslippinginthemuddy environment.Thisdoesnot,however,raisethe overallriskforenviromentalconditionsbeyondthat inthesubject‐levelriskassessmsent.

Control type P T M

CananyonebeadverselyeffectedbytheFAUNAandFLORA:

●Knownallergiestosensitivitiestoplants ●Denseforestorundergrowth

●Burrowinganimals

Inadditiontocontrolsonsubjectandtutorial levelriskassessments:

Likely

PPEincludestheuseofwadersandgumboots forthewithindamsampinganduseoflife jacketsforboat‐mountedsampling.

Minor

x = Medium

Substitution,recommendedonthesubject andtutoriallevelriskassessments,isnot possibleherebecausethedamshavebeen specificallychosenaprioribecauseoftheir landusehistories. Likely x Moderate

●Bitingandstinginginsects/arachnids

Residual RiskScore

Monitoringofpeopledoingthesamplingby othergroupmembersontheshore.

●Other

●Poisonousfaunasuchassnakes,scorpions,octopi

(CurrentAndProposed)

Trainingintheuseoftheboatwillbeprovided alongwithdemonstrationsofhowtowalkin waterusingwaders.

●Therearebodiesofwatersuchasdams,riversortheocean ●Workingatheights(egabseiling)

Controldescription

=

Thisprojectdoesnotpresentanyadditionalrisks fromfloraandfaunabeyondthosedescribedinthe subject‐levelandtutorial‐levelriskassessmsents.

P T G

Controlsstatedinthesubject‐leveland tutorial‐levelriskassessmentsare appropriate.

Unlikely x Moderate =

Is

Medium

High

●Other CananyonebeinjuredfromthePLANTand/orEQUIPMENTused duringthefieldwork:

safety.unimelb.edu.au

Likely

Thisprojectwilluseasmallinflatableboattocollect P sedimentssamplesatdepthsgreaterthanwadable.

Inadditiontolifejacketsstipulatedinthe tutorial‐levelriskassessment,substitutionwill

Unlikely

HEALTHASAFETY:FIELDWORKRISKASSESSMENTFORM3 Date:May2018Version:2.1Authorisedby:Manager,Health&Safety,OperationsNextReview:May2023 ©TheUniversityofMelbourne–Uncontrolledwhenprinted.

Category

Inherent Riskscore

Comments(whenandwherehazardispresent) Asnotedinthetutorial‐levelriskassessment,this carriesariskofcapsizeordeflation

●Struck,crushedorentangled

●Cutorstabbed

x

●Shearingorfriction

●Slip,triporfall

Moderate

●Manualhandling/ergonomics

●Vibration

S T E

= High

●Other

CananyonebeinjuredoradverselyeffectedbyCHEMICALS ●Storage

Control type

NA

●Handling

●Decanting/Mixing

●Applying/Using

●Spill/Leak

●Disposal

Controldescription (CurrentAndProposed) beemployedbyonlyallowingstrong‐ swimmingmembersofthegrouptouse samplefromtheboat,Trainingwillbe employedinthesafeuseoftheboat,andan Engineeringcontrolwillbeattachingtheboat totheshoreatalltimesthroughasafetyline

Nochemicalareusedinthethedatacollectionor analysisforthisproject

NA



TheEckmangrabsamplerweighsapproximately5 kgwhenemptyand7‐8kgwhenfullyloadedwitha saturatedsample.Thiscarriesagreaterriskof manualhandlinginjuries,especiallyattemptingto bringthegrabintotheboat,thanisacknowledged inthetutorial‐levelriskassessment.

S

Samplinginthedamswillbeundertakenby physicallystrongermembersoftheresearch team.





Residual RiskScore x Moderate = Medium

NA

●Other CananyonebeinjuredoradverselyeffectedfromtheMANUAL HANDLINGrequirementsoftheactivity: ●Excessiveeffort

●Awkwardpostures

●Repetitivebodymovementorposture ●Lackofconsiderationforhumanbehaviourcausingmentalor  physicalstress

Possible x Moderate = Medium

A

Unlikely x Minor

Whentransportingthegrabsamplertothe damsites,itwillonlybecarriedfora maximumof10minutesbyoneteammember

Low





=

●Other OTHER





  

safety.unimelb.edu.au



HEALTHASAFETY:FIELDWORKRISKASSESSMENTFORM4 Date:May2018Version:2.1Authorisedby:Manager,Health&Safety,OperationsNextReview:May2023 ©TheUniversityofMelbourne–Uncontrolledwhenprinted.

STEP4–IDENTIFYTHESUPPORTSYSTEMREQUIREMENTSFORFIELDWORK Foreachofthecategories: 

Identifytherequirementsforeachofthesupportsystemcategoriesthatwillbeusedduringthefieldwork.



Describethepossiblehazardsoradverseoutcomesthatmaybeassociatedwiththesupportsystem.



Specificcontrolstomitigateorreducethepossiblehazardsoradverseoutcomes.

 WhatAretheRequirementsfortheFollowingSUPPORTSYSTEMS:

PossibleHazardsorAdverseOutcomes

ControlDescription (CurrentandProposed0

SeePlantandEquipmentassessmentabove Inadditiontobushazardsidentifiedinsubjectandtutorial‐level riskassessments,theuseoftheinflatableboatposesanextrarisk

TRANSPORT ●Roadvehicle/car

●Fourwheeldrive

●Minibus

●Bus

●Boat

●Bicycle

●Other Hazardsassessedandcontrolledintutorial‐levelandsubject‐level       riskassessments.

COMMUNICATIONandNAVIGATION ●Mobilephone

●Landline

●Satelliteradio

●Marineradio

●Compass

●Maps

●Satellitenavigation

●Other–specify

FOODandWATER ●Takefood:Numberofdays:     

Hazardsassessedandcontrolledintutorial‐levelandsubject‐level        riskassessments.

●Takewater:Numberoflitres:     



●Hygiene–waterforwashing ●Toiletarrangementsandrequirements ●Hygiene–litter

●Otherfactors

LEGALCOMPLIANCE ●Boatlicence

●Fishinglicence

●Firearms

●Moisturegaugeuselicence

Hazardsassessedandcontrolledintutorial‐levelandsubject‐level       riskassessments.

●PermitsforNationalParksentry/removalofspecimens ●Firesintheopen

●Other Hazardsassessedandcontrolledintutorial‐levelandsubject‐level       riskassessments.

EMERGENCYPLAN ●Firstaidarrangements ●Medicalconditions/fitnessofparticipants ●Communicationarrangements ●Closesthelp‐remoteness ●Transportarrangements

●Other

 safety.unimelb.edu.au

HEALTHASAFETY:FIELDWORKRISKASSESSMENTFORM5 Date:May2018Version:2.1Authorisedby:Manager,Health&Safety,OperationsNextReview:May2023 ©TheUniversityofMelbourne–Uncontrolledwhenprinted.

STEP5–IMPLEMENTATIONANDCONSULTATIONPROCESS Determinethepersonresponsibleforreviewingandimplementingtheriskassessmentincludingtheidentifiedcontrols.Forfieldworkactivitiesassessedas amediumtoextremerisk,ensurethataFieldworkplan hasbeencompleted,reviewedandsignedoff. Obtaintheauthorisationofthemanagementrepresentative. EnsuretheHSR(ifapplicable)hasbeenconsulted.Ensuretheparticipant(s)undertakingthefieldworkhavebeenconsulted. Recordbelowthenamesofthepersonsconsulted. Managementrepresentative



HSR/Employeerepresentative

DeannaStrangis

Employee(s)



Employee(s)



Employee(s)



PersonResponsibleforimplementation

AngusWebb(subjectcoordinator)

Fieldworkparticipants

Groupmembernames

Multipleparticipants/groupswillbriefedonriskassessmentand fieldworkpriortotheactivity



Forlargegroupslistonaseparateformandattach

Extrawritingroom‐usethispagetoenterextendedcommentsordescriptions 

 ForuseinconjunctionwiththeHealth&Safety:RiskmanagementrequirementsandtheHealth&Safety:Off‐campusrequirements. Forfurtherinformation,refertohttp://safety.unimelb.edu.au/management/implementorcontactyourHealthandSafetyBusinessPartner.

safety.unimelb.edu.au

HEALTHASAFETY:FIELDWORKRISKASSESSMENTFORM6 Date:May2018Version:2.1Authorisedby:Manager,Health&Safety,OperationsNextReview:May2023 ©TheUniversityofMelbourne–Uncontrolledwhenprinted....