Philippines Construction Equipment RatesItem No. EquipmentRate per HourSUPPORT EQUIPMENTItem No. EquipmentRate per Hour 1 Crawler Loader (80kW / 1 – 2 cu) 2830 – Cost Range 2 Crawler Dozer (125kW) 3220 – 3 Wheel Loader (2 – 3 cu) 2810 – 4 Backhoe Crawler (0 – 1 cu) 2420 – 5 Backhoe / Pavement Breake...


Description

Philippines Construction Equipment Rates Rate per Hour Cost Range Crawler Loader (80kW / 1.5 – 2.0 cu.m) 2830 – 3670 Crawler Dozer (125kW) 3220 – 4850 Wheel Loader (2.0 – 3.0 cu.m) 2810 – 4200 Backhoe Crawler (0.75 – 1.0 cu.m) 2420 – 3560 Backhoe / Pavement Breaker (1.5 cu.m) 4110 – 5240 Motor Grader ( 90 – 100 kW) 2120 – 2670 Pneumatic Tire Roller ( 20 – 24 MT) 2740 – 3360 Vibratory Drum Roller ( 10 – 14 MT) 2700 – 3150 Dump Truck ( 8.0 – 12.0 cu.m) 1650 – 2100 Cargo Truck Small (5 – 8 MT) 1230 – 1460 Cargo Truck Small (10 – 15 MT) 1550 – 1910 Transit Mixer (5.0 -8.0 cu.m) 1830 – 2430 Concrete Batching Plant (80 – 100 cu.m/hr) 3250 – 5230 Concrete Trimmer/Slipform Paver (1 meter width) 4250 – 4820 Asphalt Distributor Truck (2500 – 3500 Gallons) 1700 – 2340 Asphalt Finisher (3 meter width) 2730 – 3090 Truck with Boom, small (6-10 MT) 1450 – 1760 Truck with Boom, small (12 – 15 MT) 1860 – 2450 Crawler Crane (21-25 MT) 2780 – 3560 Diesel Pile Hammer 1915 – 2369

Item No. Equipment 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20

SUPPORT EQUIPMENT Rate per Hour Cost Range Vibratory Pile Driver 926 – 1121 Bagger Mixer (1 – 2 bags) 480 – 696 Concrete Vibrator 402 – 471 Air Compressor – Small 347 – 419 Air Compressor – Big 677 – 818 Bar Cutter 292 – 321 Bar Bender 384 – 422 Jack Hammer 309 – 340 Tamping Rammer 297 – 331 Welding Machine, Portable, 300A 662 – 702 Welding Machine, 600A 831 – 1038 Generator Set 15-25kVA 452 – 581 Generator Set 50kVA 809 – 977 Sump Pump (Dewatering), 0.75 – 2HP 199 – 228

Item No. Equipment 21 22 23 24 25 26 27 28 29 30 31 32 33 34

35 36 37

Sump Pump (Dewatering), 5HP Road Paint Stripper Road Paint Applicator

397 – 456 181 – 192 470 – 603

If your company owns a specific equipment, it will be easier to evaluate since you can verify the maintenance history of that equipment. You can add the cost for a mechanic, parts replacement and maintenance the equipment will need during the period of your project. From that analysis you made, you can assess if it will be better to purchase a new equipment rather than to use an old one because of the incremental cost due to maintenance and parts replacement. Purchasing new equipment will always make your project cost proposal high. What we usually do is that even though we purchased a new equipment for that project we still use the rental rates on our estimate since we foresee that we can use it to our other future projects. This will be a great advantage since brand new will be less prone to breakdowns that can cause delays on the project....