PEKERJAAN CUT AND FILL LOKASI KOTA BATAM PROVINSI KEPULAUAN RIAU TAHUN ANGARARAN 2017 DILAKSANAKAN OLEH KOMTRAKTOR PELAKSANA TIME SCHEDULE PENGGARAN BIAYA No. Paket Kontrak : ....................................................... Nama Paket : Cut And Fill Prop / Kab / Kodya : Kepri /Kota Batam VOLU...


Description

PEKERJAAN CUT AND FILL LOKASI KOTA BATAM PROVINSI KEPULAUAN RIAU TAHUN ANGARARAN 2017

DILAKSANAKAN OLEH KOMTRAKTOR PELAKSANA

TIME SCHEDULE PENGGARAN BIAYA No. Paket Kontrak Nama Paket Prop / Kab / Kodya

: ....................................................... : Cut And Fill : Kepri /Kota Batam VOLUME

NO

SATUAN

HARGA SATUAN

J U M L A H

(Rp.)

(Rp.)

JENIS PEKERJAAN

BOBOT

WAKTU PELAKSANAAN PEKERJAAN 10 BULAN

(%)

KOMULATIF

BULAN KE - 1

BULAN KE - 2

BULAN KE - 3

BULAN KE - 4

BULAN KE - 5

BULAN KE - 6

BULAN KE - 7

BULAN KE - 8

BULAN KE - 9

BULAN KE - 10

BULAN KE - 11

BULAN KE - 12

1

2

3

4

5

6

7

8

9

10

11

12

%

DIVISI 1. UMUM 1.2

Mobilisasi

1,00

Ls

229.525.000,00

Jumlah Harga Pekerjaan DIVISI 1 (masuk pada Rekapitulasi Perkiraan Harga Pekerjaan)

229.525.000,00

0,0574

%

0,0574

0,0574

229.525.000,00

DIVISI 3. PEKERJAAN TANAH 3.1.(1a) Galian Biasa

2.379.985,90



79.599,87

189.446.568.241,83

47,3616

%

3.2.(1)

Timbunan Biasa Galian Setempat

2.381.918,10



83.113,80

197.970.264.579,78

49,4926

%

3.4.(1)

Pembersihan dan Pengupasan Lahan

4.761.904,00

2.588,76

12.327.418.062,40

3,0819

%

3.4.(2)

Pemotongan Pohon Pilihan diameter 15 – 30 cm

74,00

buah

182.974,56

13.540.117,63

0,0034

%

3,0819 0,0034

3,0819 0,0034

3.4.(3)

Pemotongan Pohon Pilihan diameter 30 – 50 cm

52,00

buah

245.539,34

12.768.045,88

0,0032

%

0,0032

0,0032

M2

Jumlah Harga Pekerjaan DIVISI 3 (masuk pada Rekapitulasi Perkiraan Harga Pekerjaan)

4,3056 4,4993

4,3056 4,4993

4,3056 4,4993

4,3056 4,4993

4,3056 4,4993

4,3056 4,4993

4,3056 4,4993

4,3056 4,4993

4,3056 4,4993

4,3056 4,4993

4,3056 4,4993

47,3616 49,4926

399.770.559.047,52 100,0000

% Total Komulatif Total

3,1458

8,8049

8,8049

8,8049

8,8049

8,8049

8,8049

8,8049

8,8049

8,8049

8,8049

8,8049

3,1458

11,9507

20,7557

29,5606

38,3655

47,1704

55,9754

64,7803

73,5852

82,3901

91,1951

100,0000

(A) Jumlah Harga Pekerjaan ( termasuk Biaya Umum dan Keuntungan )

400.000.084.047,52

1.258.325.122.590,41

4.780.296.330.059,62

8.302.267.537.528,83

11.824.238.744.998,00

15.346.209.952.467,30

18.868.181.159.936,50

22.390.152.367.405,70

25.912.123.574.874,90

29.434.094.782.344,10

32.956.065.989.813,30

36.478.037.197.282,50

40.000.008.404.751,70

(B) Pembulatan

400.000.000.000,00

1.258.325.100.000,00

4.780.296.300.000,00

8.302.267.500.000,00

11.824.238.700.000,00

15.346.209.900.000,00

18.868.181.100.000,00

22.390.152.300.000,00

25.912.123.500.000,00

29.434.094.700.000,00

32.956.065.900.000,00

36.478.037.100.000,00

40.000.008.400.000,00

Diperiksa Oleh : PT. Mulia Sejahtera Utama

Deki Hertomo Kuasa Direktur Utama

100,000

REKAPITULASI PERKIRAAN HARGA PEKERJAAN No. Paket Kontrak Nama Paket Prop / Kab / Kodya

: ........................................ : Cut And Fill : Kepri /Kota Batam

No. Divisi

Uraian

1

Umum

2

Drainase

3

Pekerjaan Tanah

Jumlah Harga Pekerjaan (Rupiah) 229.525.000,00 399.770.559.047,52

(A) Jumlah Harga Pekerjaan ( termasuk Biaya Umum dan Keuntungan )

400.000.084.047,52

(B) Pembulatan

400.000.000.000,00

Terbilang :

Empat ratus milyard rupiah

Diperiksa Oleh : PT. Intan Jaya Nusantara Rempang

Rahmat Hidayat VP. Operasional

DAFTAR KUANTITAS DAN HARGA No. Paket Kontrak Nama Paket Prop / Kab / Kodya

: ……………………………………………… : Cut And Fill : Kepri /Kota Batam

No. Mata Pembayaran

Uraian

Satuan

Perkiraan Kuantitas

a

b

c

d

1.2 1,8 1.8.(1) 1.18.(1) 1.18.(2) 1.18.(3) 1.18.(4) 1.18.(5) 1.18.(6) 1.18.(7) 1.18.(8) 1.20.(1) 1.20.(2) 1,21

DIVISI 1. UMUM Mobilisasi Manajemen dan Keselamatan Lalu Lintas Pemeliharaan & Perlindungan Lalu Lintas Relokasi Tiang Telpon yang ada Relokasi Tiang Listrik yang ada, Tegangan rendah Relokasi Tiang Listrik yang ada, Tegangan menengah Relokasi Pipa Utilitas Gas yang Ada Relokasi Utilitas Pesawat Lalu Lintas yang Ada Relokasi Tiang Pesawat Lalu Lintas yang Ada Relokasi Panel Listrik yang ada Relokasi Tiang Lampu Penerangan Jalan Pengeboran, termasuk SPT dan Laporan Sondir termasuk Laporan Manajemen Mutu

LS LS LS Buah Buah Buah M' Unit Buah Buah Buah M1 M1 LS

1,00

Harga Satuan (Rupiah) e

229.525.000,00

Jumlah Harga Pekerjaan DIVISI 1 (masuk pada Rekapitulasi Perkiraan Harga Pekerjaan)

Jumlah Harga-Harga (Rupiah) f = (d x e)

229.525.000,00

229.525.000,00

DIVISI 2. DRAINASE 2.1.(1)

Galian untuk Selokan Drainase dan Saluran Air

M3

2.2.(1)

Pasangan Batu dengan Mortar

M3

2.3.(1)

Gorong-gorong Pipa Beton Bertulang, diameter dalam 35 - 45 cm

M1

2.3.(2)

Gorong-gorong Pipa Beton Bertulang, diameter 55 - 65 cm

M1

2.3.(3)

Gorong-gorong Pipa Beton Bertulang, diameter dalam 75 - 85 cm

2.3.(4) 2.3.(5)

Gorong-gorong Pipa Beton Bertulang, diameter dalam 95 - 105 cm Gorong2 Pipa Baja Bergelombang

M1 M1

2.3.(6)

Gorong-gorong Pipa Beton Tanpa Tulangan diameter dalam 20 cm

Ton M1

2.3.(7)

Gorong-gorong Pipa Beton Tanpa Tulangan diameter dalam 25 cm

M1

2.3.(8)

Gorong-gorong Pipa Beton Tanpa Tulangan diameter dalam 30 cm

M1

2.3.(9)

Saluran berbentuk U Tipe DS 1

M1

2.3.(10) 2.3.(11)

Saluran berbentuk U Tipe DS 2 Saluran berbentuk U Tipe DS 3

M1

2.3.(12) 2.3.(13)

Beton K250 (fc’ 20) untuk struktur drainase beton minor Baja Tulangan untuk struktur drainase beton minor

2.3.(14)

Pasangan Batu tanpa Adukan (Aanstamping)

M3 Kg M3

2.4.(1)

Bahan Porous untuk Bahan Penyaring (Filter)

M3

2.4.(2) 2.4.(3)

Anyaman Filter Plastik

M2

Pipa Berlubang Banyak (Perforated Pipe) untuk Pekerjaan Drainase Bawah Permukaan

M1

M1

Jumlah Harga Pekerjaan DIVISI 2 (masuk pada Rekapitulasi Perkiraan Harga Pekerjaan)

DIVISI 3. PEKERJAAN TANAH 3.1.(1a)

Galian Biasa

M3

3.1.(1b)

Galian Cadas Muda

M3

3.1.(2)

Galian Batu

M3

3.1.(3)

Galian Struktur dengan kedalaman 0 - 2 meter

3.1.(4)

Galian Struktur dengan kedalaman 2 - 4 meter

M3 M3

3.1.(5)

Galian Struktur dengan kedalaman 4 - 6 meter

M3

3.1.(6)

Galian Perkerasan Beraspal dengan Cold Milling Machine

M3

3.1.(7)

Galian Perkerasan Beraspal tanpa Cold Milling Machine

M3

3.1.(8)

Galian Perkerasan berbutir

M3

3.1.(9).

Galian Perkerasan Beton

M3

3.2.(1) 3.2.(2)

Timbunan Biasa Galian Setempat Timbunan Pilihan

M3

3.2.(3)

Timbunan Pilihan (diukur diatas bak truk)

M3

3.3.(1)

Penyiapan Badan Jalan

3.4.(1) 3.4.(2) 3.4.(3) 3.4.(4) 3.4.(5)

Pembersihan dan Pengupasan Lahan Pemotongan Pohon Pilihan diameter 15 – 30 cm Pemotongan Pohon Pilihan diameter 30 – 50 cm Pemotongan Pohon Pilihan diameter 50 – 75 cm Pemotongan Pohon Pilihan diameter > 75 cm Jumlah Harga Pekerjaan DIVISI 3 (masuk pada Rekapitulasi Perkiraan Harga Pekerjaan)

2.379.985,90

79.599,87

189.446.568.241,83

2.381.918,10

83.113,80

197.970.264.579,78

4.761.904,00 74,00 52,00

2.588,76 182.974,56 245.539,34

12.327.418.062,40 13.540.117,63 12.768.045,88

M3 M2 M2 buah buah buah buah

399.770.559.047,52

ITEM PEMBAYARAN NO. JENIS PEKERJAAN

: 1.2 : MOBILISASI

% TERHADAP TOTAL BIAYA PROYEK =

0,0574 % Lembar 1.2-1

No.

URAIAN

A.

Sewa Tanah

B.

PERALATAN Periksa lembar 1.2-2

C.

M2

VOL.

10.000,00

JUMLAH HARGA (Rp.)

4.000,00

40.000.000,00

43.250.000,00

1 2 3 4 5 6

FASILITAS KONTRAKTOR Base Camp Kantor Barak Bengkel Gudang, dan lain-lain ......................

M2 M2 M2 M2 M2 ....

150,00 80,00 80,00 100,00 100,00 0

165.000,00 165.000,00 145.000,00 125.000,00 125.000,00 0,00

24.750.000,00 13.200.000,00 11.600.000,00 12.500.000,00 12.500.000,00 0,00

1

FASILITAS LABORATORIUM Ruang Laboratorium (sesuai Gambar)

LS M2

0 0

55.000,00

0,00 0,00

Soil & Aggregate Testing Compaction Test CBR Test Specific Gravity Atterberg Limits Grain Size Analysis Field Density Test by Sand Cone Methode Moisture Content Abrasion of Aggregate by Los Angeles Machine

LS Set Set Set Set Set Set Set Bln

1 0 0 0 0 0 0 0 0

15.000.000,00 20.000.000,00 5.000.000,00 5.000.000,00 12.500.000,00 6.500.000,00 6.000.000,00 5.000.000,00

0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00

Bituminous Testing Marshall Asphalt Test Extraction Test, Centrifuge/Refflux Method Specific Gravity for Coarse Aggregate Specific Gravity for Fine Aggregate Mix Air Viod Content (Accurate Method) Core Drill Metal Thermometer Accessories and Tolls Penetration Test Softening Point Refusal Density Compactor

LS Set Set Set Set Set Set Set Set Bln Set Set

1 0 0 0 0 0 0 0 0 0 0 0

20.000.000,00 9.000.000,00 9.000.000,00 9.000.000,00 15.000.000,00 15.000.000,00 1.000.000,00 5.000.000,00 1.000.000,00 6.000.000,00 15.000.000,00

0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00

4

Concrete Testing Slump Cone Cylinder/Cube Mould for Compressive Strength Beam Mould for Flexural Strength (RIGID) Crushing Machine

LS Set Set Set Set

1,00 0 0 0 0

5.000.000,00 500.000,00 10.000.000,00 10.000.000,00 50.000.000,00

5.000.000,00 0,00 0,00 0,00 0,00

5

Pendukung

(Periksa Fasilitas Laboratorium)

Ls

1

0,00

6

Operasional

(Periksa Fasilitas Laboratorium)

Ls

0

0,00

LS LS LS .... .... ....

0 0

Set Set Set Ls Ls ....

2,00 5,00 2,00 1,00 1,00 0

D.

2

3

E. E.I. 1 2 3 4 5 6 E.II. 1 2 3 4 5 6 E.III.

1 2

F.

SATUAN

HARGA SATUAN (Rp.)

MOBILISASI LAINNYA PEKERJAAN DARURAT Perkuatan Jembatan Lama Pemeliharaan Jalan Kerja / Samping Pembuatan Jembatan Sementara ...................... ...................... ...................... LAIN-LAIN Komunikasi Lapangan Lengkap Pelaporan (Lap. Harian, Mingguan, Bulanan), Sertifikat Bulanan dan Back Up Data Gambar Kerja (Shop Drawing dan Asbuilt Drawing) Pengukuran/Rekayasa lapangan Papan Proyek ...................... SISTEM MANAJEMEN KERLAMATAN DAN KESEHATAN KERJA (SMK3) Tenaga Kesehatan Perlengkapan P3K

DEMOBILISASI

Total Biaya Mobilisasi Catatan : Jumlah yang tercantum pada masing-masing item mobilisasi di atas sudah termasuk over-head dan laba serta seluruh pajak dan bea (kecuali PPn), dan pengeluaran lainnya.

0,00 0,00 0,00 0,00 0,00

Orang/Bulan Ls

LS

0,00 100.000.000,00

1,00

5.000.000,00 1.000.000,00 5.500.000,00 30.000.000,00 750.000,00 0,00

5.000.000,00 5.000.000,00 11.000.000,00 30.000.000,00 750.000,00 0,00

1.200.000,00 2.000.000,00

0,00 2.000.000,00

12.975.000,00

12.975.000,00

229.525.000,00

ITEM PEMBAYARAN NO. JENIS PEKERJAAN

: 1.2 : MOBILISASI Lembar 1.2-2

No.

B. 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53

JENIS ALAT

KODE ALAT

SATUAN

VOL.

HARGA SATUAN

JUMLAH HARGA

(Rp.)

(Rp.)

PERALATAN ASPHALT MIXING PLANT ASPHALT FINISHER ASPHALT SPRAYER BULLDOZER 100-150 HP COMPRESSOR 4000-6500 L\M CONCRETE MIXER 0.3-0.6 M3 CRANE 10-15 TON DUMP TRUCK 3.5 TON DUMP TRUCK 10 TON EXCAVATOR 80-140 HP FLAT BED TRUCK 3-4 M3 GENERATOR SET MOTOR GRADER >100 HP TRACK LOADER 75-100 HP WHEEL LOADER 1.0-1.6 M3 THREE WHEEL ROLLER 6-8 T TANDEM ROLLER 6-8 T. TIRE ROLLER 8-10 T. VIBRATORY ROLLER 5-8 T. CONCRETE VIBRATOR STONE CRUSHER WATER PUMP 70-100 mm WATER TANKER 3000-4500 L. PEDESTRIAN ROLLER TAMPER JACK HAMMER FULVI MIXER CONCRETE PUMP TRAILER 20 TON PILE DRIVER + HAMMER CRANE ON TRACK 35 TON WELDING SET BORE PILE MACHINE ASPHALT LIQUID MIXER TRONTON COLD MILLING MACHINE ROCK DRILL BREAKER COLD RECYCLER HOT RECYCLER AGGREGAT (CHIP) SPREADER ASPHALT DISTRIBUTOR SLIP FORM PAVER CONCRETE PAN MIXER CONCRETE BREAKER ASPAHLT TANKER CEMENT TANKER CONDRETE MIXER (350) VIBRATING RAMMER TRUK MIXER (AGITATOR) BORE PILE MACHINE CRANE ON TRACK 75-100 TON ALAT UKUR THEODOLID WATER PASS

Total untuk Item B pada Lembar 1

E01 E02 E03 E04 E05 E06 E07 E08 E09 E10 E11 E12 E13 E14 E15 E16 E17 E18 E19 E20 E21 E22 E23 E24 E25 E26 E27 E28 E29 E30 E31 E32 E33 E34 E35 E37 E36 E38 E39 E40 E41 E42 E43 E44 E45 E46 E47 E48 E49 E50 E51 LS LS

Unit Unit Unit Unit Unit Unit Unit Unit Unit Unit Unit Unit Unit Unit Unit Unit Unit Unit Unit Unit Unit Unit Unit Unit Unit Unit Unit Unit Unit Unit Unit Unit Unit Unit Unit Unit Unit Unit Unit Unit Unit Unit Unit Unit Unit Unit Unit Unit Unit Unit Unit BH BH

0 0 0 4,00 0

200.000.000 2.500.000 1.500.000 2.500.000,00 1.500.000,00

0 0 0 10.000.000,00 0,00

0 15,00 1,00 3,00 0 2,00 2,00 0,00 1,00 0 0 0 2,00

150.000,00 350.000,00 400.000,00 2.500.000,00 150.000,00 500.000,00 2.500.000,00 500.000,00 2.500.000,00 1.500.000,00 1.500.000,00 1.500.000,00 2.500.000,00

0,00 5.250.000,00 400.000,00 7.500.000,00 0,00 1.000.000,00 5.000.000,00 0,00 2.500.000,00 0,00 0,00 0,00 5.000.000,00

0 2,00 1,00 0 0 0 0 0 1,00 0,00 0 0 0 0

40.000.000,00 150.000,00 250.000,00 50.000,00 50.000,00 100.000,00 500.000,00 500.000,00 2.500.000,00 1.000.000,00 1.000.000,00 200.000,00 500.000,00 300.000,00

1,00 1,00

3.000.000,00 550.000,00

0,00 300.000,00 250.000,00 0,00 0,00 0,00 0,00 0,00 2.500.000,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 3.000.000,00 550.000,00

43.250.000,00

HARGA DASAR SATUAN UPAH No.

1. 2. 3. 4. 5. 6. 7. 8. 9. 10. 11. 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31

URAIAN

Pekerja Tukang Mandor Operator Pembantu Operator Sopir / Driver Pembantu Sopir / Driver Mekanik Pembantu Mekanik Kepala Tukang

KODE

SATUAN

(L01) (L02) (L03) (L04) (L05) (L06) (L07) (L08) (L09) (L10)

Jam Jam Jam Jam Jam Jam Jam Jam Jam Jam

HARGA SATUAN ( Rp.)

KETERANGAN

12.142,86 17.857,14 21.428,57 22.857,14 17.142,86 21.428,57 12.857,14 21.428,57 14.285,71 18.571,43

85.000,000 125.000,000 150.000,000 160.000,000 120.000,000 150.000,000 90.000,000 150.000,000 100.000,000 130.000,000

HARGA PEROLEHAN ALAT No.

Jenis Alat

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33

Asphalt Mixing Plant Asphalt Finisher Asphalt Sprayer Bulldozer 100-150 Hp Compressor 4000-6500 L\M Concrete Mixer 0.3-0.6 M3 Crane 10-15 Ton Dump Truck 3-4 M3 Dump Truck Excavator 80-140 Hp Flat Bed Truck 3-4 M3 Generator Set Motor Grader >100 Hp Track Loader 75-100 Hp Wheel Loader 1.0-1.6 M3 Three Wheel Roller 6-8 T Tandem Roller 6-8 T. Tire Roller 8-10 T. Vibratory Roller 5-8 T. Concrete Vibrator Stone Crusher Water Pump 70-100 Mm Water Tanker 3000-4500 L. Pedestrian Roller Tamper Jack Hammer Fulvi Mixer Concrete Pump Trailer 20 Ton Pile Driver + Hammer Crane On Track 35 Ton Welding Set Bore Pile Machine

34

Asphalt Liquid Mixer

35

Trailler 15 Ton

36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56

Rock Drill Breaker Cold Milling Cold Recycler Hot Recycler Aggregat (chip) Spreader Asphalt Distribution Split Form Paver Concrete Pan Mixer Concrete Breaker Asphalt Tanker Cement Tanker Concrete Mixer (350) Vibrating Rammer Truk Mixer Bore Pile Machine Dia 60 Crane On Track 75 - 100Ton Blending Equipment Asphalt Liquid Mixer (kap 20000) Alat tambahan Batubara Direct Alat tambahan Gas Batubara Chain Saw

Harga yang digunakan 3.135.000.000,00 2.205.000.000,00 299.300.000,00 3.347.300.000,00 110.000.000,00 25.000.000,00 65.500.000,00 589.300.000,00 664.700.000,00 5.290.300.000,00 330.800.000,00 125.000.000,00 6.975.557.000,00 1.467.000.000,00 1.643.100.000,00 673.600.000,00 883.100.000,00 600.000.000,00 5.685.380.000,00 5.000.000,00 1.010.989.000,00 5.000.000,00 805.000.000,00 150.000.000,00 17.000.000,00 35.000.000,00 900.000.000,00 112.500.000,00 600.000.000,00 875.000.000,00 850.000.000,00 17.500.000,00 2.250.000.00...