PEKERJAAN CUT AND FILL LOKASI KOTA BATAM PROVINSI KEPULAUAN RIAU TAHUN ANGARARAN 2017 DILAKSANAKAN OLEH KOMTRAKTOR PELAKSANA TIME SCHEDULE PENGGARAN BIAYA No. Paket Kontrak : ....................................................... Nama Paket : Cut And Fill Prop / Kab / Kodya : Kepri /Kota Batam VOLU...
PEKERJAAN CUT AND FILL LOKASI KOTA BATAM PROVINSI KEPULAUAN RIAU TAHUN ANGARARAN 2017
DILAKSANAKAN OLEH KOMTRAKTOR PELAKSANA
TIME SCHEDULE PENGGARAN BIAYA No. Paket Kontrak Nama Paket Prop / Kab / Kodya
: ....................................................... : Cut And Fill : Kepri /Kota Batam VOLUME
NO
SATUAN
HARGA SATUAN
J U M L A H
(Rp.)
(Rp.)
JENIS PEKERJAAN
BOBOT
WAKTU PELAKSANAAN PEKERJAAN 10 BULAN
(%)
KOMULATIF
BULAN KE - 1
BULAN KE - 2
BULAN KE - 3
BULAN KE - 4
BULAN KE - 5
BULAN KE - 6
BULAN KE - 7
BULAN KE - 8
BULAN KE - 9
BULAN KE - 10
BULAN KE - 11
BULAN KE - 12
1
2
3
4
5
6
7
8
9
10
11
12
%
DIVISI 1. UMUM 1.2
Mobilisasi
1,00
Ls
229.525.000,00
Jumlah Harga Pekerjaan DIVISI 1 (masuk pada Rekapitulasi Perkiraan Harga Pekerjaan)
229.525.000,00
0,0574
%
0,0574
0,0574
229.525.000,00
DIVISI 3. PEKERJAAN TANAH 3.1.(1a) Galian Biasa
2.379.985,90
M³
79.599,87
189.446.568.241,83
47,3616
%
3.2.(1)
Timbunan Biasa Galian Setempat
2.381.918,10
M³
83.113,80
197.970.264.579,78
49,4926
%
3.4.(1)
Pembersihan dan Pengupasan Lahan
4.761.904,00
2.588,76
12.327.418.062,40
3,0819
%
3.4.(2)
Pemotongan Pohon Pilihan diameter 15 – 30 cm
74,00
buah
182.974,56
13.540.117,63
0,0034
%
3,0819 0,0034
3,0819 0,0034
3.4.(3)
Pemotongan Pohon Pilihan diameter 30 – 50 cm
52,00
buah
245.539,34
12.768.045,88
0,0032
%
0,0032
0,0032
M2
Jumlah Harga Pekerjaan DIVISI 3 (masuk pada Rekapitulasi Perkiraan Harga Pekerjaan)
4,3056 4,4993
4,3056 4,4993
4,3056 4,4993
4,3056 4,4993
4,3056 4,4993
4,3056 4,4993
4,3056 4,4993
4,3056 4,4993
4,3056 4,4993
4,3056 4,4993
4,3056 4,4993
47,3616 49,4926
399.770.559.047,52 100,0000
% Total Komulatif Total
3,1458
8,8049
8,8049
8,8049
8,8049
8,8049
8,8049
8,8049
8,8049
8,8049
8,8049
8,8049
3,1458
11,9507
20,7557
29,5606
38,3655
47,1704
55,9754
64,7803
73,5852
82,3901
91,1951
100,0000
(A) Jumlah Harga Pekerjaan ( termasuk Biaya Umum dan Keuntungan )
400.000.084.047,52
1.258.325.122.590,41
4.780.296.330.059,62
8.302.267.537.528,83
11.824.238.744.998,00
15.346.209.952.467,30
18.868.181.159.936,50
22.390.152.367.405,70
25.912.123.574.874,90
29.434.094.782.344,10
32.956.065.989.813,30
36.478.037.197.282,50
40.000.008.404.751,70
(B) Pembulatan
400.000.000.000,00
1.258.325.100.000,00
4.780.296.300.000,00
8.302.267.500.000,00
11.824.238.700.000,00
15.346.209.900.000,00
18.868.181.100.000,00
22.390.152.300.000,00
25.912.123.500.000,00
29.434.094.700.000,00
32.956.065.900.000,00
36.478.037.100.000,00
40.000.008.400.000,00
Diperiksa Oleh : PT. Mulia Sejahtera Utama
Deki Hertomo Kuasa Direktur Utama
100,000
REKAPITULASI PERKIRAAN HARGA PEKERJAAN No. Paket Kontrak Nama Paket Prop / Kab / Kodya
: ........................................ : Cut And Fill : Kepri /Kota Batam
No. Divisi
Uraian
1
Umum
2
Drainase
3
Pekerjaan Tanah
Jumlah Harga Pekerjaan (Rupiah) 229.525.000,00 399.770.559.047,52
(A) Jumlah Harga Pekerjaan ( termasuk Biaya Umum dan Keuntungan )
400.000.084.047,52
(B) Pembulatan
400.000.000.000,00
Terbilang :
Empat ratus milyard rupiah
Diperiksa Oleh : PT. Intan Jaya Nusantara Rempang
Rahmat Hidayat VP. Operasional
DAFTAR KUANTITAS DAN HARGA No. Paket Kontrak Nama Paket Prop / Kab / Kodya
: ……………………………………………… : Cut And Fill : Kepri /Kota Batam
No. Mata Pembayaran
Uraian
Satuan
Perkiraan Kuantitas
a
b
c
d
1.2 1,8 1.8.(1) 1.18.(1) 1.18.(2) 1.18.(3) 1.18.(4) 1.18.(5) 1.18.(6) 1.18.(7) 1.18.(8) 1.20.(1) 1.20.(2) 1,21
DIVISI 1. UMUM Mobilisasi Manajemen dan Keselamatan Lalu Lintas Pemeliharaan & Perlindungan Lalu Lintas Relokasi Tiang Telpon yang ada Relokasi Tiang Listrik yang ada, Tegangan rendah Relokasi Tiang Listrik yang ada, Tegangan menengah Relokasi Pipa Utilitas Gas yang Ada Relokasi Utilitas Pesawat Lalu Lintas yang Ada Relokasi Tiang Pesawat Lalu Lintas yang Ada Relokasi Panel Listrik yang ada Relokasi Tiang Lampu Penerangan Jalan Pengeboran, termasuk SPT dan Laporan Sondir termasuk Laporan Manajemen Mutu
LS LS LS Buah Buah Buah M' Unit Buah Buah Buah M1 M1 LS
1,00
Harga Satuan (Rupiah) e
229.525.000,00
Jumlah Harga Pekerjaan DIVISI 1 (masuk pada Rekapitulasi Perkiraan Harga Pekerjaan)
Jumlah Harga-Harga (Rupiah) f = (d x e)
229.525.000,00
229.525.000,00
DIVISI 2. DRAINASE 2.1.(1)
Galian untuk Selokan Drainase dan Saluran Air
M3
2.2.(1)
Pasangan Batu dengan Mortar
M3
2.3.(1)
Gorong-gorong Pipa Beton Bertulang, diameter dalam 35 - 45 cm
M1
2.3.(2)
Gorong-gorong Pipa Beton Bertulang, diameter 55 - 65 cm
M1
2.3.(3)
Gorong-gorong Pipa Beton Bertulang, diameter dalam 75 - 85 cm
2.3.(4) 2.3.(5)
Gorong-gorong Pipa Beton Bertulang, diameter dalam 95 - 105 cm Gorong2 Pipa Baja Bergelombang
M1 M1
2.3.(6)
Gorong-gorong Pipa Beton Tanpa Tulangan diameter dalam 20 cm
Ton M1
2.3.(7)
Gorong-gorong Pipa Beton Tanpa Tulangan diameter dalam 25 cm
M1
2.3.(8)
Gorong-gorong Pipa Beton Tanpa Tulangan diameter dalam 30 cm
M1
2.3.(9)
Saluran berbentuk U Tipe DS 1
M1
2.3.(10) 2.3.(11)
Saluran berbentuk U Tipe DS 2 Saluran berbentuk U Tipe DS 3
M1
2.3.(12) 2.3.(13)
Beton K250 (fc’ 20) untuk struktur drainase beton minor Baja Tulangan untuk struktur drainase beton minor
2.3.(14)
Pasangan Batu tanpa Adukan (Aanstamping)
M3 Kg M3
2.4.(1)
Bahan Porous untuk Bahan Penyaring (Filter)
M3
2.4.(2) 2.4.(3)
Anyaman Filter Plastik
M2
Pipa Berlubang Banyak (Perforated Pipe) untuk Pekerjaan Drainase Bawah Permukaan
M1
M1
Jumlah Harga Pekerjaan DIVISI 2 (masuk pada Rekapitulasi Perkiraan Harga Pekerjaan)
DIVISI 3. PEKERJAAN TANAH 3.1.(1a)
Galian Biasa
M3
3.1.(1b)
Galian Cadas Muda
M3
3.1.(2)
Galian Batu
M3
3.1.(3)
Galian Struktur dengan kedalaman 0 - 2 meter
3.1.(4)
Galian Struktur dengan kedalaman 2 - 4 meter
M3 M3
3.1.(5)
Galian Struktur dengan kedalaman 4 - 6 meter
M3
3.1.(6)
Galian Perkerasan Beraspal dengan Cold Milling Machine
M3
3.1.(7)
Galian Perkerasan Beraspal tanpa Cold Milling Machine
M3
3.1.(8)
Galian Perkerasan berbutir
M3
3.1.(9).
Galian Perkerasan Beton
M3
3.2.(1) 3.2.(2)
Timbunan Biasa Galian Setempat Timbunan Pilihan
M3
3.2.(3)
Timbunan Pilihan (diukur diatas bak truk)
M3
3.3.(1)
Penyiapan Badan Jalan
3.4.(1) 3.4.(2) 3.4.(3) 3.4.(4) 3.4.(5)
Pembersihan dan Pengupasan Lahan Pemotongan Pohon Pilihan diameter 15 – 30 cm Pemotongan Pohon Pilihan diameter 30 – 50 cm Pemotongan Pohon Pilihan diameter 50 – 75 cm Pemotongan Pohon Pilihan diameter > 75 cm Jumlah Harga Pekerjaan DIVISI 3 (masuk pada Rekapitulasi Perkiraan Harga Pekerjaan)
2.379.985,90
79.599,87
189.446.568.241,83
2.381.918,10
83.113,80
197.970.264.579,78
4.761.904,00 74,00 52,00
2.588,76 182.974,56 245.539,34
12.327.418.062,40 13.540.117,63 12.768.045,88
M3 M2 M2 buah buah buah buah
399.770.559.047,52
ITEM PEMBAYARAN NO. JENIS PEKERJAAN
: 1.2 : MOBILISASI
% TERHADAP TOTAL BIAYA PROYEK =
0,0574 % Lembar 1.2-1
No.
URAIAN
A.
Sewa Tanah
B.
PERALATAN Periksa lembar 1.2-2
C.
M2
VOL.
10.000,00
JUMLAH HARGA (Rp.)
4.000,00
40.000.000,00
43.250.000,00
1 2 3 4 5 6
FASILITAS KONTRAKTOR Base Camp Kantor Barak Bengkel Gudang, dan lain-lain ......................
M2 M2 M2 M2 M2 ....
150,00 80,00 80,00 100,00 100,00 0
165.000,00 165.000,00 145.000,00 125.000,00 125.000,00 0,00
24.750.000,00 13.200.000,00 11.600.000,00 12.500.000,00 12.500.000,00 0,00
1
FASILITAS LABORATORIUM Ruang Laboratorium (sesuai Gambar)
LS M2
0 0
55.000,00
0,00 0,00
Soil & Aggregate Testing Compaction Test CBR Test Specific Gravity Atterberg Limits Grain Size Analysis Field Density Test by Sand Cone Methode Moisture Content Abrasion of Aggregate by Los Angeles Machine
LS Set Set Set Set Set Set Set Bln
1 0 0 0 0 0 0 0 0
15.000.000,00 20.000.000,00 5.000.000,00 5.000.000,00 12.500.000,00 6.500.000,00 6.000.000,00 5.000.000,00
0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00
Bituminous Testing Marshall Asphalt Test Extraction Test, Centrifuge/Refflux Method Specific Gravity for Coarse Aggregate Specific Gravity for Fine Aggregate Mix Air Viod Content (Accurate Method) Core Drill Metal Thermometer Accessories and Tolls Penetration Test Softening Point Refusal Density Compactor
LS Set Set Set Set Set Set Set Set Bln Set Set
1 0 0 0 0 0 0 0 0 0 0 0
20.000.000,00 9.000.000,00 9.000.000,00 9.000.000,00 15.000.000,00 15.000.000,00 1.000.000,00 5.000.000,00 1.000.000,00 6.000.000,00 15.000.000,00
0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00
4
Concrete Testing Slump Cone Cylinder/Cube Mould for Compressive Strength Beam Mould for Flexural Strength (RIGID) Crushing Machine
LS Set Set Set Set
1,00 0 0 0 0
5.000.000,00 500.000,00 10.000.000,00 10.000.000,00 50.000.000,00
5.000.000,00 0,00 0,00 0,00 0,00
5
Pendukung
(Periksa Fasilitas Laboratorium)
Ls
1
0,00
6
Operasional
(Periksa Fasilitas Laboratorium)
Ls
0
0,00
LS LS LS .... .... ....
0 0
Set Set Set Ls Ls ....
2,00 5,00 2,00 1,00 1,00 0
D.
2
3
E. E.I. 1 2 3 4 5 6 E.II. 1 2 3 4 5 6 E.III.
1 2
F.
SATUAN
HARGA SATUAN (Rp.)
MOBILISASI LAINNYA PEKERJAAN DARURAT Perkuatan Jembatan Lama Pemeliharaan Jalan Kerja / Samping Pembuatan Jembatan Sementara ...................... ...................... ...................... LAIN-LAIN Komunikasi Lapangan Lengkap Pelaporan (Lap. Harian, Mingguan, Bulanan), Sertifikat Bulanan dan Back Up Data Gambar Kerja (Shop Drawing dan Asbuilt Drawing) Pengukuran/Rekayasa lapangan Papan Proyek ...................... SISTEM MANAJEMEN KERLAMATAN DAN KESEHATAN KERJA (SMK3) Tenaga Kesehatan Perlengkapan P3K
DEMOBILISASI
Total Biaya Mobilisasi Catatan : Jumlah yang tercantum pada masing-masing item mobilisasi di atas sudah termasuk over-head dan laba serta seluruh pajak dan bea (kecuali PPn), dan pengeluaran lainnya.
0,00 0,00 0,00 0,00 0,00
Orang/Bulan Ls
LS
0,00 100.000.000,00
1,00
5.000.000,00 1.000.000,00 5.500.000,00 30.000.000,00 750.000,00 0,00
5.000.000,00 5.000.000,00 11.000.000,00 30.000.000,00 750.000,00 0,00
1.200.000,00 2.000.000,00
0,00 2.000.000,00
12.975.000,00
12.975.000,00
229.525.000,00
ITEM PEMBAYARAN NO. JENIS PEKERJAAN
: 1.2 : MOBILISASI Lembar 1.2-2
No.
B. 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53
JENIS ALAT
KODE ALAT
SATUAN
VOL.
HARGA SATUAN
JUMLAH HARGA
(Rp.)
(Rp.)
PERALATAN ASPHALT MIXING PLANT ASPHALT FINISHER ASPHALT SPRAYER BULLDOZER 100-150 HP COMPRESSOR 4000-6500 L\M CONCRETE MIXER 0.3-0.6 M3 CRANE 10-15 TON DUMP TRUCK 3.5 TON DUMP TRUCK 10 TON EXCAVATOR 80-140 HP FLAT BED TRUCK 3-4 M3 GENERATOR SET MOTOR GRADER >100 HP TRACK LOADER 75-100 HP WHEEL LOADER 1.0-1.6 M3 THREE WHEEL ROLLER 6-8 T TANDEM ROLLER 6-8 T. TIRE ROLLER 8-10 T. VIBRATORY ROLLER 5-8 T. CONCRETE VIBRATOR STONE CRUSHER WATER PUMP 70-100 mm WATER TANKER 3000-4500 L. PEDESTRIAN ROLLER TAMPER JACK HAMMER FULVI MIXER CONCRETE PUMP TRAILER 20 TON PILE DRIVER + HAMMER CRANE ON TRACK 35 TON WELDING SET BORE PILE MACHINE ASPHALT LIQUID MIXER TRONTON COLD MILLING MACHINE ROCK DRILL BREAKER COLD RECYCLER HOT RECYCLER AGGREGAT (CHIP) SPREADER ASPHALT DISTRIBUTOR SLIP FORM PAVER CONCRETE PAN MIXER CONCRETE BREAKER ASPAHLT TANKER CEMENT TANKER CONDRETE MIXER (350) VIBRATING RAMMER TRUK MIXER (AGITATOR) BORE PILE MACHINE CRANE ON TRACK 75-100 TON ALAT UKUR THEODOLID WATER PASS
Total untuk Item B pada Lembar 1
E01 E02 E03 E04 E05 E06 E07 E08 E09 E10 E11 E12 E13 E14 E15 E16 E17 E18 E19 E20 E21 E22 E23 E24 E25 E26 E27 E28 E29 E30 E31 E32 E33 E34 E35 E37 E36 E38 E39 E40 E41 E42 E43 E44 E45 E46 E47 E48 E49 E50 E51 LS LS
Unit Unit Unit Unit Unit Unit Unit Unit Unit Unit Unit Unit Unit Unit Unit Unit Unit Unit Unit Unit Unit Unit Unit Unit Unit Unit Unit Unit Unit Unit Unit Unit Unit Unit Unit Unit Unit Unit Unit Unit Unit Unit Unit Unit Unit Unit Unit Unit Unit Unit Unit BH BH
0 0 0 4,00 0
200.000.000 2.500.000 1.500.000 2.500.000,00 1.500.000,00
0 0 0 10.000.000,00 0,00
0 15,00 1,00 3,00 0 2,00 2,00 0,00 1,00 0 0 0 2,00
150.000,00 350.000,00 400.000,00 2.500.000,00 150.000,00 500.000,00 2.500.000,00 500.000,00 2.500.000,00 1.500.000,00 1.500.000,00 1.500.000,00 2.500.000,00
0,00 5.250.000,00 400.000,00 7.500.000,00 0,00 1.000.000,00 5.000.000,00 0,00 2.500.000,00 0,00 0,00 0,00 5.000.000,00
0 2,00 1,00 0 0 0 0 0 1,00 0,00 0 0 0 0
40.000.000,00 150.000,00 250.000,00 50.000,00 50.000,00 100.000,00 500.000,00 500.000,00 2.500.000,00 1.000.000,00 1.000.000,00 200.000,00 500.000,00 300.000,00
1,00 1,00
3.000.000,00 550.000,00
0,00 300.000,00 250.000,00 0,00 0,00 0,00 0,00 0,00 2.500.000,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 3.000.000,00 550.000,00
43.250.000,00
HARGA DASAR SATUAN UPAH No.
1. 2. 3. 4. 5. 6. 7. 8. 9. 10. 11. 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31
URAIAN
Pekerja Tukang Mandor Operator Pembantu Operator Sopir / Driver Pembantu Sopir / Driver Mekanik Pembantu Mekanik Kepala Tukang
KODE
SATUAN
(L01) (L02) (L03) (L04) (L05) (L06) (L07) (L08) (L09) (L10)
Jam Jam Jam Jam Jam Jam Jam Jam Jam Jam
HARGA SATUAN ( Rp.)
KETERANGAN
12.142,86 17.857,14 21.428,57 22.857,14 17.142,86 21.428,57 12.857,14 21.428,57 14.285,71 18.571,43
85.000,000 125.000,000 150.000,000 160.000,000 120.000,000 150.000,000 90.000,000 150.000,000 100.000,000 130.000,000
HARGA PEROLEHAN ALAT No.
Jenis Alat
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33
Asphalt Mixing Plant Asphalt Finisher Asphalt Sprayer Bulldozer 100-150 Hp Compressor 4000-6500 L\M Concrete Mixer 0.3-0.6 M3 Crane 10-15 Ton Dump Truck 3-4 M3 Dump Truck Excavator 80-140 Hp Flat Bed Truck 3-4 M3 Generator Set Motor Grader >100 Hp Track Loader 75-100 Hp Wheel Loader 1.0-1.6 M3 Three Wheel Roller 6-8 T Tandem Roller 6-8 T. Tire Roller 8-10 T. Vibratory Roller 5-8 T. Concrete Vibrator Stone Crusher Water Pump 70-100 Mm Water Tanker 3000-4500 L. Pedestrian Roller Tamper Jack Hammer Fulvi Mixer Concrete Pump Trailer 20 Ton Pile Driver + Hammer Crane On Track 35 Ton Welding Set Bore Pile Machine
34
Asphalt Liquid Mixer
35
Trailler 15 Ton
36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56
Rock Drill Breaker Cold Milling Cold Recycler Hot Recycler Aggregat (chip) Spreader Asphalt Distribution Split Form Paver Concrete Pan Mixer Concrete Breaker Asphalt Tanker Cement Tanker Concrete Mixer (350) Vibrating Rammer Truk Mixer Bore Pile Machine Dia 60 Crane On Track 75 - 100Ton Blending Equipment Asphalt Liquid Mixer (kap 20000) Alat tambahan Batubara Direct Alat tambahan Gas Batubara Chain Saw
Harga yang digunakan 3.135.000.000,00 2.205.000.000,00 299.300.000,00 3.347.300.000,00 110.000.000,00 25.000.000,00 65.500.000,00 589.300.000,00 664.700.000,00 5.290.300.000,00 330.800.000,00 125.000.000,00 6.975.557.000,00 1.467.000.000,00 1.643.100.000,00 673.600.000,00 883.100.000,00 600.000.000,00 5.685.380.000,00 5.000.000,00 1.010.989.000,00 5.000.000,00 805.000.000,00 150.000.000,00 17.000.000,00 35.000.000,00 900.000.000,00 112.500.000,00 600.000.000,00 875.000.000,00 850.000.000,00 17.500.000,00 2.250.000.00...