Specifications-Architectural DOCX

Title Specifications-Architectural
Pages 1
File Size 755.3 KB
File Type DOCX
Total Downloads 257
Total Views 888

Summary

MITSUBISHI MOTORS PHILIPPINES CORPORATION PROJECT : TRAINING CENTER LOCATION : No.1 Auto Park Avenue, Greenfield Automative Park Special Economic Zone, Sta.Rosa, Laguna 4026 ARCHITECTURAL SPECIFICATIONS 01000 GENERAL CONDITIONS 01400 QUALITY CONTROL PART 1 - GENERAL 1.01 RELATED DOCUMENTS a. The con...


Description

MITSUBISHI MOTORS PHILIPPINES CORPORATION PROJECT : TRAINING CENTER LOCATION : No.1 Auto Park Avenue, Greenfield Automative Park Special Economic Zone, Sta.Rosa, Laguna 4026 PAGE 1 OF 51 ARCHITECTURAL SPECIFICATIONS 01000 GENERAL CONDITIONS 01400 QUALITY CONTROL PART 1 - GENERAL 1.01 RELATED DOCUMENTS a. The conditions of Contract and Division 1, General Requirements, apply to the work of this Section. 1.02 WORK PERFORMED BY TESTING AGENCY a. The Contractor shall submit a list of testing agencies to be used in performance of the Work. b. The Owner will select an independent Testing Agency from the submitted list or of his own choice to provide testing laboratory services and on-site inspection services, including without limitation testing of soils and concrete. c. Unless otherwise specially agreed, testing shall be accomplished as specified, and all sampling and testing procedures shall conform to applicable PNS, ASTM, D.I.N. or British Standards. Testing personnel shall be qualified and shall be completely familiar with required procedures of testing. d. Technicians representing the Testing Agency shall inspect the materials to be tested and report their findings to the Owner, Architect and the Contractor. 1. Work will be checked as it progresses, but failure to detect any defective work or material shall not in any way prevent later rejection when such defect is discovered, nor shall it obligate the Owner for final acceptance of the part of the Work. 2. When it appears that the material furnished or work performed by the Contractor fails to fulfill specification requirements the Technician shall notify the Owner and the Contractor of such failure. 3. Technicians shall not act as foreman or perform other duties for the Contractor. Technicians are not authorized to revoke, alter, relax, enlarge or release any requirements of the specifications, or to approve or accept any portion of the Work. e. The Testing Agency shall forward the laboratory report of each test to the Owner, Architect and the Contractor, within three (3) days after the test has been completed or the inspection has been performed. 1.03 WORK TO BE PERFORMED BY CONTRACTOR a. To facilitate testing services the Contractor shall: 1. Secure and deliver to the Testing Agency, without charge, preliminary representative samples of the materials which the Contractor proposes to use and which are required to be tested. 2. Furnish necessary labor to obtain and handle samples at the project, or at the source of the materials to be tested....


Similar Free PDFs