PMGT...
5.5.3.1ACCEPTEDDELIVERABLES Deliverablesthatmeettheacceptancecriteriaareformallysignedoffandapprovedbythecustomer sponsor.Formaldocumentationreceivedfromthecustomerorsponsoracknowledgingformalstakehold acceptanceoftheproject'sdeliverablesisforwardedtotheCloseProjectorPhaseprocess(Section4.7 5.5.3.2WORKPERFORMANCEINFORMATION Workperformanceinformationincludesinformationaboutprojectprogress,suchaswhichdeliverabl have been accepted and which have not been accepted and the reasons why. This information documentedasdescribedinSection10.3.3.1andcommunicatedtostakeholders. 5.5.3.3CHANGEREQUESTS The completed deliverables that have not been formally accepted are documented, along with t reasons for non-acceptance of those deliverables. Those deliverables may require a change request f defect repair. The change requests (described in Section 4.3.3.4) are processed for review a dispositionthroughthePerformIntegratedChangeControlprocess(Section4.6). 5.5.3.4PROJECTDOCUMENTSUPDATES Project documents that may be updated as a result of carrying out this process include but are n limitedto: Lessons learned register. Described in Section 4.4.3.1. The lessons learned register updatedwithinformationonchallengesencounteredandhowtheycouldhavebeenavoided wellasapproachesthatworkedwellforvalidatingdeliverables. Requirementsdocumentation.DescribedinSection5.2.3.1.Therequirementsdocumentatio maybeupdatedwiththeactualresultsofvalidationactivity.Ofparticularinterestiswhent actualresultsarebetterthantherequirementorwherearequirementwaswaived. Requirementstraceabilitymatrix.DescribedinSection5.2.3.2.Therequirementstraceabili matrixisupdatedwiththeresultsofthevalidation,includingthemethodusedandtheoutcome
5.6CONTROLSCOPE Control Scope is the process of monitoring the status of the project and productscope and managi changes to the scope baseline. The key benefit of this process is that the scope baseline is maintain throughouttheproject.Thisprocessisperformedthroughouttheproject.Theinputs,toolsandtechnique andoutputsofthisprocessaredepictedinFigure5-17. Figure5-18depictsthedataflowdiagramoft process....