EXAMPLE LEVEL 1A MCT QUESTIONS & ALIGNMENT TO LCS FRAMEWORK 1A LEVEL DESCRIPTOR (LEAN AWARENESS KNOWLEDGE) A1
Origins and evolution of lean thinking (eg Toyota, Ford, Deming, TWI, etc).
A2
Underpinning and related concepts (eg PDCA, scientific method, continuous improvement, systems thinking, etc)
A3
Key lean principles (eg Womack & Jones, Spear & Bowen etc); value, value stream, flow, pull, perfection
A4
Wastes (identification, categorisation etc); value adding, necessary non-value adding and non-value adding activities; value demand/failure demand
A5
Awareness of the human and strategic dimensions of lean thinking (eg change, engagement, policy deployment, etc)
QUESTION INSTRUCTIONS Each question should have clear instructions (eg ‘select one answer only’, ‘write an answer for each number’, ‘circle the correct answer(s)’, etc) and indicate the number of marks for each question, including any partial marking (if applicable) and time allowance.
EXAMPLE QUESTIONS The right hand column indicates the LCS 1a level descriptor to which the question relates. Once the test has been finalised, the number of question linked to each can be totalled to indicate question spread (see table at end of document). Correct answers are highlighted in yellow. #
Questions
Answer Options
1
Lean thinking’s fifth principle (Womack & Jones) is concerned with which of the following?
a) The quality or condition of being perfect
LCS 1a Alignment A3
b) The endless pursuit for perfection c) The act or process of perfect d) The state of being without a flaw or defect e) The act of making something perfect
2
What are the ‘seven wastes’ of the Toyota Production System? (to be listed)
a) Transport
A4
b) Inventory c) Motion
Page 1 of 8
EXAM PLE LEV EL 1A MCT QUES TIONS & ALIG NME NT TO LCS FRAME WO RK XAMPLE EVEL UESTIONS LIGNME NMENT AMEWO WORK #
Questions
Answer Options
LCS 1a Alignment
d) Waiting
3
3 marks if all correct
e) Overproduction
2 if six correct
f) Over processing
1 if five correct
g) Defects
A value stream shows all activities from order to what?
a) Consumption
A3
b) Production c) Delivery d) Customer service e) Storage
4
What is the correct order of Womack & Jones’ lean principles?
a) Pursue Perfection (5)
A3
b) Create Flow (3) c) Identify the Value Stream (2)
Place a number between 1 – 5 against each principle
5
PDCA is a systematic problem solving process. Match the letter with the action.
d) Specify Customer Value (1) e) Create Pull (4)
a) Measure improvement. (C)
A2
b) Implement as standard.(A) c) Identify root cause. (P)
Place one of the letters P D C A next to each action 6
Necessary Non-Value Adding is a term used to describe an activity that is what?
d) Trial solution. (D)
a) Important in delivering value to customers.
A3, A4
b) Part of the operation’s support function. c) Required by current state but Is difficult to remove today. d) Ready for immediate removal.
7
8
Fill in the missing word for Rule One of Spear & Bowen’s DNA of the Toyota Production System: “All work shall be highly xxxx as to content, sequence, timing and outcome.”
A successful lean implementation should
a) Sorted
A2, A3
b) Specified c) Standardised d) Synchronised
a) Reduce headcount
A2,A3
Page 2 of 8
EXAM PLE LEV EL 1A MCT QUES TIONS & ALIG NME NT TO LCS FRAME WO RK XAMPLE EVEL UESTIONS LIGNME NMENT AMEWO WORK #
Questions
Answer Options
primarily achieve which one of the following?
b) Improve profitability
LCS 1a Alignment
c) Release capacity d) Increase stock value
9
10
Lean is said to be about reducing Muda, Mura and Muri. Which one of the following is not a translation of one of these?
f) Waste
A ‘contingent’ approach to lean thinking implies what?
a) You adopt a prescriptive approach to lean implementation
A3
g) Overburden h) Unevenness i) Overstocking
A2
b) You adapt your implementation approach depending on your particular circumstances c) You do not make details plans but implement in an organic way d) You focus on using the classic tools of the Toyota Production System 11
Womack has an abbreviated definition of lean, which is ‘Lean = purpose + process + what’?
a) Planet
A3
b) Policy c) People d) Practice
12
Policy deployment primarily aims to achieve which of the following?
a) The control of workers actions and performance
A5
b) Ensuring business targets are met c) Alignment of actions with strategic objectives d) To formulate an effective strategy.
13
Complete this quote by Henry Ford: “every process should be regarded as what”.
a) Standardised
A1
b) Innovative c) Experimental d) Experiential
14
According to Spear & Bowen, any improvement must be made in accordance with what, under the guidance of a
a) Scientific management
A3
b) Simplified communications c) Standard operations
Page 3 of 8
EXAM PLE LEV EL 1A MCT QUES TIONS & ALIG NME NT TO LCS FRAME WO RK XAMPLE EVEL UESTIONS LIGNME NMENT AMEWO WORK #
15
Questions
Answer Options
teacher, at the lowest possible level in the organization?
d) Scientific method
What is Takt time?
a) The time it takes to make a standard product
LCS 1a Alignment
A3
b) The rate that components need to be supplied to the production line c) The synchronisation of operations to customer demand d) The time of equipment changeover 16
Policy deployment primarily aims to achieve which of the following?
a) The control of workers actions and performance
A5
b) Ensuring business targets are met c) Alignment of actions with strategic objectives d) To formulate an effective strategy.
17
The Pareto principle is often referred to as what?
a) The 80:20 rule
A2
b) The 95:5 rule c) The law of the vital many d) The principle of factor disparity
18
Complete the quote by W Edwards Deming: “In God we trust. All others must bring xxxx”
a) Solutions
A1
b) Plans c) Data d) Methods
19
In lean thinking terms perfection is which one of the following
a) The endless pursuit to be perfect.
A3
b) The quality or condition of being perfect. c) The act or process of perfect. d) The state of being without a flaw or defect. e) The act of making something perfect.
20
A value stream shows all activities from order to what?
a) Consumption
A3
b) Production c) Delivery d) Customer service e) Storage
21
The opposite of Single Piece Flow is
a) A chaotic system
A3
Page 4 of 8
EXAM PLE LEV EL 1A MCT QUES TIONS & ALIG NME NT TO LCS FRAME WO RK XAMPLE EVEL UESTIONS LIGNME NMENT AMEWO WORK #
Questions
Answer Options
LCS 1a Alignment
b) Multiple piece flow c) Batch and queue production d) Shared services 22
Which is considered the worst of Taiichi Ohno’s seven wastes?
a) Transport
A4
b) Inventory c) Motion d) Waiting e) Overproduction f) Over processing g) Defects
23
From whose perspective should value be identified in a lean organisation?
a) Stakeholders
A3
b) Customers c) Suppliers d) Shareholders
24
Who in a company should own standard processes?
a) Management
A5
b) Engineering c) Front line employees d) Quality control
25
In a service environment, pull should be based on what?
a) TAKT time
A3
b) Kanban c) Real customer demand d) Service delivery capacity
26
To where should the lean practitioner go in order to learn and discover the facts about work?
j) The warehouse
A2
k) The gemba l) The gamba m) The supply chain
27
In Spear & Bowen’s four rules of the Toyota DNA, any improvement must be made in accordance with what?
a) Standardised processes
A2
b) Reference to customer value c) The scientific method d) Company strategy
28
In a lean process, you should only do what the customer will...
a) Want to stock
A3
b) Want to take delivery of c) Want to pay for
Page 5 of 8
EXAM PLE LEV EL 1A MCT QUES TIONS & ALIG NME NT TO LCS FRAME WO RK XAMPLE EVEL UESTIONS LIGNME NMENT AMEWO WORK #
Questions
Answer Options
LCS 1a Alignment
d) Want to consume 29
Emiliani has stated that ‘real lean’ is a combination of continuous improvement plus what?
a) Focus on the customer
A5
b) Respect for people c) Respect for the process d) Effective problem solving
30
The amount of time taken to complete an operation is called what?
a) Cycle time
A3
b) Takt time c) Lead time d) Just in time
31
Which industrialist is said to have inspired the creation of the Toyota Production System?
a) Jack Welch
A1
b) W Edwards Deming c) Henry Ford d) Karl Benz
32
What is the acronym used to remember the classic seven wastes?
a) TOD WOLD
A4
b) TED WARD c) TIM WOOD d) TOM WENT
33
In services, what is the term used to describe the demand that arises due to a previous fault in operations or service?
a) Non added value demand
A3
b) Failure demand c) Customer complaints demand d) System breakdown demand
34
Womack has an abbreviated definition of lean, which is ‘lean = purpose + process + what’?
a) Planet
A3, A5
b) Policy c) People d) Practice e) Patience
35
36
What term describes the techniques developed in World War II to improve aircraft production that are said to form the foundation of lean thinking? Which of these is not one of Bicheno’s ‘new service wastes’?
a) Total Quality Management
A1
b) Training Within Industry c) Toyota Production System d) Industrial Engineering a) Waste of inappropriate systems
A4
b) Waste of lack of concentration c) Waste of untapped human potential
Page 6 of 8
EXAM PLE LEV EL 1A MCT QUES TIONS & ALIG NME NT TO LCS FRAME WO RK XAMPLE EVEL UESTIONS LIGNME NMENT AMEWO WORK #
Questions
Answer Options
LCS 1a Alignment
d) Waste of excessive information & communication 37
Functionalising processes will most likely result in what?
a) Reduced lead times
A4
b) Improved quality c) Batching of work d) Improved efficiencies
38
The biggest impact on improved flow can be achieved through which one of the following?
a) The use of larger batches
A3
b) The reduction in the space used in the process c) A reduction in inventory held d) The use of smaller batches
39
TAKT time is which one of the following?
a) The rate that stock is replenished
A3
b) The time it takes to complete one cycle c) The speed that the customer pulls d) The rate at which an operator works
40
In which book was the word ‘lean’ first used?
a) The Machine that Changed the World
A1
b) Lean Thinking c) Lean Solutions d) The Toyota Way
41
Which two of the following does value stream mapping aim to depict?
a) People flow
A3
b) Material flow c) Information flow d) Stock flow
42
Which one of the following phrases best summarises the approach underpinning standardisation?
a) Keeping organised
A3
b) A place for everything, everything in its place c) One best way d) Control through discipline
43
Which World War Two operations and training system is said to have inspired Toyota?
a) Business Process Reengineering
A1
b) Total Quality Management c) Six Sigma d) Training Within Industry
44
What does PDCA stand for?
a) Plan
A2
b) Do c) Check d) Act
Page 7 of 8
EXAM PLE LEV EL 1A MCT QUES TIONS & ALIG NME NT TO LCS FRAME WO RK XAMPLE EVEL UESTIONS LIGNME NMENT AMEWO WORK
LEARNING OUTCOMES COVERAGE CHECK Number of questions addressing each area A1
6
A2
8
A3
23
A4
6
A5
5
Page 8 of 8...