Importance of Rating and Allowances in Time Study Aggregate Planning Relevant cost PDF

Title Importance of Rating and Allowances in Time Study Aggregate Planning Relevant cost
Course Production & Operations Management
Institution Kalinga Institute of Industrial Technology
Pages 2
File Size 52.7 KB
File Type PDF
Total Downloads 38
Total Views 118

Summary

Importance of Rating and Allowances in Time Study Aggregate Planning Relevant cost...


Description

Importance of Rating & Allowances in Time Study Aggregate Planning: Relevant cost Why time study is important? Time study is used to determine the time required to perform the job. With the help of work study, method of doing a job is decided. The time study is applied to determine the standard time to be taken by an average worker. So with the help of time and motion study workers' wages can be fixed What is the main objective of time study? The main objective of time study is to determine by direct observation, the quantum of human work in a specified task and hence to establish the standard time, within which an average worker working at a normal pace should complete the task using a specified method.

What is Allowance time study? Allowances in time study can be defined as the extra time figures which are to be added to the basic time of an operation to account for personnel desires, delays, fatigue of operators, any special situation and the policies of the firm or organization What is meant by aggregate planning? A plan that includes budgeted levels of finished goods, inventory, production backlogs, and changes in the workforce to support the production strategy. Aggregated information (e.g., product line, family) rather than product information is used, hence the name aggregate plan

What is aggregate planning what is its purpose? Aggregate planning involves developing a general plan for employment, output, and inventory levels. The goal is to develop a plan that makes efficient use of the resources of an organization

What are the costs associated in aggregate planning? What are the eight costs generally considered in aggregate planning ? The eight costs are – Regular time production cost, Overtime production cost, inventory cost, shortage or backorder cost, cost of hiring, cost of layoff, outsourcing cost and underutilization cost. What are the aggregate planning strategies? Aggregate planning is the process of developing, analyzing, and maintaining a preliminary, approximate schedule of the overall operations of an organization. ... In simple terms, aggregate planning is an attempt to balance capacity and demand in such a way that costs are minimized....


Similar Free PDFs