PENGUKURAN VOLUME LUBANG BUKAAN DAN STOCKPILE TAMBANG EMAS (STUDI KASUS : PT. NATARANG MINING) LAPORAN KERJA PRAKTEK Diajukan untuk memenuhi persyaratan kelulusan Mata Kuliah Kerja Praktek Oleh ADAM IRWANSYAH FAUZI 23112002 PROGRAM STUDI TEKNIK GEOMATIKA JURUSAN TEKNOLOGI INFRASTRUKTUR DAN KEWILAYAH...
Accelerat ing t he world's research.
PENGUKURAN VOLUME LUBANG BUKAAN DAN STOCKPILE TAMBANG EMAS Adam Irwansyah Fauzi
Related papers
Download a PDF Pack of t he best relat ed papers
Survey Tambang Bawah Tanah PT Nat arang Mining.pdf Erick Alan ST ELLA PUT RI PRATAMAPemuda Lubis relayout t at a let ak fasilit as di PT Ant am.docx ARio Sadewo
PENGUKURAN VOLUME LUBANG BUKAAN DAN STOCKPILE TAMBANG EMAS (STUDI KASUS : PT. NATARANG MINING)
LAPORAN KERJA PRAKTEK Diajukan untuk memenuhi persyaratan kelulusan Mata Kuliah Kerja Praktek
Oleh
ADAM IRWANSYAH FAUZI 23112002
PROGRAM STUDI TEKNIK GEOMATIKA JURUSAN TEKNOLOGI INFRASTRUKTUR DAN KEWILAYAHAN INSTITUT TEKNOLOGI SUMATERA 2015
ABSTRAK PENGUKURAN VOLUME LUBANG BUKAAN DAN STOCKPILE TAMBANG EMAS
Oleh ADAM IRWANSYAH FAUZI NIM : 23112002
PROGRAM STUDI TEKNIK GEOMATIKA
Dalam dunia pendidikan, keseimbangan antara ilmu teoritis dengan praktek langsung di lapangan sangat dibutuhkan. Upaya untuk melengkapi kebutuhan ilmu yang disertai dengan pengalaman dan praktek dapat dilakukan dalam tahap Sarjana Muda yang tertuang dalam kerja praktek. Tujuan yang hendak dicapai melalui laporan ini ialah mengetahui metode interpolasi polinomial terbaik untuk menghasilkan DTM yang menyerupai bentuk stockpile dilapangan dan metode interpolasi polinomial yang paling sesuai untuk perhitungan volume stockpile . Kegiatan yang dilakukan untuk mencapai tujuan tersebut meliputi akuisisi data, prapengolahan, pembentukan DTM dengan metode TIN dan Gridding, Perhitungan volume permukaan DTM, membandingkan geometri DTM secara visual dan membandingkan hasil perhitungan volume-nya. Dari analisis hasil analisis disimpulkan bahwa pada kasus dimana stockpile terdiri dari banyak tumpukan, metode yang paling baik yaitu yang paling mendekati nilai volume hasil perhitungan ialah metode Kriging. Sedangkan untuk kasus dimana stockpile hanya terdiri dari satu tumpukan, perhitungan menggunakan 5 metode gridding menghasilkan nilai volume yang tidak berbeda signifikan antara satu dan lainnya. Metode yang paling baik pada kasus ini ialah metode Natural Neighbor. Kata Kunci : Stockpile, Volume, Interpolasi i|Pengukuran Volume Lubang Bukaan dan Stockpile tambang emas
KATA PENGANTAR
Puji dan syukur Penulis panjatkan kepada Tuhan yang Maha Esa atas berkat rahmat-Nyalah penulis dapat menyelesaikan Kerja Praktek di PT. Natarang Mining. Kerja Praktek ini merupakann salah satu kegiatan yang dilakukan oleh seluruh mahasiswa Teknik Geomatika Institut Teknologi Sumatera. Laporan Kerja Praktek ini disusun sebagai salah satu syarat untuk kelulusan mata kuliah wajib GD-4091R Kerja Praktek. Laporan Kerja Praktek ini berisi uraian kegiatan yang telah dilakukan selama menjalani kegiatan Kerja Praktek di PT. Natarang Mining dan dikaitkan dengan pengetahuan yang telah diperoleh mahasiswa baik saat kuliah maupun melalui studi literatur. Laporan Kerja Praktek ini diberi judul “Pengukuran Volume Lubang Bukaan dan Stockpile Tambang Emas” Dalam kesempatan ini penulis mengucapkan terima kasih kepada pihak-pihak yang telah membantu penulis selama pelaksanaan Kerja Praktek maupun penyusunan laporan : -
Orang tua penulis yang telah memberi dukungan dan doanya untuk kelancaran Kerja Praktek ini
-
Bapak Arif Rohman selaku Kepala Program Studi Teknik Geomatika
-
Bapak Martono selaku Kepala Teknik Tambang PT. Natarang Mining
-
Bapak Ivan Bakar selaku Wakil Ketua Humas PT. Natarang Mining
-
Bapak Wiyana selaku pembimbing di PT. Natarang Mining
-
Divisi Human Resource Development, Pak Purnomo, Pak Bobi, Bu Esty, dan Bu Ani
-
Divisi Survey, Pak Kardi, Pak Bedjo, Pak Kohandi, Pak Odo, Pak Agung, Pak Syahril, Mang Udin, Mang Usman, Kang Iwan, Mas Eko, Mas Bayu, Mas Arif.
ii | P e n g u k u r a n V o l u m e L u b a n g B u k a a n d a n S t o c k p i l e tambang emas
-
Divisi Geologi, Mang Arpi, Pak Zainuri, Bang Adi, Bang Aprizal, Bang Zainudin, Guntur
-
Divisi K3, Pak Indratmo, Pak Teguh dan Pak Nunu
-
Pak Syahrial yang selalu memberikan arahan kepada penulis selama melaksanakan Kerja Praktek
-
Pak Bobi yang telah memberikan banyak panduan tentang cara bersikap dan berkomunikasi yang baik dengan para karyawan
-
Dokter Elias, Pak Lukman, Pak Marco, Pak Aris, Mas Dimas, Pak Maman, Pak Ponijan, Bu Nana dan Bu Ria
-
Rekan-rekan Aden Services yang memberikan kesempatan penulis untuk ikut serta turnamen playstation dalam rangka HUT RI ke-70
-
Kawan-kawan seperjuangan Kerja Praktek di PT. Natarang Mining, Gilas dan Fajar
-
Teman-teman penulis atas dukungannya, terutama kepada teman-teman Teknik Geomatika angkatan 2012 ITERA
-
Semua pihak yang telah membantu pelaksanaan Kerja Praktek dan penyelesaian laporan Kerja Praktek ini.
Akhir kata penulis sangat berharap laporan ini dapat bermanfaat, baik bagi penulis sendiri, pihak perusahaan maupun semua pihak yang membutuhkannya.
Rajabasa, November 2015 Penulis
iii | P e n g u k u r a n V o l u m e L u b a n g B u k a a n d a n S t o c k p i l e tambang emas
DAFTAR ISI
Abstrak ................................................................................................. i Kata Pengantar.................................................................................... ii Daftar Isi ............................................................................................ iv Daftar Tabel ........................................................................................ vi Daftar Gambar .................................................................................. vii Daftar Lampiran ............................................................................... ix BAB I Pendahuluan ........................................................................... 1 1.1 Latar Belakang Kerja Praktek ............................................. 1 1.2 Kedudukan Peserta .............................................................. 2 1.3 Tujuan Kerja Praktek .......................................................... 2 1.3.1 Untuk Mahasiswa....................................................... 2 1.3.2 Untuk Perusahaan ...................................................... 2 BAB II PT. NATARANG MINING ................................................. 4 2.1 Profil Perusahaan ............................................................... 4 2.2 Struktur Keorganisasian Perusahaan.................................. 6 BAB III TINJAUAN PUSTAKA ..................................................... 7 3.1 Konsep Penentuan Posisi .................................................... 7 3.2 Pengukuran Lubang Bukaan ............................................. 15 3.3 Pengukuran Stock Pile ...................................................... 18 3.4 Digital Terrain Model (DTM) .......................................... 18 iv | P e n g u k u r a n V o l u m e L u b a n g B u k a a n d a n S t o c k p i l e tambang emas
3.4.1 Point-based modeling ............................................... 19 3.4.2 Grid-based modeling................................................. 20 3.4.3 Triangle-based modeling .......................................... 20 3.5 Perhitungan Volume Pada Sistem CAD ............................. 21 3.5.1 Defined Surfaces ........................................................ 21 3.5.2 Horizontal Sections ................................................... 21 BAB IV PELAKSANAAN KEGIATAN .......................................... 23 4.1 Pengukuran dan Perhitungan Volume Lubang Bukaan ...... 23 4.2 Pengukuran dan Perhitungan Volume Stock Pile .............. 28 BAB V ANALISIS ............................................................................. 31 5.1 Metodologi ........................................................................ 31 5.2 Perhitungan Volume Stockpile 5 Metode Gridding .......... 32 BAB VI PENUTUP ............................................................................ 35 6.1 Kesan ................................................................................. 35 6.2 Saran .................................................................................. 36 DAFTAR PUSTAKA ......................................................................... 37 Lampiran............................................................................................... x
v|Pengukuran Volume Lubang Bukaan dan Stockpile tambang emas
DAFTAR TABEL
Tabel 3.1. Tabel Azimuth...................................................................................... 10 Tabel 5.1. Hasil Perhitungan Volume Stockpile dengan 5 Metode Gridding ...... 33
vi | P e n g u k u r a n V o l u m e L u b a n g B u k a a n d a n S t o c k p i l e tambang emas
DAFTAR GAMBAR
Gambar 2.1. Logo PT. Natarang Mining ................................................................ 4 Gambar 2.2. Lokasi penambangan PT. Natarng Mining ........................................ 5 Gambar 2.3. Lokasi wilayah Kontrak Karya PT. Natarang Mining ....................... 5 Gambar 2.4. Struktur organisasi PT. Natarang Mining .......................................... 6 Gambar 3.1. Penentuan posisi metoda polar ........................................................... 8 Gambar 3.2. Ilustrasi penurunan rumus penentuan posisi horizontal ..................... 8 Gambar 3.3. Ilustrasi metoda perpotongan kebelakang (resection) ...................... 11 Gambar 3.4. Penerapan segitiga siku pada penentuan posisi vertikal................... 13 Gambar 3.5. Metoda Trigonometrik ..................................................................... 14 Gambar 3.6. Jenis-jenis lubang bukaan................................................................. 15 Gambar 3.7. Ilustrasi Stock Pile ............................................................................ 18 Gambar 3.8. DTM (Digital Terrain Model).......................................................... 19 Gambar 3.9. Point-based modeling ....................................................................... 19 Gambar 3.10. Grid-based modeling ...................................................................... 20 Gambar 3.11. Triangle-based modeling ............................................................... 20 Gambar 3.12. Ilustrasi prisma segitiga ...................................................................21 Gambar 3.13. Pembagian formasi layer-layer horizontal ..................................... 21 Gambar 4.1. Lubang bukaan (level 4 tambang talang santo) ................................ 23 Gambar 4.2. Pemasangan wall station .................................................................. 23 Gambar 4.3. Data pada Microsoft Excel ............................................................... 24 Gambar 4.4. Langkah import file pada surpac...................................................... 25 Gambar 4.5. Langkah menampilkan file pada surpac........................................... 25 Gambar 4.6. Menggabungkan dengan pengukurann kemajuan sebelumnya ........ 25 Gambar 4.7. Mengubah gradien floor dan grid .................................................... 26 vii | P e n g u k u r a n V o l u m e L u b a n g B u k a a n d a n S t o c k p i l e tambang emas
Gambar 4.8. Langkah pembuatan DTM ............................................................... 26 Gambar 4.9. Langkah melakukan clipping ........................................................... 26 Gambar 4.10. Pembuatan permukaan antar segmen ............................................. 27 Gambar 4.11. Pembuatan DTM bagian dasar ....................................................... 27 Gambar 4.12. Langkah perhitungan volume ......................................................... 27 Gambar 4.13. Pengukuran stock pile di tambang talang santo ..............................28 Gambar 4.14. Langkah import file ........................................................................ 29 Gambar 4.15. Editing data hasil pengukuran pada surpac.................................... 29 Gambar 4.16. DTM stock pile ............................................................................... 29 Gambar 4.17. Langkah perhitungan volume stock pile......................................... 30 Gambar 4.17. Langkah perhitungan volume stock pile......................................... 30 Gambar 5.1. Diagram metodologi proses analisis ............................................... 31 Gambar 5.2. Ilustrasi DTM stockpile yang terdiri dari beberapa tumpuk ........... 32 Gambar 5.3. Ilustrasi DTM stockpile yang terdiri dari satu tumpuk ................... 33
viii | P e n g u k u r a n V o l u m e L u b a n g B u k a a n d a n S t o c k p i l e tambang emas
DAFTAR LAMPIRAN
Lampiran A Daftar Kegiatan Kerja Praktek .................................................... x
ix | P e n g u k u r a n V o l u m e L u b a n g B u k a a n d a n S t o c k p i l e tambang emas
BAB I PENDAHULUAN 1.1 Latar Belakang Kerja Praktek Teknik Geomatika adalah salah satu program studi di ITERA yang memiliki titik berat keilmuan dalam perkembangan teknologi penentuan posisi di permukaan Bumi. Sehingga sebagai bagian dari sistem pendidikan tinggi di Indonesia, Program Studi Teknik Geomatika ITERA memiliki tujuan untuk menghasilkan manajer informasi geospasial yang handal dalam pengelolaan data geospasial sebagai ujung tombak terdepan dalam kegiatan pembangunan di setiap sektor kehidupan. Untuk mewujudkan tujuan tersebut, Program Studi Teknik Geomatika ITERA membekali setiap mahasiswanya dengan teori dan praktek dalam kegiatan perkuliahan yang diberikan selama tahun ajaran yang telah ditentukan. Selama masa perkuliahan yang telah dijalani, sebagian besar ilmu dalam yang didapatkan hanya bersifat teoritis. Sehingga aplikasi dan implementasi ilmuilmu tersebut dinilai perlu untuk mengetahui kondisi permasalahan yang ada secara nyata. Upaya untuk melengkapi kebutuhan ilmu yang disertai dengan pengalaman dan praktek dapat dilakukan dalam tahap Sarjana Muda yang tertuang dalam kerja praktek. Kerja praktek memiliki penekanan dalam hal studi kasus, sehingga mahasiswa dapat belajar mengidentifikasi dan menganalisis permasalahan dari keadaan yang nyata yang dikaitkan dengan ilmu yang diperoleh selama perkuliahan dan studi literatur. Dalam dunia pendidikan, keseimbangan antara ilmu teoritis dengan praktek langsung di lapangan sangat dibutuhkan. Oleh sebab itu, kerja praktek ini diharapkan dapat menjadi tahap awal upaya pemenuhan kebutuhan ilmu dan pengalaman mahasiswa untuk mempersiapkan diri di dunia pekerjaan di bidang Geomatika yang nyata di masa mendatang. 1|Pengukuran Volume Lubang Bukaan dan Stockpile tambang emas
1.2 Kedudukan Peserta Pada kegiatan kerja praktek ini penulis memiliki status sebagai Peserta Kerja Praktek di divisi survey PT. Natarang Mining. Dalam divisi ini Peserta Kerja Praktek diberi kesempatan mengikuti kegiatan yang berhubungan dengan keprofesian Geomatika terutama dalam kegiatan survey dan pemetaan yang dilakukan di PT. Natarang Mining.
1.3 Tujuan Kerja Praktek 1.3.1 Untuk Mahasiswa :
• Memenuhi persyaratan kelulusan mata kuliah wajib GD-4091R Kerja Praktek.
• Mengaplikasikan disiplin ilmu Teknik Geomatika yang selama ini telah didapatkan dalam perkuliahan dan studi literatur.
• Meningkatkan pengetahuan, pemahaman, dan keterampilan yang berkaitan dengan keilmuan Teknik Geomatika.
• Memahami konsep-konsep non akademis di dunia kerja melalui pendidikan kedisiplinan, etika kerja, profesionalitas, dan lain-lain.
• Mendapatkan pengalaman kerja nyata dari dunia kerja dan sekaligus memperluas
wawasan
mahasiswa
tentang
dunia
kerja
yang
sesungguhnya.
• Mengetahui dan menerapkan berbagai kegiatan yang dilaksanakan oleh divisi survey PT. Natarang Mining.
1.3.2 Untuk Perusahaan :
• Mendapatkan bantuan tenaga kerja dari mahasiswa yang melaksanakan kerja praktek.
2|Pengukuran Volume Lubang Bukaan dan Stockpile tambang emas
• Memperoleh masukan dari mahasiswa peserta kerja praktek yang dapat berguna dalam pemecahan masalah yang dihadapi oleh PT. Natarang Mining sesuai bidang keilmuan Teknik Geomatika.
• Memperoleh sarana dalam hal penilaian kualitas mahasiswa yang pada akhirnya berhubungan dengan penerimaan tenaga kerja baru yang baru lulus (fresh graduate).
• Mendapatkan kesempatan untuk berkontribusi dalam pelaksanaan pengembangan dan peningkatan sumber daya manusia.
3|Pengukuran Volume Lubang Bukaan dan Stockpile tambang emas
BAB II PT. NATARANG MINING 2.1 Profil Perusahaan Nama Perusahaan Presiden Direktur Jenis Badan Hukum Alamat Perusahaan
: : : :
Nomor Telepon Nomor Faximile Status Permodalan Bidang Usaha Pengikutnya
: : : :
PT. NATARANG MINING Yohanes Parapat Perseroan Terbatas PMA Jalan Ciputat Raya No. 16 Pondok Pinang Kebayoran Lama, Jakarta 12310 (021) 7510125 (021) 7692783 85,00% PMA, 15,00%PMDN Penambangan Bijih Emas dan Mineral
PT. Natarang Mining merupakan perusahaan badan hukum Indonesia yang didirikan di Indonesia dengan Akte Notaris Nomor. 51 tanggal 17 November 1986 dan disahkan oleh Surat Keputusan Kementerian Kehakiman Nomor C2.8284. HT. 01.01. TH’86 tanggal 29 November 1986. PT Natarang Mining merupakan perusahaan Joint Venture dengan kepemilikan saham Natarang Offshore PTY LTD sebanyak 85% dan PMDN 15%.
Gambar 2.1 Logo PT. Natarang Mining
Izin Kontrak Karya
:
Generasi Kode Wilayah Operasi Produksi
: : :
Luas Wilayah Kontrak Karya:
B – 43/Pres/11/1986, tanggal 6 November 1986 IV 97PK0280 2004 – 2034 SK No. 005.K/40.00/DJG/2005, tanggal 14 Januari 2005, berlaku surut tanggal 1 September 2004 10.540 Ha
4|Pengukuran Volume Lubang Bukaan dan Stockpile tambang emas
Lokasi Kontrak karya
:
Metode Penambangan Produk Tenaga Kerja
: : :
Way Linggo, Kecamatan Wonosobo, Kabupaten Tanggamus, Provinsi Lampung Tambang Dalam Emas, Perak dan mineral pengikutnya 698 Karyawan
Gambar 2.2 Lokasi Penambangan PT. Natarang Mining (Source : Google Maps)
5|Pengukuran Volume Lubang Bukaan dan Stockpile tambang emas
Gambar 2.3 Lokasi wilayah Kontrak Karya PT. Natarang Mining
6|Pengukuran Volume Lubang Bukaan dan Stockpile tambang emas
2.2 Struktur Keorganisasian Perusahaan
PT. NATARANG MINING
Yohannes Parapat Presiden Direktur
STRUKTUR ORGANISASI
Martono Site Manager/ Kepala Teknik Tambang
Ivan Kusnadi Finance Accounting Manager
Nana Ria Hadisya Site Executive Secretary
Lilik Herawati Site Chief Accountant Maulana Adhi Tax Superintendent
Jerry Baguio Mine and Exploration Manager
Ashley McAleese Operations Manager
Lusienny Kumala Purchasing and Logistic Superintendent
Sugiharto Processing Manager
Heri Purnomo S. Senior Warehouse Supervisor
Sofyan L. Processing Superintendent
Saiful Arief Senior Purchasing Supervisor
Fabian Michie Maintenance Superintendent
Wahyu Fadlin Environmental Superintendent Abjan Masuara OHS Superintendent
Purnomo SIdhi HR Superintendent
Nur Zamsari Community Development Superintendent
Hadi Suharyono Asst. Mine & Exploration Manager
Soeharto...