1 / 1 point

Question 1

Subway’s sandwich process is best described as: custom or make-to-order. option or assemble-to-order. standard or make-to-stock. a value (supply) chain. 1/1 point

Question 2

An accounting firm specializing in standard EZ tax returns filed online with a similar sequence of steps is best described as what type of process? Project Job shop Flow shop Continuous flow 1/1 point

Question 3

A women’s beauty salon specializing in hair coloring is best described as a: project. job shop. flow shop. continuous flow.

1/1 point

Question 4

All of the following are the phases of a product's life cycle EXCEPT: introduction. inception. maturity. decline. 1/1 point

Question 5

Which of the following statement is TRUE about a process map (flowchart)? It does not have boundaries. It does not include information flow. It is often used as a baseline to describe how a process is performed. It must include a line of customer visibility. 1/1 point

Question 6

The lowest resource utilization is usually found in a(n) _____ process. job shop flow shop continuous flow assembly line

1/1 point

Question 7

A manufacturing firm produces a few standardized products in high volumes in a fixed processing sequence that operates 24 hours a day and 7 days a week. The forecast of volume is reasonably accurate. The firm is most likely to use the _____ process. project job shop flow shop continuous flow 1/1 point

Question 8

The average number of hotel rooms occupied per day during the month of March is 225. Rooms are booked on average for 2.5 days. On average, how many new bookings occur each day? Less than 100 rooms per day More than100 but less than or equal to 150 rooms per day More than 150 but less than or equal to 200 rooms per day More than 200 but less than or equal to 250 rooms per day View Feedback

Question 9

1 / 1 point

The average number of entities completed per unit time—the output rate—from a process is called _____.

utilization throughput service rate work-in-process Question 10

1/1 point

The work activity that effectively limits throughput of a process is known as a _____. process boundary service blueprint bottleneck process map...