QUANTITITES AND ESTIMATION PROJECT CONTENT...
SECTION C : DAYWORK SCHEDULE Items
Description
1.0
Schedule 1 – Labour
1.1 1.2 1.3 1.4 1.5 1.6 1.7 1.8 1.9 1.10 1.11 1.12 1.13 1.14 1.15 1.16 1.17 1.18
Labourer Banksman / Greaser Carpenter Mason / concrete finisher Driver : heavy duty Driver : light duty Pipe filter Plant operator : heavy Plant operator : light Steel fixer / Bar bender Welder Jointer Painter Electrician Mechanical filter Instrumention filter Plumber Chainman
Unit
h h h h h h h h h h h h h h h h h h h
2.0 2.1 2.2 2.3 2.4 2.5 2.6 2.7 2.8 2.9 2.10 2.11 2.12 2.13 2.14 2.15 2.16 2.17 2.18 2.19
Schedule 2 – Materials Concrete U PVC Pipe RCP Pipe Hradwood Softwood , Treated Bitumen Fresh water Sub-base material Aggregates-Base Coarse Material Portland Cement Coarse Aggregates (dry) Fine Aggregates (dry) Asphalt Concrete Base Coarse Material Bituminous Alsphatic Concrete Wearing Course Bituminous Alsphatic Concrete Base
m3 m m m3 m3 t gals m3 m3 m3 m3 m3 m3 m3 m3 m3 m3
Quantit y
Rate
Amount
Course Precast Concrete Kerbs Cast-in-situ Concrete Kerbs 3.0 3.1 3.2 3.3 3.4 3.5 3.6 3.7 3.8 3.9 3.10 3.11 3.12 3.13 3.14 3.15 3.16 3.17
Schedule 3 - Plant & Materials Bulldozer Grader Motor Scraper Vibratory Roller Dump truck Generator up to 200Kva Compressor 5000-6000 litres capacity Excavator Water tanker (minimum 10 L) Concrete vibrator (poker/screed) up to dia 50mm Welding Plant Sand Blasting Unit (with operator) Bob cat,capacity < 1m3 for lift capacity...