Title | V1.00 Perencanaan Bentang Jembatan PC I Girder |
---|---|
Author | Indra Raj Suweda |
Pages | 38 |
File Size | 4.6 MB |
File Type | |
Total Downloads | 459 |
Total Views | 704 |
Versi 1.0 Page 1 Release Date : Juli 2021 REPORT OUTPUT EXCEL SPREADSHEET • Nama Program Perencanaan Bentang Jembatan Pre Cast I Girder • Versi 1.00 • Penyusun Indra K Raj Suweda • email [email protected] A. DATA PERENCANAAN A.1. DATA DIMENSI JEMBATAN Tebal slab lantai jembatan, hs = 0,25 m ...
Accelerat ing t he world's research.
V1.00 Perencanaan Bentang Jembatan PC I Girder Indra Raj Suweda
Related papers
Download a PDF Pack of t he best relat ed papers
Bent ang 24 Met er Berdasarkan St andar Nasional Indonesia (SNI YUDHIST IRO PURWO CHRISMANT O PERHIT UNGAN BALOK PRAT EGANG (PCI -GIRDER) DATA JEMBATAN SPESIFIC GRAVIT Y Hidayat Lismana 231214153-Perhit ungan-Jembat an-Girder-Bms-Code Alex Niago
Versi 1.0
Page 1
Release Date : Juli 2021
REPORT OUTPUT EXCEL SPREADSHEET
A.
• Nama Program
Perencanaan Bentang Jembatan Pre Cast I Girder
• Versi
1.00
• Penyusun
Indra K Raj Suweda
• email
[email protected]
DATA PERENCANAAN
A.1. DATA DIMENSI JEMBATAN
Tebal slab lantai jembatan,
hs =
0,25
m
Tebal selimut untuk slab lantai jembatan,
ts =
40,00
mm
Tebal lapisan aspal + overlay,
ta =
0,10
m
Tebal genangan air hujan,
th =
0,05
m
Jarak antara balok PC I Girder,
s=
1,800
m
Lebar jalur lalu-lintas,
b1 =
7,50
m
Lebar trotoar,
b2 =
1,45
m
Lebar median (pemisah jalur),
b3 =
0,00
m
n=
7
wd =
0,20
m
Panjang bentang jembatan,
L=
40,00
m
Elevasi lapisan aspal dari permukaan tanah terdalam,
Z=
19
m
fc' =
50,00
MPa
α=
1,1,E-05
/oC
fc' =
29,00
MPa
α=
1,1,E-05
/oC
Jumlah diapragma, Tebal diapragma,
A.2. DATA BAHAN STRUKTUR BETON Data Bahan Struktur Precast Kuat tekan beton, Koefisien muai panjang untuk beton, Data Bahan Struktur Slab Lantai Mutu beton pakai, Koefisien muai panjang untuk beton,
Dapatkan program bantu spreadsheet ini hanya di https://www.inpetra.id/
Versi 1.0
Page 2
Release Date : Juli 2021
A.3. DATA BAHAN & DIMENSI TULANGAN BAJA Diameter tulangan pakai utama,
D=
13
mm
Diameter tulangan sengkang,
D=
13
mm
Tegangan leleh baja tulangan sirip (deform),
fy =
400
MPa
Tegangan leleh baja tulangan polos,
fy =
240
MPa
A.4. DATA SPECIFIC GRAVITY 3
Berat jenis material beton PC I Girder,
Wc =
24,00
kN/m
Berat jenis material beton bertulang,
Wc =
24,00
kN/m3
Berat jenis material beton tidak bertulang,
W'c =
21,58
kN/m3
Berat jenis material aspal,
Wa =
22,00
kN/m3
Berat jenis material air,
Ww =
9,80
kN/m
Berat jenis material baja,
Ws =
78,50
kN/m3
3
A.5. BAJA PRATEGANG DATA STRANDS CABLE - STANDAR VSL Jenis strands
: Uncoated 7 wire super strands ASTM A-416 grade 270
Tegangan leleh strand,
fpy =
1580
MPa
Kuat tarik strand,
fpu =
1860
MPa
12,7
mm mm2
Diameter nominal strands, Luas tampang nominal satu strands,
Ast =
98,7
Beban putus minimal satu strands,
Pbs =
183,582
kN
Es =
193000
MPa
Modulus elastis strands, Komponen struktur prategang,
Dengan Lekatan (Bounded)
A.6. DATA BALOK PC I GIRDER
Tipe balok prestress,
PC I H-210
Jumlah tendon pakai,
n=
4
Jarak titik berat tendon terhadap alas balok,
z0 =
0,2
m
Jarak dari alas balok ke as tendon ke-1 (tengah),
a=
0,15
m
Jarak dari alas balok ke as tendon ke-1 (tepi),
a' =
0,35
m
Dapatkan program bantu spreadsheet ini hanya di https://www.inpetra.id/
tendon
Versi 1.0
Page 3
Release Date : Juli 2021
A.7. DATA MOMEN HASIL PROGRAM BANTU Momen akibat kombinasi Ekstrim,
MEQ = 6956,158
kN.m
Momen akibat kombinasi Layan 1,
Mlayan 1 = 6795,574
kN.m
Momen akibat kombinasi Layan 3,
Mlayan 3 = 6336,782
kN.m
MU = 10242,530
kN.m
Momen envelope kombinasi Kuat & Ekstrim (PB),
A.8. DATA KONDISI PEMBEBANAN ANGIN PADA LOKASI JEMBATAN Vo =
19,3
km/jam
V10 =
126
km/jam
VB =
90
km/jam
Panjang gesekan di hulu jembatan,
Zo =
2500
Nilai tekanan angin dasar,
PB =
0,0024
Kecepatan angin gesekan, Kecepatan angin pada elevasi 10,00 meter dari permukaan tanah, Kecepatan angin pada elevasi 1,00 meter dari permukaan jembatan,
A.9. JUMLAH STRAND PAKAI PER TENDON Tendon ke
Unit Tendon
Maksimum Strands
Stressing
Dead End
Diameter Selubung (mm)
Lebar Angkur
1
5-12
11
12
215
300
72
2
5-19
19
19
265
375
87
3
5-19
19
19
265
375
87
4
5-19
19
19
265
375
87
Total Strands
B.
Jumlah Strands
68
HASIL PERHITUNGAN PROGRAM BANTU SPREADSHEET
B.1. DIMENSI PENAMPANG PC I GIRDER Kode
Lebar
Kode
(m)
Tebal (m)
b1
0,640
h1
0,070
b2
0,800
h2
0,130
b3
0,300
h3
0,120
b4
0,200
h4
1,650
b5
0,250
h5
0,250
b6
0,700
h6
0,250
h
2,100
Dapatkan program bantu spreadsheet ini hanya di https://www.inpetra.id/
mm N/mm2
Versi 1.0
Page 4
Release Date : Juli 2021
B.2. GAYA PRATEGANG AKIBAT JACKING PADA MASING-MASING TENDON No
ns
Cable
(Strand)
0
0
79,35%
0,00
0
0
79,35%
0,00
0
0
79,35%
0,00
0
0
79,35%
0,00
po
Pj (kN)
B.3. POSISI MASING - MASING TENDON PADA GIRDER Jarak X
Posisi masing-masing cable
Trace Zo
Z1
Z2
Z3
Z4
(m)
(m)
(m)
(m)
(m)
(m)
0,000
1,012
1,880
1,370
0,860
0,350
1,000
0,933
1,742
1,251
0,791
0,331
2,000
0,858
1,610
1,138
0,725
0,312
3,000
0,787
1,486
1,031
0,663
0,295
4,000
0,720
1,369
0,931
0,604
0,278
5,000
0,657
1,259
0,836
0,549
0,263
6,000
0,598
1,156
0,748
0,498
0,248
7,000
0,543
1,060
0,665
0,450
0,235
8,000
0,492
0,971
0,589
0,406
0,222
9,000
0,446
0,890
0,519
0,365
0,211
10,000
0,403
0,815
0,455
0,328
0,200
11,000
0,364
0,748
0,397
0,294
0,191
12,000
0,330
0,687
0,345
0,264
0,182
13,000
0,299
0,634
0,299
0,237
0,175
14,000
0,273
0,588
0,260
0,214
0,168
15,000
0,251
0,549
0,226
0,194
0,163
16,000
0,232
0,517
0,199
0,178
0,158
17,000
0,218
0,492
0,177
0,166
0,155
18,000
0,208
0,474
0,162
0,157
0,152
19,000
0,202
0,464
0,153
0,152
0,151
20,000
0,200
0,460
0,150
0,150
0,150
Dapatkan program bantu spreadsheet ini hanya di https://www.inpetra.id/
Versi 1.0
Page 5
Release Date : Juli 2021
Trace Masing-masing Cable 2,000 1,800 1,600 1,400
Tendon 1
1,200
Tendon 2
1,000
Tendon 3
0,800
Tendon 4
0,600
etop
0,400
ebtm
0,200
Lintasan Inti Tendon
0,000 0
1
2
3
4
5
6
7
8
9 10 11 12 13 14 15 16 17 18 19 20
Panjang Bentang PC I Girder
B.3. KEHILANGAN GAYA PRATEGANG Nilai gaya prategang, Saat jacking (jacking force),
Pj =
9905,54
(100,00%)
kN
Setelah gesekan angkur,
Po =
9608,37
( 97,00%)
kN
Setelah gesekan kable,
Px =
9416,81
( 95,07%)
kN
Setelah pengangkuran,
Pi =
8901,77
( 89,87%)
kN
Peff =
7579,41
( 76,52%)
kN
Setelah kehilangan gaya jangka panjang, Tegangan ijin tendon baja pasca tarik, Tegangan yang terjadi pada tendon baja pasca tarik, Syarat :
12000,000
Nilai Gaya Prategang (kN)
10000,000 8000,000
fpe
<
0,70 * fpu
1129,30
<
1302,00
0,70 * fpu = 1302,000
Mpa
fpe = Peff / At = 1129,300
MPa
→
[OK]
GRAFIK KEHILANGAN GAYA PRATEGANG 9905,540 9608,374 9416,813
Gaya prategang saat jacking (jacking force),
8901,766 7579,413
Gaya prategang setelah kehilangan gaya akibat gesekan angkur,
6000,000
Gaya prategang setelah kehilangan gaya akibat gesekan kable,
4000,000
Gaya prategang setelah kehilangan gaya akibat pengangkuran,
2000,000
Gaya prategang setelah kehilangan gaya jangka panjang,
0,000
Dapatkan program bantu spreadsheet ini hanya di https://www.inpetra.id/
Versi 1.0
Page 6
Release Date : Juli 2021
B.4. TEGANGAN PADA PENAMPANG PC I GIRDER a.
TEGANGAN PADA SAAT KONSTRUKSI Kondisi
Pada Saat Transfer (MPa)
Posisi
Tump.
Syarat
Ket.
ya =
1,088
m
-14,02
-24,00
[ OK ]
yb =
1,012
m
-12,37
-24,00
[ OK ]
tgh, bentang
Syarat
Ket.
Posisi ya =
1,088
m
-1,52
-24,00
[ OK ]
yb =
1,012
m
-24,00
-24,00
[ OK ]
Kondisi
Setelah kehilangan gaya prategang (MPa)
Posisi
Tump.
Syarat
Ket.
ya =
1,088
m
-10,73
-22,50
[ OK ]
yb =
1,012
m
-9,47
-22,50
[ OK ]
tgh, bentang
Syarat
Ket.
Posisi ya =
1,088
m
-3,39
-22,50
[ OK ]
yb =
1,012
m
-16,29
-22,50
[ OK ]
Kondisi
Plat lantai selesai dicor (MPa)
Posisi
Tump.
Syarat
Ket.
ya =
1,088
m
-10,73
-22,50
[ OK ]
yb =
1,012
m
-9,47
-22,50
[ OK ]
tgh, bentang
Syarat
Ket.
Posisi ya =
1,088
m
-10,19
-22,50
[ OK ]
yb =
1,012
m
-9,97
-22,50
[ OK ]
Kondisi
Balok menjadi komposit (MPa)
Posisi
Tump.
Syarat
Ket.
ya =
0,977
m
-3,16
-22,50
[ OK ]
ya' =
0,727
m
-4,17
-22,50
[ OK ]
yb =
1,373
m
-12,58
-22,50
[ OK ]
tgh, bentang
Syarat
Ket.
Posisi ya =
0,977
m
-3,55
-22,50
[ OK ]
ya' =
0,727
m
-4,45
-22,50
[ OK ]
yb =
1,373
m
-12,04
-22,50
[ OK ]
Dapatkan program bantu spreadsheet ini hanya di https://www.inpetra.id/
Versi 1.0
b.
Page 7
Release Date : Juli 2021
TEGANGAN PADA SAAT OPERASIONAL Kondisi
Tegangan akibat Kombinasi Ekstrim Maksimum
Posisi
Gaya Prategang
Kombinasi Beban
Jumlah
Syarat
Ket.
ya =
0,977
m
4,58
-9,12
-4,54
-22,50
[ OK ]
ya' =
0,727
m
1,60
-6,79
-5,19
-22,50
[ OK ]
yb =
1,373
m
-23,46
12,82
-10,64
-22,50
[ OK ]
Kondisi
Tegangan akibat Kombinasi Layan 1
Posisi
Gaya Prategang
Kombinasi Beban
Jumlah
Syarat
Ket.
ya =
0,977
m
4,58
-8,91
-4,33
-22,50
[ OK ]
ya' =
0,727
m
1,60
-6,63
-5,03
-22,50
[ OK ]
yb =
1,373
m
-23,46
12,52
-10,94
-22,50
[ OK ]
Kondisi
Tegangan akibat Kombinasi Layan 3
Posisi
Gaya Prategang
Kombinasi Beban
Jumlah
Syarat
Ket.
ya =
0,977
m
4,58
-8,31
-3,73
-22,50
[ OK ]
ya' =
0,727
m
1,60
-6,19
-4,59
-22,50
[ OK ]
yb =
1,373
m
-23,46
11,68
-11,78
-22,50
[ OK ]
B.5. KONTROL LENDUTAN DAN KAPASITAS MOMEN δlayan-1 =
Lendutan berdasarkan kombinasi layan 1, Syarat,
δ
<
L/300
43,378
<
133,333
Lendutan berdasarkan program bantu kombinasi layan 1, Syarat,
δ
<
L/300
45,745
<
133,333
Syarat,
→
[ OK ]
δlayan-1 =
45,745
→
[ OK ]
δlajur= δTD/TT + δTB =
Lendutan berdasarkan beban lajur, δ
<
L/800
27,40
<
50,00
Kapasitas momen ultimit balok prestress
→
Mu
<
ɸ * Mn
11203,376
<
20916,981
Dapatkan program bantu spreadsheet ini hanya di https://www.inpetra.id/
27,396
mm
mm
mm
[ OK ]
ɸ * Mn = 20916,98
kN.m
Mu = 11203,38
kN.m
Momen ultimit berdasarkan kombinasi Kuat & Ekstrim, Syarat :
43,378
→
[ OK ]
Versi 1.0
C.
Page 8
Release Date : Juli 2021
ANALISA PEMBEBANAN PADA GIRDER
C.1. BEBAN MATI KOMPONEN STRUKTURAL JEMBATAN (MS) a.
BEBAN MATI AKIBAT PC I GIRDER JEMBATAN Panjang bentang jembatan,
L=
40,00
m
Luas penampang balok prategang,
A=
0,752
m2
Wc =
24,00
kN/m3
QMS = A * Wc =
Berat jenis material beton PC I Girder, Beban mati akibat PC I Girder, Momen akibat slab lantai jembatan, b.
18,06
kN/m
2