ANALISA HARGA SATUAN FORMULIR STANDAR UNTUK PEREKAMAN ANALISA MASING-MASING HARGA SATUAN PROYEK : No. PAKET KONTRAK : ……………………………………………… NAMA PAKET : ………………………………………………………………….. …………………………………………………………………. PROP / KAB / KODYA : ……………………………………………… ITEM PEMBAYARAN NO. : 4.2 (2d) PERKIRAAN VOL. PEK. : 0,...


Description

ANALISA HARGA SATUAN FORMULIR STANDAR UNTUK PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

PROYEK No. PAKET KONTRAK NAMA PAKET PROP / KAB / KODYA ITEM PEMBAYARAN NO. JENIS PEKERJAAN SATUAN PEMBAYARAN

NO.

: : ……………………………………………… : ………………………………………………………………….. …………………………………………………………………. : ……………………………………………… : 4.2 (2d) PERKIRAAN VOL. PEK. : : Lapis Pondasi Bawah ( LPB ) Telford TOTAL HARGA (Rp.) : : M3 % THD. BIAYA PROYEK :

KOMPONEN

A.

TENAGA

1. 2.

Pekerja Mandor

SATUAN

jam jam

PERKIRAAN KUANTITAS

HARGA SATUAN (Rp.)

0,00 0,00 0,00

JUMLAH HARGA (Rp.)

7,0000 0,2500

JUMLAH HARGA TENAGA B.

BAHAN

1 2

Batu pecah 10/15 + cocok Pasir urug

M3 M3

0,9375 0,2750

JUMLAH HARGA BAHAN C.

PERALATAN

1 2 3

Three Wheel Roller Water Tanker Alat Bantu

D. E. F. Note: 1 2 3 4

jam jam Ls

0,0667 0,0167 1,0000

JUMLAH HARGA PERALATAN JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C ) OVERHEAD & PROFIT 10,00 % x D HARGA SATUAN PEKERJAAN ( D + E ) SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran berat untuk bahan-bahan. Kuantitas satuan adalah kuantitas setiap komponen untuk menyelesaikan satu satuan pekerjaan dari nomor mata pembayaran. Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator. Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN yang dibayar dari kontrak) dan biaya-biaya lainnya.

Analisa Tambahan BMCK

ANALISA HARGA SATUAN FORMULIR STANDAR UNTUK PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

PROYEK No. PAKET KONTRAK NAMA PAKET PROP / KAB / KODYA ITEM PEMBAYARAN NO. JENIS PEKERJAAN SATUAN PEMBAYARAN

NO.

: : ……………………………………………… : ………………………………………………………………….. …………………………………………………………………. : ……………………………………………… : 4.2 (2c) PERKIRAAN VOL. PEK. : : Lapis Pondasi Bawah ( LPB ) Sirtu TOTAL HARGA (Rp.) : : M3 % THD. BIAYA PROYEK :

KOMPONEN

A.

TENAGA

1 2

Pekerja Mandor

SATUAN

jam jam

PERKIRAAN KUANTITAS

BAHAN

1 2

Sirtu Pasir urug

M3 M3

JUMLAH HARGA (Rp.)

0,3556 0,0444

JUMLAH HARGA TENAGA B.

HARGA SATUAN (Rp.)

0,00 0,00 0,00

3.711,11

1,0000 0,2200

JUMLAH HARGA BAHAN C.

PERALATAN

1 2 3 4

Motor Grader Three Wheel Roller Water Tanker Alat Bantu

D. E. F. Note: 1 2 3 4

jam jam jam Ls

0,0444 0,0667 0,0667 1,0000

JUMLAH HARGA PERALATAN JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C ) OVERHEAD & PROFIT MAX. 10,00 % x D HARGA SATUAN PEKERJAAN ( D + E ) SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran berat untuk bahan-bahan. Kuantitas satuan adalah kuantitas setiap komponen untuk menyelesaikan satu satuan pekerjaan dari nomor mata pembayaran. Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator. Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN yang dibayar dari kontrak) dan biaya-biaya lainnya.

Analisa Tambahan BMCK

Analisa EI-531 FORMULIR STANDAR UNTUK PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

PROYEK NAMA PAKET PROP / KAB / KODYA ITEM PEMBAYARAN NO. JENIS PEKERJAAN SATUAN PEMBAYARAN

NO.

: ……………………………………………… : ………………………………………………………………….. : ……………………………………………… : 4.2.(14) PERKIRAAN VOL. PEK. : : Perkerasan Beton Semen fs 45 TOTAL HARGA (Rp.) : : M3 % THD. BIAYA PROYEK :

KOMPONEN

A. 1. 2. 3.

TENAGA Pekerja Tukang Mandor

B. 1. 2 3 4 5 6 7 8 9 10 11 12 13

BAHAN Semen Pasir Agregat Kasar Baja Tulangan Polos Joint Sealent Cat Anti Karat Expansion Cap Polytene 125 mikron Curing Compound Multiplex 12 mm Kayu Acuan

Paku Additive

C. 1 2 3 4 5 6 7 8

PERALATAN Wheel Loader Batching Plant Truck Mixer Con. Vibrator Water Tank Truck Conc. Paver Alat Bantu

D. E. F. G. Note: 1 2

3 4

(L01) (L02) (L03)

(M12) (M01a) (M03) (M39a) (M94) (M95) (M96) (M97) (M98) (M73) (M99) (M18) (M67a)

E15 E43 E49 E20 E23 E42

SATUAN

jam jam jam

Kg M3 M3 Kg Kg Kg M2 Kg Ltr Lbr M3 Kg Ltr

jam jam jam jam jam jam Ls

PERKIRAAN KUANTITAS

HARGA SATUAN (Rp.)

-

JUMLAH HARGA (Rp.)

1,4056 0,7028 0,1506 JUMLAH HARGA TENAGA

23.805,04

469,6800 0,5097 0,7440 15,8750 0,9900 0,0200 0,1700 0,4375 0,8700 0,1600 0,0960 1,0240 0,9139 JUMLAH HARGA BAHAN

1.387.510,08

0,0244 0,0502 0,2437 0,0502 0,0422 0,0074 1,0000

JUMLAH HARGA PERALATAN JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C ) OVERHEAD & PROFIT 10,0 % x D HARGA SATUAN PEKERJAAN ( D + E ) HARGA SATUAN PEKERJAAN / M3 SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran berat untuk bahan-bahan. Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk menyelesaikan satu satuan pekerjaan dari nomor mata pembayaran. Harga Satuan yang disampaikan Penyedia Jasa tidak dapat diubah kecuali terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan dalam Instruksi Kepada Peserta Lelang Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator. Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN yang dibayar dari kontrak) dan biaya-biaya lainnya.

Analisa EI-531

Analisa Tambahan BMCK

FORMULIR STANDAR UNTUK PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

PROYEK NAMA PAKET PROP / KAB / KODYA ITEM PEMBAYARAN NO. JENIS PEKERJAAN SATUAN PEMBAYARAN

NO.

: ……………………………………………… : ………………………………………………………………….. : ……………………………………………… : 4.2.(14a) PERKIRAAN VOL. PEK. : : Perkerasan Beton Semen K-350 TOTAL HARGA (Rp.) : : M3 % THD. BIAYA PROYEK :

KOMPONEN

A. 1. 2. 3.

TENAGA Pekerja Tukang Mandor

(L01) (L02) (L03)

SATUAN

jam jam jam

PERKIRAAN KUANTITAS

HARGA SATUAN (Rp.)

BAHAN Semen Pasir Agregat Kasar Baja Tulangan Joint Sealent Cat Anti Karat Expansion Cap Polytene 125 mikron Curing Compound Multiplex 12 mm Kayu Acuan

Paku Additive

C. 1 2 3 4 5 6 7 8

PERALATAN Wheel Loader Batching Plant Truck Mixer Con. Vibrator Water Tank Truck Conc. Paver Alat Bantu

D. E. F. G. Note: 1 2

3 4

(M12) (M01a) (M03) (M39a) (M94) (M95) (M96) (M97) (M98) (M73) (M99) (M18) (M67a)

Kg M3 M3 Kg Kg Kg M2 Kg Ltr Lbr M3 Kg Ltr

E15 E43 E49 E20 E23 E42

jam jam jam jam jam jam Ls

JUMLAH HARGA (Rp.)

1,4056 0,7028 0,1506 JUMLAH HARGA TENAGA

B. 1. 2 3 4 5 6 7 8 9 10 11 12 13

-

448,0000 0,5097 0,6959 15,8750 0,9900 0,0200 0,1700 0,4375 0,8700 0,1600 0,0960 1,0240 0,0000 25.000,00 JUMLAH HARGA BAHAN

23.805,04

0,00 1.324.013,88

0,0244 0,0502 0,2437 0,0502 0,0422 0,0074 1,0000

JUMLAH HARGA PERALATAN 156.360,01 JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C ) 1.504.178,93 OVERHEAD & PROFIT 10,0 % x D 150.417,89 HARGA SATUAN PEKERJAAN ( D + E ) 1.654.596,82 HARGA SATUAN PEKERJAAN / M3 1.654.596,82 SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran berat untuk bahan-bahan. Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk menyelesaikan satu satuan pekerjaan dari nomor mata pembayaran. Harga Satuan yang disampaikan Penyedia Jasa tidak dapat diubah kecuali terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan dalam Instruksi Kepada Peserta Lelang Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator. Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN yang dibayar dari kontrak) dan biaya-biaya lainnya.