KOEFISIE HARGA SATUAN URAIAN JUMLAH N SATUAN 1.25 Btg Kayu Dolken diameter 8 - 10 / 400 cm 45,700.00 57,125.00 2.5 Kg Portland Semen 11,312.50 28,281.25 1.2 Lbr Seng Gelombang 3" - 5" 64,850.00 77,820.00 0.005 m3 Pasir Pasang 135,000.00 675 0.009 m3 Koral Beton 271,250.00 2,441.25 0.072 m3...
SATUAN URAIAN JUMLAH 1.25 Btg Kayu Dolken diameter 8 - 10 / 400 cm 45,700.00 57,125.00 2.5 Kg Portland Semen 11,312.50 28,281.25 1.2 Lbr Seng Gelombang 3" - 5" 64,850.00 77,820.00 0.005 m3 Pasir Pasang 135,000.00 675 0.009 m3 Koral Beton 271,250.00 2,441.25 0.072 m3 Kayu 5/7X4m Kayu Meranti 3,447,500.00 248,220.00 0.06 Kg Paku Biasa 2" - 5" 26,750.00 1,605.00 0.45 Kg Meni Besi 26,100.00 11,745.00 0.2 OH Tukang Kayu 52,500.00 10,500.00 0.4 OH Pekerja 40,000.00 16,000.00 0.02 OH Kepala Tukang 55,000.00 1,100.00 0.02 OH Mandor 50,000.00 1,000.00 456,512.50 KOEFISIE N HARGA SATUAN...