ANALISIS HARGA SATUAN PEKERJAAN Perbaikan Atap dan JendelaBalai Struktur dan Konstruksi Bangunan TAHUN ANGGARAN : 2013 Bongkaran Plafond, 1 m2 - Tenaga 0.09 oh Pekerja x Rp. 55,000.00 = Rp. 4,950.00 0.01 oh Mandor x Rp. 75,000.00 = Rp. 750.00 - Sewa Alat 0.01 oh Alat Bantu x Rp. 75,000.00 = Rp. 750....
ANALISIS HARGA SATUAN PEKERJAAN Perbaikan Atap dan JendelaBalai Struktur dan Konstruksi Bangunan
TAHUN ANGGARAN : 2013 Bongkaran Plafond, 1 m2 - Tenaga 0.09 oh Pekerja 0.01 oh Mandor - Sewa Alat 0.01 oh Alat Bantu
x Rp. x Rp.
55,000.00 = Rp. 75,000.00 = Rp.
4,950.00 750.00
x Rp.
75,000.00 = Rp. Jumlah Rp. Keuntungan 10% Total Dibulatkan
750.00 6,450.00 645.00 7,095.00 7,100.00
Bongkaran Penutup Atap 1 m2 - Tenaga 0.09 oh Pekerja 0.01 oh Mandor '- Alat bantu 0.01 oh Alat Bantu
x Rp. x Rp.
55,000.00 = Rp. 75,000.00 = Rp.
4,950.00 750.00
x Rp.
75,000.00 = Rp. Jumlah Rp. Keuntungan 10% Total Dibulatkan
750.00 6,450.00 645.00 7,095.00 7,100.00
x Rp. x Rp. x Rp.
500,000.00 = Rp. 2,500.00 = Rp. 5,500.00 = Rp.
550,000.00 11,000.00 24,200.00
Pasang kaca tempered tebal 12 mm, 1 m2 - Bahan 1.1 m2 Kaca tempered 12 mm 4.4 m1 Karet List 4.4 m1 sealant - Tenaga 0.9 oh Pekerja 0.75 oh Tukang 0.075 oh Kepala tukang 0.0075 oh Mandor
x x x x
Rp. Rp. Rp. Rp.
55,000.00 60,000.00 70,000.00 75,000.00
= = = =
Keuntungan 10 % Jumlah Pembulatan
Rp. Rp. Rp. Rp. Rp.
49,500.00 45,000.00 5,250.00 562.50 685,512.50 68,551.25 754,063.75 754,000.00
Rangka Plafond (50x100) cm, 1m2 - Bahan 0.014 m3 Kayu Borneo kaso 5/ 7cm 0.16 kg Paku - alat Bantu 0.01 oh Alat Bantu - Tenaga 0.15 oh Pekerja 0.2 oh Tukang 0.03 oh Kepala tukang 0.02 oh Mandor
Pekerjaan Plafond plywood 4 mm, 1m2 - Bahan 0.5 lbr Plywood 0.18 kg Paku - alat Bantu 0.01 oh Alat Bantu - Tenaga 0.07 oh Pekerja 0.48 oh Tukang 0.01 oh Kepala tukang 0.01 oh Mandor
Penutup Atap Zingcalume t=0,5 mm, 1 m2 - Bahan 1.2 m2 Atap Zincalume, t=0.4 mm, 4 bh Paku Kait, tinggi10cm 0.065 oh Alat bantu - Tenaga 0.075 oh Pekerja 0.1 oh Tukang 0.02 oh Kepala tukang 0.0025 oh Mandor
x Rp. x Rp.
4,000,000.00 = Rp. 16,000.00 = Rp.
56,000.00 2,560.00
x Rp.
150,000.00 = Rp.
1,500.00
x x x x
Rp. Rp. Rp. Rp. Rp.
8,250.00 12,000.00 2,100.00 1,500.00 83,910.00 8,391.00 92,301.00 92,000.00
x Rp. x Rp.
50,000.00 = Rp. 16,000.00 = Rp.
25,000.00 2,880.00
x Rp.
150,000.00 = Rp.
1,500.00
x x x x
Rp. Rp. Rp. Rp.
Rp. Rp. Rp. Rp.
x Rp. x Rp. x Rp. x x x x
Rp. Rp. Rp. Rp.
55,000.00 = 60,000.00 = 70,000.00 = 75,000.00 = Jumlah Keuntungan 10% Total Dibulatkan
55,000.00 = 60,000.00 = 70,000.00 = 75,000.00 = Jumlah Keuntungan 10% Total Dibulatkan
Rp. Rp. Rp. Rp. Rp.
3,850.00 28,800.00 700.00 750.00 63,480.00 6,348.00 69,828.00 70,000.00
75,000.00 = Rp. 1,500.00 = Rp. 12,500.00 = Rp.
90,000.00 6,000.00 812.50
55,000.00 = 60,000.00 = 70,000.00 = 75,000.00 = Jumlah Keuntungan 10% Total Dibulatkan
Rp. Rp. Rp. Rp. Rp.
4,125.00 6,000.00 1,400.00 187.50 108,525.00 10,852.50 119,377.50 119,000.00
Bubungan Atap Zincalume t=0,5 mm, 1 m' - Bahan 1.2 m2 Bubungan Zincalume, t=0.4 mm, 4 bh Paku Kait, tinggi10cm 0.065 oh Alat bantu - Tenaga 0.05 oh Pekerja 0.1 oh Tukang 0.02 oh Kepala tukang 0.0025 oh Mandor
x Rp. x Rp. x Rp. x x x x
Rp. Rp. Rp. Rp.
x x x x x
Rp. Rp. Rp. Rp. Rp.
60,000.00 = Rp. 1,000.00 = Rp. 12,500.00 = Rp. 55,000.00 = 60,000.00 = 70,000.00 = 75,000.00 = Jumlah Keuntungan 10% Total Dibulatkan
72,000.00 4,000.00 812.50
Rp. Rp. Rp. Rp. Rp.
2,750.00 6,000.00 1,400.00 187.50 87,150.00 8,715.00 95,865.00 96,000.00
7,500.00 = Rp.
329.25 1,309.84 3,508.80 2,574.00 7,500.00 15,221.89 1,522.19 16,744.08 17,000.00
1 m2 UNIT SCAFOLDING (STOODWERK) 0.0439 bh Main Frame MF 190 0.4678 bh Join Pin 0.5848 bh Cross Brace CB 220 0.1170 bh Cat Walk ( 500 x 1800 ) 1.0000 ls
Upah Kerja
2,800.00 = Rp. 6,000.00 = Rp. 22,000.00 = Rp. 7,500.00 = Rp.
Jumlah Rp. Keuntungan 10% Total Dibulatkan
Bandung, 15 Pebruari 2013 PT. TRI PUTRA DAMAI
HULMAN SINAGA Direktur Utama...