REKAPITULASI RENCANA ANGGARAN BIAYA ( RAB ) SWAKELOLA PDF

Title REKAPITULASI RENCANA ANGGARAN BIAYA ( RAB ) SWAKELOLA
Author Nur Siswanto
Pages 40
File Size 347.7 KB
File Type PDF
Total Downloads 102
Total Views 910

Summary

REKAPITULASI RENCANA ANGGARAN BIAYA ( RAB ) SWAKELOLA PEKERJAAN : PEMBANGUNAN GAPURA GAMPONG LOKASI : ACEH BESAR TAHUN : 2017 Harga Termasuk PPn NO URAIAN PEKERJAAN JUMLAH HARGA (Rp) A PEKERJAAN PERSIAPAN Rp. 2,254,800.00 B UPAH Rp. 7,433,073.46 C BAHAN Rp. 23,221,239.08 D PERALATAN Rp. 1,200,000.00...


Description

REKAPITULASI RENCANA ANGGARAN BIAYA ( RAB ) SWAKELOLA PEKERJAAN LOKASI TAHUN

: PEMBANGUNAN GAPURA GAMPONG : ACEH BESAR : 2017 Harga Termasuk PPn

NO

URAIAN PEKERJAAN

JUMLAH HARGA (Rp)

A

PEKERJAAN PERSIAPAN

Rp.

2,254,800.00

B

UPAH

Rp.

7,433,073.46

C

BAHAN

Rp.

23,221,239.08

D

PERALATAN

Rp.

1,200,000.00

E

LAIN - LAIN

Rp.

10,900,000.00

JUMLAH

Rp.

45,009,112.55

DIBULATKAN

Rp.

45,000,000.00

Terbilang : Empat puluh lima juta rupiah

Lam Urit , Mengetahui/Disetujui Oleh : KEUCHIK ……………………..

KABUPATEN ACEH BESAR

...........

April 2017

Dibuat Oleh : TIM PENGELOLA KEGIATAN (TPK) GAMPONG

......... Ketua

RENCANA ANGGARAN BIAYA ( SWAKELOLA ) PEKERJAAN LOKASI TAHUN

: PEMBANGUNAN GAPURA GAMPONG : ACEH BESAR : 2017 VOLUME

NO

URAIAN

TOTAL

SATUAN

HARGA SATUAN (Rp)

JUMLAH HARGA (Rp)

2

3

4

5

6

1

A 1

PEKERJAAN PERSIAPAN Pengukuran dan Pemasangan 1 M Bouwplank

2

Papan Nama Proyek

3

Dokumentasi, Administrasi dan Pelaporan

B 1

UPAH Pekerja

46.90

2

Tukang

20.16

3

Kepala Tukang

4

Mandor

14.00 1.00

m1

68,200.00

Ls

300,000.00

954,800.00 300,000.00

1.00

Ls

1,000,000.00

1,000,000.00

Sub Jumlah A

2,254,800.00

OH

90,000.00

4,221,043.78

OH

120,000.00

2,418,816.23

2.02

OH

150,000.00

302,914.66

4.09

OH

120,000.00

490,298.80

Sub Jumlah B

7,433,073.46

C 1

BAHAN Semen Portland (PC)

2

Pasir Beton (PB)

3

Kerikil (KR)

4 5

Air Besi Beton Polos

6

Kawat Beton

6.98

Kg

16,500.00

115,223.06

7

Kayu Kelas III

0.51

M3

2,200,000.00

1,132,078.37

8

Paku 5 cm - 10 cm

4.61

Kg

16,500.00

76,048.68

9 10

Minyak Bekisting Balok Kayu Kelas II

2.04 0.11

Liter M3

12,000.00 2,900,000.00

24,433.26 326,098.92

144,000.00

377,824.95

74.09

Zak

57,000.00

4,223,246.43

3.90

M3

75,000.00

292,488.35

5.75 1,612.86 488.83

M3

70,000.00

402,659.66

Liter Kg

150.00 13,750.00

241,929.43 6,721,344.95

11

Mutipleks tebal 9 mm

2.62

Lbr

12

Kayu dolken dia. 8-10 cm, L = 4 M

14.99

Batang

13

Batu Andesit Alur Diagonal 15x30

11.94

14 15

Pasir Pasang Semen Warna

16 17

6,000.00

89,958.32

M2

400,000.00

4,774,000.00

1.18 26.75

M3 Kg

75,000.00 2,660.00

88,657.50 71,141.70

Plamir

0.57

Kg

27,500.00

15,647.50

Cat dasar tembok

0.57

Kg

23,000.00

13,087.00

18

Cat Tembok Weathershield Pro Exterior

1.48

Kg

115,000.00

170,131.00

19

Granit Tile 60 x 60 cm Pholished

53.49

Bh

76,000.00

4,065,240.00

Sub Jumlah C

23,221,239.08

D 1

PERALATAN Benang

1.00

Bh

10,000.00

10,000.00

2

Cangkul Gergaji

2.00

Bh Bh

65,000.00

130,000.00

3 4

Kereta Sorong

1.00 1.00

Unit

55,000.00 430,000.00

55,000.00 430,000.00

5

Meteran 5 Meter

1.00

Bh

25,000.00

25,000.00

6

Palu

1.00

Bh

35,000.00

35,000.00

7

Kunci Besi Ruskam

1.00

Bh Bh

80,000.00

80,000.00

Bh

15,000.00 25,000.00

30,000.00 50,000.00

8 9

Sendok Semen

2.00 2.00

10

Selang Air

10.00

Mtr

10,000.00

100,000.00

11

Sekop

2.00

Bh

85,000.00

170,000.00

12

Timba Plastik Kakak Tua

6.00

Bh Bh

10,000.00

60,000.00

13 E 1

LAIN - LAIN Relief Kolom Gapura

2

Teralis Besi Galvanis 1,5''

3 4

Cetak Lambang A. Besar dan Nama Gampong Stainless Pekerjaan lain-lain

1.00

25,000.00

25,000.00

Sub Jumlah D

1,200,000.00

1.00

Ls

1,000,000.00

1,000,000.00

1.00 1.00

Ls Ls

1,900,000.00

1,900,000.00

5.00

Ls

7,700,000.00 60,000.00

7,700,000.00 300,000.00

Sub Jumlah E

10,900,000.00

RENCANA ANGGARAN BIAYA (KEGIATAN PRASARANA) Provinsi : Aceh Kabupaten : Aceh Besar Kecamatan : Simpang Tiga Desa : Lam Urit

No. RAB : 01 Program : P3MD Aceh Besar Jenis Kegiatan : Pemb Gapura Gampong Ukuran/Dimensi : 1 Unit

Volume

No.

URAIAN

Satuan

HARGA SATUAN (Rp.) + PAJAK

74 Zak 4 M3 6 M3 489.1 Kg 7 Kg 0.51 M3 5 Kg 2 Liter 0.11 M3 3 Lbr 15 Batang 11.94 M2 1.18 M3 26.75 Kg 0.57 Kg 0.57 Kg 1.48 Kg 20.00 Bh 1.00 Ls 1.00 Ls 1.00 Ls 1.00 Unit 1.00 Unit

60,000 160,000 175,000 15,000 20,000 4,256,000 22,000 17,000 5,320,000 135,000 73,000 289,000 162,000 7,000 23,000 21,000 23,000 246,000 1,500,000 1,900,000 7,000,000 300,000 250,000

Total

1 BAHAN 1.1 Semen Portland (PC) 1.2 Pasir Beton (PB) 1.3 Kerikil (KR) 1.4 Besi Beton Polos 1.5 Kawat Beton 1.6 Kayu Kelas III 1.7 Paku 5 cm - 10 cm 1.8 Minyak Bekisting 1.9 Balok Kayu Kelas II 1.10 Multipleks tebal 9 mm 1.11 Kayu dolken dia. 8-10 cm, L = 4 M 1.12 Batu Andesit Alur Diagonal 15x30 1.13 Pasir Pasang 1.14 Semen Warna 1.15 Plamir 1.16 Cat dasar tembok 1.17 Cat Tembok Weathershield Pro Exterior 1.18 Granit Tile 60 x 60 cm Pholished 1.19 Relief Kolom Gapura 1.20 Teralis Besi Galvanis 1,5'' 1.21 Cetak Lambang A. Besar dan Nama Gampong Stainles 1.22 Batu Prasasti 1.23 Papan Nama Proyek

Jumlah Total

4,440,000 640,000 1,050,000 7,337,000 140,000 2,190,000 110,000 34,000 598,000 405,000 1,095,000 3,449,000 192,000 187,000 13,000 12,000 34,000 4,920,000 1,500,000 1,900,000 7,000,000 300,000 250,000 37,796,000

2 PERALATAN 2.1 2.2 3 U PA H 3.1 Pekerja 3.2 Tukang 3.3 Kepala Tukang/Ketua Kelompok 3.4 Biaya penyusunan Rab Desain

47 20 2 1

OH OH OH Bh

82,000 102,000 123,000 1,500,000

TOTAL BIAYA DI BULATKAN

Mengetahui Kepala Desa Lam Urit

( Yusni Sofyan )

3,854,000 2,040,000 246,000 1,500,000 7,640,000 45,436,000 45,436,000

Lam Urit, April 2017 Dibuat Oleh

(

Reza Hasnawy, ST )

RENCANA ANGGARAN BIAYA ( DETAIL ) PEKERJAAN LOKASI TAHUN

: PEMBANGUNAN GAPURA GAMPONG : ACEH BESAR : 2017 VOLUME

NO

URAIAN PEKERJAAN

TOTAL

SATUAN

HARGA SATUAN (Rp)

JUMLAH HARGA (Rp)

2

3

4

5

6

1

A 1

PEKERJAAN PERSIAPAN Pengukuran dan Pemasangan 1 M Bouwplank a. Tenaga Kerja Pekerja Tukang Kayu Kepala Tukang Mandor b. Bahan Kayu 5 x 7 cm (Klas III) Paku 2" -3" Kayu Papan 2/30 (Klas III)

2 3

Papan Nama Proyek Dokumentasi, Administrasi dan Pelaporan

B

PEKERJAAN GERBANG

I 1

PEKERJAAN TANAH Galian Tanah Pondasi a. Tenaga Kerja Pekerja Mandor Urugan Tanah Kembali a. Tenaga Kerja Pekerja Mandor

2

II 1

III 1

PEKERJAAN PASANGAN Acian Kolom a. Tenaga Kerja Pekerja Tukang Kepala Tukang Mandor b. Bahan Semen Portland (PC)

0.1400 0.0700 0.1680 2.8000 0.0980 1.0000 1.0000

OH

90,000.00

126,000.00

OH OH

120,000.00 150,000.00

168,000.00 21,000.00

OH

120,000.00

8,400.00

M3

2,200,000.00

369,600.00

Kg M3

16,500.00 2,200,000.00

46,200.00 215,600.00

Ls Ls

300,000.00 1,000,000.00

300,000.00 1,000,000.00

Jumlah A

2,254,800.00

1.9773 0.0659

OH OH

90,000.00 120,000.00

177,957.00 7,909.20

0.2197 0.0732

OH OH

90,000.00 120,000.00

19,773.00 8,784.48

Sub Jumlah

214,423.68

90,000.00 120,000.00 150,000.00 120,000.00

102,420.00 68,280.00 8,535.00 6,828.00

1.1380 0.5690 0.0569 0.0569

OH OH OH OH

18.4925

Kg

1,425.00

26,351.81

Sub Jumlah

212,414.81

PEKERJAAN BETON / BETON BERTULANG Lantai Kerja Pondasi Umpak a. Tenaga Kerja Pekerja Tukang Kepala Tukang Mandor b. Bahan Semen Portland (PC) Pasir Beton (PB) Kerikil (KR) Air

2

1.4000 1.4000

0.2789 0.0465 0.0047 0.0140 41.7430 146.8610 168.8310 36.3350

OH OH OH OH Kg Kg Kg Liter

90,000.00

25,096.50

120,000.00 150,000.00

5,577.00 709.80

120,000.00

1,683.24

1,425.00

59,483.78

53.57 51.85

7,867.55 8,754.20

150.00

5,450.25

Pondasi Umpak (100x100)x(120x120)x100 cm BETON AHSP PU A.4.1.1.7 a. Tenaga Kerja Pekerja Tukang Kepala Tukang Mandor b. Bahan Semen Portland (PC) Pasir Beton (PB) Kerikil (KR) Air

4.0260 0.6710 0.0683 0.2025 905.2400 1,703.1200 2,554.6800 524.6000

OH OH OH OH Kg Kg Kg Liter

90,000.00

362,340.00

120,000.00 150,000.00 120,000.00

80,520.00 10,248.00 24,302.40

1,425.00

1,289,967.00

53.57 51.85 150.00

91,238.57 132,464.89 78,690.00

VOLUME NO

URAIAN PEKERJAAN

TOTAL

SATUAN

HARGA SATUAN (Rp)

JUMLAH HARGA (Rp)

2

3

4

5

6

1

TULANGAN a. Tenaga Kerja

AHSP PU A.4.1.1.17 0.5662 0.5662

Pekerja Tukang Kepala Tukang

Pekerja

150,000.00 120,000.00

8,492.77 38,824.11

84.9277 1.2133

Kg Kg

13,750.00 16,500.00

1,167,756.40 20,018.68

2.7914 1.3957 0.1396

OH

90,000.00 120,000.00 150,000.00

251,222.40 167,481.60 20,935.20

120,000.00

16,748.16

2,200,000.00 16,500.00 12,000.00

472,384.00 26,571.60 6,441.60

60,000.00

60,000.00

0.1396 0.2147 1.6104 0.5368

Kayu Kelas III Paku 5 cm - 10 cm Minyak Bekisting Pekerjaan lain-lain

OH OH OH M3

1.0000

Kg Liter Ls

1.5098 0.2516 0.0256 0.0759

OH OH OH OH

90,000.00 120,000.00 150,000.00 120,000.00

135,877.50 30,195.00 3,843.00 9,113.40

322.0800 668.8650 943.3650 196.7250

Kg Kg Kg Liter

1,425.00 53.57 51.85 150.00

458,964.00 35,832.05 48,915.22 29,508.75

0.6289 0.6289 0.0629 0.3594

OH OH OH OH

90,000.00 120,000.00 150,000.00 120,000.00

56,599.32 75,465.76 9,433.22 43,123.29

94.3322 1.3476

Kg

13,750.00 16,500.00

1,297,067.74 22,235.45

1.1408

OH OH

Kolom 25/60 t=3.05 m (K1) BETON AHSP PU A.4.1.1.6 a. Tenaga Kerja Pekerja Tukang Kepala Tukang Mandor b. Bahan Semen Portland (PC) Pasir Beton (PB) Kerikil (KR) Air TULANGAN AHSP PU A.4.1.1.17 a. Tenaga Kerja Pekerja Tukang Kepala Tukang Mandor b. Bahan Besi Beton Polos Kawat Beton BEKESTING a. Tenaga Kerja

Kg

AHSP PU A.4.1.1.22

Pekerja Tukang Kepala Tukang Mandor b. Bahan Kayu Kelas III Paku 5 cm - 10 cm Minyak Bekisting Balok Kayu Kelas II Mutipleks tebal 9 mm Kayu dolken dia. 8-10 cm, L = 4 M Pekerjaan lain-lain 4

OH

AHSP PU A.4.1.1.20

Tukang Kepala Tukang Mandor b. Bahan

3

50,956.64 67,942.19

0.0566 0.3235

Mandor b. Bahan Besi Beton Polos Kawat Beton BEKESTING a. Tenaga Kerja

90,000.00 120,000.00

OH OH OH

0.5704 0.0570 0.0570 0.0691 0.6914 0.3457 0.0259 0.6050 3.4569 1.0000

OH OH M3 Kg Liter M3 Lbr Batang Ls

90,000.00

102,669.04

120,000.00 150,000.00

68,446.03 8,555.75

120,000.00

6,844.60

2,200,000.00

152,102.28

16,500.00 12,000.00

11,407.67 4,148.24

2,900,000.00 144,000.00 6,000.00

75,186.92 87,113.12 20,741.22

60,000.00

60,000.00

Kolom 15/40 t=1.5 m (K2) BETON AHSP PU A.4.1.1.6 a. Tenaga Kerja Pekerja Tukang Kepala Tukang Mandor b. Bahan Semen Portland (PC) Pasir Beton (PB) Kerikil (KR) Air

0.2970 0.0495 0.0050 0.0149 63.3600 131.5800 185.5800 38.7000

OH OH OH OH Kg Kg Kg Liter

90,000.00

26,730.00

120,000.00 150,000.00

5,940.00 756.00

120,000.00

1,792.80

1,425.00

90,288.00

53.57 51.85

7,048.93 9,622.67

150.00

5,805.00

VOLUME NO

URAIAN PEKERJAAN

TOTAL

SATUAN

HARGA SATUAN (Rp)

JUMLAH HARGA (Rp)

2

3

4

5

6

1

TULANGAN a. Tenaga Kerja

AHSP PU A.4.1.1.17 0.1625 0.1625

Pekerja Tukang Kepala Tukang

Pekerja

Mutipleks tebal 9 mm Kayu dolken dia. 8-10 cm, L = 4 M Pekerjaan lain-lain Kolom 25/70 t=5.05 m (K3) BETON AHSP PU A.4.1.1.6 a. Tenaga Kerja Pekerja Tukang Kepala Tukang Mandor b. Bahan Semen Portland (PC) Pasir Beton (PB) Kerikil (KR) Air TULANGAN AHSP PU A.4.1.1.17 a. Tenaga Kerja Pekerja Tukang Kepala Tukang Mandor b. Bahan

Pekerja

Kayu Kelas III Paku 5 cm - 10 cm Minyak Bekisting Balok Kayu Kelas II Mutipleks tebal 9 mm Kayu dolken dia. 8-10 cm, L = 4 M Pekerjaan lain-lain Kolom 25/35 t=5.05 m (K4) BETON AHSP PU A.4.1.1.6 a. Tenaga Kerja Pekerja

24.3710 0.3482

Kg Kg

13,750.00 16,500.00

335,101.02 5,744.59

0.3630 0.1815 0.0181

OH

90,000.00 120,000.00 150,000.00

32,669.41 21,779.60 2,722.45

120,000.00

2,177.96

2,200,000.00 16,500.00 12,000.00

48,399.12 3,629.93 1,319.98

2,900,000.00 144,000.00

23,924.57 27,719.50

6,000.00 60,000.00

6,599.88 60,000.00

0.0082 0.1925

OH OH OH M3 Kg Liter M3

1.1000 1.000

Lbr Batang Ls

2.9164 0.4861 0.0495 0.1467

OH OH OH OH

90,000.00 120,000.00 150,000.00 120,000.00

262,473.75 58,327.50 7,423.50 17,604.30

622.1600 1,292.0425 1,822.2925 380.0125

Kg Kg Kg Liter

1,425.00 53.57 51.85 150.00

886,578.00 69,216.56 94,489.24 57,001.88

1.2060 1.2060 0.1206 0.6892

OH OH OH OH

90,000.00 120,000.00 150,000.00 120,000.00

108,541.96 144,722.62 18,090.33 82,698.64

180.9033 2.5843

Kg Kg

13,750.00 16,500.00

2,487,419.98 42,641.49

2.1109 1.0554 0.1055

OH

90,000.00 120,000.00 150,000.00

189,978.50 126,652.33 15,831.54

120,000.00

12,665.23

2,200,000.00 16,500.00 12,000.00

281,449.63 21,108.72 7,675.90

2,900,000.00 144,000.00

139,125.67 161,193.88

6,000.00 60,000.00

38,379.50 60,000.00

90,000.00 120,000.00 150,000.00

131,236.88 29,163.75 3,711.75

120,000.00

8,802.15

AHSP PU A.4.1.1.22

Tukang Kepala Tukang Mandor b. Bahan

Tukang Kepala Tukang Mandor

2,437.10 11,141.02

0.0220 0.2200 0.1100

Paku 5 cm - 10 cm Minyak Bekisting Balok Kayu Kelas II

6

150,000.00 120,000.00

0.0181

Kayu Kelas III

Besi Beton Polos Kawat Beton BEKESTING a. Tenaga Kerja

OH

AHSP PU A.4.1.1.22

Tukang Kepala Tukang Mandor b. Bahan

5

14,622.59 19,496.79

0.0162 0.0928

Mandor b. Bahan Besi Beton Polos Kawat Beton BEKESTING a. Tenaga Kerja

90,000.00 120,000.00

OH OH OH

0.1055 0.1279 1.2793 0.6397 0.0480 1.1194 6.3966 1.000

1.4582 0.2430 0.0247 0.0734

OH OH OH M3 Kg Liter M3 Lbr Batang Ls

OH OH OH OH

VOLUME NO

URAIAN PEKERJAAN

TOTAL

SATUAN

HARGA SATUAN (Rp)

JUMLAH HARGA (Rp)

2

3

4

5

6

1

b. Bahan 311.0800 646.0213 911.1463

Semen Portland (PC) Pasir Beton (PB) Kerikil (KR) Air TULANGAN a. Tenaga Kerja

62,574.54 83,432.72

OH

150,000.00 120,000.00

10,429.09 47,675.84

104.2909 1.4899

Kg Kg

13,750.00 16,500.00

1,433,999.81 24,582.85

1.3331 0.6665 0.0667

OH


Similar Free PDFs