REKAPITULASI RENCANA ANGGARAN BIAYA ( RAB ) SWAKELOLA PEKERJAAN : PEMBANGUNAN GAPURA GAMPONG LOKASI : ACEH BESAR TAHUN : 2017 Harga Termasuk PPn NO URAIAN PEKERJAAN JUMLAH HARGA (Rp) A PEKERJAAN PERSIAPAN Rp. 2,254,800.00 B UPAH Rp. 7,433,073.46 C BAHAN Rp. 23,221,239.08 D PERALATAN Rp. 1,200,000.00...
REKAPITULASI RENCANA ANGGARAN BIAYA ( RAB ) SWAKELOLA PEKERJAAN LOKASI TAHUN
: PEMBANGUNAN GAPURA GAMPONG : ACEH BESAR : 2017 Harga Termasuk PPn
NO
URAIAN PEKERJAAN
JUMLAH HARGA (Rp)
A
PEKERJAAN PERSIAPAN
Rp.
2,254,800.00
B
UPAH
Rp.
7,433,073.46
C
BAHAN
Rp.
23,221,239.08
D
PERALATAN
Rp.
1,200,000.00
E
LAIN - LAIN
Rp.
10,900,000.00
JUMLAH
Rp.
45,009,112.55
DIBULATKAN
Rp.
45,000,000.00
Terbilang : Empat puluh lima juta rupiah
Lam Urit , Mengetahui/Disetujui Oleh : KEUCHIK ……………………..
KABUPATEN ACEH BESAR
...........
April 2017
Dibuat Oleh : TIM PENGELOLA KEGIATAN (TPK) GAMPONG
......... Ketua
RENCANA ANGGARAN BIAYA ( SWAKELOLA ) PEKERJAAN LOKASI TAHUN
: PEMBANGUNAN GAPURA GAMPONG : ACEH BESAR : 2017 VOLUME
NO
URAIAN
TOTAL
SATUAN
HARGA SATUAN (Rp)
JUMLAH HARGA (Rp)
2
3
4
5
6
1
A 1
PEKERJAAN PERSIAPAN Pengukuran dan Pemasangan 1 M Bouwplank
2
Papan Nama Proyek
3
Dokumentasi, Administrasi dan Pelaporan
B 1
UPAH Pekerja
46.90
2
Tukang
20.16
3
Kepala Tukang
4
Mandor
14.00 1.00
m1
68,200.00
Ls
300,000.00
954,800.00 300,000.00
1.00
Ls
1,000,000.00
1,000,000.00
Sub Jumlah A
2,254,800.00
OH
90,000.00
4,221,043.78
OH
120,000.00
2,418,816.23
2.02
OH
150,000.00
302,914.66
4.09
OH
120,000.00
490,298.80
Sub Jumlah B
7,433,073.46
C 1
BAHAN Semen Portland (PC)
2
Pasir Beton (PB)
3
Kerikil (KR)
4 5
Air Besi Beton Polos
6
Kawat Beton
6.98
Kg
16,500.00
115,223.06
7
Kayu Kelas III
0.51
M3
2,200,000.00
1,132,078.37
8
Paku 5 cm - 10 cm
4.61
Kg
16,500.00
76,048.68
9 10
Minyak Bekisting Balok Kayu Kelas II
2.04 0.11
Liter M3
12,000.00 2,900,000.00
24,433.26 326,098.92
144,000.00
377,824.95
74.09
Zak
57,000.00
4,223,246.43
3.90
M3
75,000.00
292,488.35
5.75 1,612.86 488.83
M3
70,000.00
402,659.66
Liter Kg
150.00 13,750.00
241,929.43 6,721,344.95
11
Mutipleks tebal 9 mm
2.62
Lbr
12
Kayu dolken dia. 8-10 cm, L = 4 M
14.99
Batang
13
Batu Andesit Alur Diagonal 15x30
11.94
14 15
Pasir Pasang Semen Warna
16 17
6,000.00
89,958.32
M2
400,000.00
4,774,000.00
1.18 26.75
M3 Kg
75,000.00 2,660.00
88,657.50 71,141.70
Plamir
0.57
Kg
27,500.00
15,647.50
Cat dasar tembok
0.57
Kg
23,000.00
13,087.00
18
Cat Tembok Weathershield Pro Exterior
1.48
Kg
115,000.00
170,131.00
19
Granit Tile 60 x 60 cm Pholished
53.49
Bh
76,000.00
4,065,240.00
Sub Jumlah C
23,221,239.08
D 1
PERALATAN Benang
1.00
Bh
10,000.00
10,000.00
2
Cangkul Gergaji
2.00
Bh Bh
65,000.00
130,000.00
3 4
Kereta Sorong
1.00 1.00
Unit
55,000.00 430,000.00
55,000.00 430,000.00
5
Meteran 5 Meter
1.00
Bh
25,000.00
25,000.00
6
Palu
1.00
Bh
35,000.00
35,000.00
7
Kunci Besi Ruskam
1.00
Bh Bh
80,000.00
80,000.00
Bh
15,000.00 25,000.00
30,000.00 50,000.00
8 9
Sendok Semen
2.00 2.00
10
Selang Air
10.00
Mtr
10,000.00
100,000.00
11
Sekop
2.00
Bh
85,000.00
170,000.00
12
Timba Plastik Kakak Tua
6.00
Bh Bh
10,000.00
60,000.00
13 E 1
LAIN - LAIN Relief Kolom Gapura
2
Teralis Besi Galvanis 1,5''
3 4
Cetak Lambang A. Besar dan Nama Gampong Stainless Pekerjaan lain-lain
1.00
25,000.00
25,000.00
Sub Jumlah D
1,200,000.00
1.00
Ls
1,000,000.00
1,000,000.00
1.00 1.00
Ls Ls
1,900,000.00
1,900,000.00
5.00
Ls
7,700,000.00 60,000.00
7,700,000.00 300,000.00
Sub Jumlah E
10,900,000.00
RENCANA ANGGARAN BIAYA (KEGIATAN PRASARANA) Provinsi : Aceh Kabupaten : Aceh Besar Kecamatan : Simpang Tiga Desa : Lam Urit
No. RAB : 01 Program : P3MD Aceh Besar Jenis Kegiatan : Pemb Gapura Gampong Ukuran/Dimensi : 1 Unit
Volume
No.
URAIAN
Satuan
HARGA SATUAN (Rp.) + PAJAK
74 Zak 4 M3 6 M3 489.1 Kg 7 Kg 0.51 M3 5 Kg 2 Liter 0.11 M3 3 Lbr 15 Batang 11.94 M2 1.18 M3 26.75 Kg 0.57 Kg 0.57 Kg 1.48 Kg 20.00 Bh 1.00 Ls 1.00 Ls 1.00 Ls 1.00 Unit 1.00 Unit
60,000 160,000 175,000 15,000 20,000 4,256,000 22,000 17,000 5,320,000 135,000 73,000 289,000 162,000 7,000 23,000 21,000 23,000 246,000 1,500,000 1,900,000 7,000,000 300,000 250,000
Total
1 BAHAN 1.1 Semen Portland (PC) 1.2 Pasir Beton (PB) 1.3 Kerikil (KR) 1.4 Besi Beton Polos 1.5 Kawat Beton 1.6 Kayu Kelas III 1.7 Paku 5 cm - 10 cm 1.8 Minyak Bekisting 1.9 Balok Kayu Kelas II 1.10 Multipleks tebal 9 mm 1.11 Kayu dolken dia. 8-10 cm, L = 4 M 1.12 Batu Andesit Alur Diagonal 15x30 1.13 Pasir Pasang 1.14 Semen Warna 1.15 Plamir 1.16 Cat dasar tembok 1.17 Cat Tembok Weathershield Pro Exterior 1.18 Granit Tile 60 x 60 cm Pholished 1.19 Relief Kolom Gapura 1.20 Teralis Besi Galvanis 1,5'' 1.21 Cetak Lambang A. Besar dan Nama Gampong Stainles 1.22 Batu Prasasti 1.23 Papan Nama Proyek
Jumlah Total
4,440,000 640,000 1,050,000 7,337,000 140,000 2,190,000 110,000 34,000 598,000 405,000 1,095,000 3,449,000 192,000 187,000 13,000 12,000 34,000 4,920,000 1,500,000 1,900,000 7,000,000 300,000 250,000 37,796,000
2 PERALATAN 2.1 2.2 3 U PA H 3.1 Pekerja 3.2 Tukang 3.3 Kepala Tukang/Ketua Kelompok 3.4 Biaya penyusunan Rab Desain
47 20 2 1
OH OH OH Bh
82,000 102,000 123,000 1,500,000
TOTAL BIAYA DI BULATKAN
Mengetahui Kepala Desa Lam Urit
( Yusni Sofyan )
3,854,000 2,040,000 246,000 1,500,000 7,640,000 45,436,000 45,436,000
Lam Urit, April 2017 Dibuat Oleh
(
Reza Hasnawy, ST )
RENCANA ANGGARAN BIAYA ( DETAIL ) PEKERJAAN LOKASI TAHUN
: PEMBANGUNAN GAPURA GAMPONG : ACEH BESAR : 2017 VOLUME
NO
URAIAN PEKERJAAN
TOTAL
SATUAN
HARGA SATUAN (Rp)
JUMLAH HARGA (Rp)
2
3
4
5
6
1
A 1
PEKERJAAN PERSIAPAN Pengukuran dan Pemasangan 1 M Bouwplank a. Tenaga Kerja Pekerja Tukang Kayu Kepala Tukang Mandor b. Bahan Kayu 5 x 7 cm (Klas III) Paku 2" -3" Kayu Papan 2/30 (Klas III)
2 3
Papan Nama Proyek Dokumentasi, Administrasi dan Pelaporan
B
PEKERJAAN GERBANG
I 1
PEKERJAAN TANAH Galian Tanah Pondasi a. Tenaga Kerja Pekerja Mandor Urugan Tanah Kembali a. Tenaga Kerja Pekerja Mandor
2
II 1
III 1
PEKERJAAN PASANGAN Acian Kolom a. Tenaga Kerja Pekerja Tukang Kepala Tukang Mandor b. Bahan Semen Portland (PC)
0.1400 0.0700 0.1680 2.8000 0.0980 1.0000 1.0000
OH
90,000.00
126,000.00
OH OH
120,000.00 150,000.00
168,000.00 21,000.00
OH
120,000.00
8,400.00
M3
2,200,000.00
369,600.00
Kg M3
16,500.00 2,200,000.00
46,200.00 215,600.00
Ls Ls
300,000.00 1,000,000.00
300,000.00 1,000,000.00
Jumlah A
2,254,800.00
1.9773 0.0659
OH OH
90,000.00 120,000.00
177,957.00 7,909.20
0.2197 0.0732
OH OH
90,000.00 120,000.00
19,773.00 8,784.48
Sub Jumlah
214,423.68
90,000.00 120,000.00 150,000.00 120,000.00
102,420.00 68,280.00 8,535.00 6,828.00
1.1380 0.5690 0.0569 0.0569
OH OH OH OH
18.4925
Kg
1,425.00
26,351.81
Sub Jumlah
212,414.81
PEKERJAAN BETON / BETON BERTULANG Lantai Kerja Pondasi Umpak a. Tenaga Kerja Pekerja Tukang Kepala Tukang Mandor b. Bahan Semen Portland (PC) Pasir Beton (PB) Kerikil (KR) Air
2
1.4000 1.4000
0.2789 0.0465 0.0047 0.0140 41.7430 146.8610 168.8310 36.3350
OH OH OH OH Kg Kg Kg Liter
90,000.00
25,096.50
120,000.00 150,000.00
5,577.00 709.80
120,000.00
1,683.24
1,425.00
59,483.78
53.57 51.85
7,867.55 8,754.20
150.00
5,450.25
Pondasi Umpak (100x100)x(120x120)x100 cm BETON AHSP PU A.4.1.1.7 a. Tenaga Kerja Pekerja Tukang Kepala Tukang Mandor b. Bahan Semen Portland (PC) Pasir Beton (PB) Kerikil (KR) Air
4.0260 0.6710 0.0683 0.2025 905.2400 1,703.1200 2,554.6800 524.6000
OH OH OH OH Kg Kg Kg Liter
90,000.00
362,340.00
120,000.00 150,000.00 120,000.00
80,520.00 10,248.00 24,302.40
1,425.00
1,289,967.00
53.57 51.85 150.00
91,238.57 132,464.89 78,690.00
VOLUME NO
URAIAN PEKERJAAN
TOTAL
SATUAN
HARGA SATUAN (Rp)
JUMLAH HARGA (Rp)
2
3
4
5
6
1
TULANGAN a. Tenaga Kerja
AHSP PU A.4.1.1.17 0.5662 0.5662
Pekerja Tukang Kepala Tukang
Pekerja
150,000.00 120,000.00
8,492.77 38,824.11
84.9277 1.2133
Kg Kg
13,750.00 16,500.00
1,167,756.40 20,018.68
2.7914 1.3957 0.1396
OH
90,000.00 120,000.00 150,000.00
251,222.40 167,481.60 20,935.20
120,000.00
16,748.16
2,200,000.00 16,500.00 12,000.00
472,384.00 26,571.60 6,441.60
60,000.00
60,000.00
0.1396 0.2147 1.6104 0.5368
Kayu Kelas III Paku 5 cm - 10 cm Minyak Bekisting Pekerjaan lain-lain
OH OH OH M3
1.0000
Kg Liter Ls
1.5098 0.2516 0.0256 0.0759
OH OH OH OH
90,000.00 120,000.00 150,000.00 120,000.00
135,877.50 30,195.00 3,843.00 9,113.40
322.0800 668.8650 943.3650 196.7250
Kg Kg Kg Liter
1,425.00 53.57 51.85 150.00
458,964.00 35,832.05 48,915.22 29,508.75
0.6289 0.6289 0.0629 0.3594
OH OH OH OH
90,000.00 120,000.00 150,000.00 120,000.00
56,599.32 75,465.76 9,433.22 43,123.29
94.3322 1.3476
Kg
13,750.00 16,500.00
1,297,067.74 22,235.45
1.1408
OH OH
Kolom 25/60 t=3.05 m (K1) BETON AHSP PU A.4.1.1.6 a. Tenaga Kerja Pekerja Tukang Kepala Tukang Mandor b. Bahan Semen Portland (PC) Pasir Beton (PB) Kerikil (KR) Air TULANGAN AHSP PU A.4.1.1.17 a. Tenaga Kerja Pekerja Tukang Kepala Tukang Mandor b. Bahan Besi Beton Polos Kawat Beton BEKESTING a. Tenaga Kerja
Kg
AHSP PU A.4.1.1.22
Pekerja Tukang Kepala Tukang Mandor b. Bahan Kayu Kelas III Paku 5 cm - 10 cm Minyak Bekisting Balok Kayu Kelas II Mutipleks tebal 9 mm Kayu dolken dia. 8-10 cm, L = 4 M Pekerjaan lain-lain 4
OH
AHSP PU A.4.1.1.20
Tukang Kepala Tukang Mandor b. Bahan
3
50,956.64 67,942.19
0.0566 0.3235
Mandor b. Bahan Besi Beton Polos Kawat Beton BEKESTING a. Tenaga Kerja
90,000.00 120,000.00
OH OH OH
0.5704 0.0570 0.0570 0.0691 0.6914 0.3457 0.0259 0.6050 3.4569 1.0000
OH OH M3 Kg Liter M3 Lbr Batang Ls
90,000.00
102,669.04
120,000.00 150,000.00
68,446.03 8,555.75
120,000.00
6,844.60
2,200,000.00
152,102.28
16,500.00 12,000.00
11,407.67 4,148.24
2,900,000.00 144,000.00 6,000.00
75,186.92 87,113.12 20,741.22
60,000.00
60,000.00
Kolom 15/40 t=1.5 m (K2) BETON AHSP PU A.4.1.1.6 a. Tenaga Kerja Pekerja Tukang Kepala Tukang Mandor b. Bahan Semen Portland (PC) Pasir Beton (PB) Kerikil (KR) Air
0.2970 0.0495 0.0050 0.0149 63.3600 131.5800 185.5800 38.7000
OH OH OH OH Kg Kg Kg Liter
90,000.00
26,730.00
120,000.00 150,000.00
5,940.00 756.00
120,000.00
1,792.80
1,425.00
90,288.00
53.57 51.85
7,048.93 9,622.67
150.00
5,805.00
VOLUME NO
URAIAN PEKERJAAN
TOTAL
SATUAN
HARGA SATUAN (Rp)
JUMLAH HARGA (Rp)
2
3
4
5
6
1
TULANGAN a. Tenaga Kerja
AHSP PU A.4.1.1.17 0.1625 0.1625
Pekerja Tukang Kepala Tukang
Pekerja
Mutipleks tebal 9 mm Kayu dolken dia. 8-10 cm, L = 4 M Pekerjaan lain-lain Kolom 25/70 t=5.05 m (K3) BETON AHSP PU A.4.1.1.6 a. Tenaga Kerja Pekerja Tukang Kepala Tukang Mandor b. Bahan Semen Portland (PC) Pasir Beton (PB) Kerikil (KR) Air TULANGAN AHSP PU A.4.1.1.17 a. Tenaga Kerja Pekerja Tukang Kepala Tukang Mandor b. Bahan
Pekerja
Kayu Kelas III Paku 5 cm - 10 cm Minyak Bekisting Balok Kayu Kelas II Mutipleks tebal 9 mm Kayu dolken dia. 8-10 cm, L = 4 M Pekerjaan lain-lain Kolom 25/35 t=5.05 m (K4) BETON AHSP PU A.4.1.1.6 a. Tenaga Kerja Pekerja
24.3710 0.3482
Kg Kg
13,750.00 16,500.00
335,101.02 5,744.59
0.3630 0.1815 0.0181
OH
90,000.00 120,000.00 150,000.00
32,669.41 21,779.60 2,722.45
120,000.00
2,177.96
2,200,000.00 16,500.00 12,000.00
48,399.12 3,629.93 1,319.98
2,900,000.00 144,000.00
23,924.57 27,719.50
6,000.00 60,000.00
6,599.88 60,000.00
0.0082 0.1925
OH OH OH M3 Kg Liter M3
1.1000 1.000
Lbr Batang Ls
2.9164 0.4861 0.0495 0.1467
OH OH OH OH
90,000.00 120,000.00 150,000.00 120,000.00
262,473.75 58,327.50 7,423.50 17,604.30
622.1600 1,292.0425 1,822.2925 380.0125
Kg Kg Kg Liter
1,425.00 53.57 51.85 150.00
886,578.00 69,216.56 94,489.24 57,001.88
1.2060 1.2060 0.1206 0.6892
OH OH OH OH
90,000.00 120,000.00 150,000.00 120,000.00
108,541.96 144,722.62 18,090.33 82,698.64
180.9033 2.5843
Kg Kg
13,750.00 16,500.00
2,487,419.98 42,641.49
2.1109 1.0554 0.1055
OH
90,000.00 120,000.00 150,000.00
189,978.50 126,652.33 15,831.54
120,000.00
12,665.23
2,200,000.00 16,500.00 12,000.00
281,449.63 21,108.72 7,675.90
2,900,000.00 144,000.00
139,125.67 161,193.88
6,000.00 60,000.00
38,379.50 60,000.00
90,000.00 120,000.00 150,000.00
131,236.88 29,163.75 3,711.75
120,000.00
8,802.15
AHSP PU A.4.1.1.22
Tukang Kepala Tukang Mandor b. Bahan
Tukang Kepala Tukang Mandor
2,437.10 11,141.02
0.0220 0.2200 0.1100
Paku 5 cm - 10 cm Minyak Bekisting Balok Kayu Kelas II
6
150,000.00 120,000.00
0.0181
Kayu Kelas III
Besi Beton Polos Kawat Beton BEKESTING a. Tenaga Kerja
OH
AHSP PU A.4.1.1.22
Tukang Kepala Tukang Mandor b. Bahan
5
14,622.59 19,496.79
0.0162 0.0928
Mandor b. Bahan Besi Beton Polos Kawat Beton BEKESTING a. Tenaga Kerja
90,000.00 120,000.00
OH OH OH
0.1055 0.1279 1.2793 0.6397 0.0480 1.1194 6.3966 1.000
1.4582 0.2430 0.0247 0.0734
OH OH OH M3 Kg Liter M3 Lbr Batang Ls
OH OH OH OH
VOLUME NO
URAIAN PEKERJAAN
TOTAL
SATUAN
HARGA SATUAN (Rp)
JUMLAH HARGA (Rp)
2
3
4
5
6
1
b. Bahan 311.0800 646.0213 911.1463
Semen Portland (PC) Pasir Beton (PB) Kerikil (KR) Air TULANGAN a. Tenaga Kerja
62,574.54 83,432.72
OH
150,000.00 120,000.00
10,429.09 47,675.84
104.2909 1.4899
Kg Kg
13,750.00 16,500.00
1,433,999.81 24,582.85
1.3331 0.6665 0.0667
OH