WORK BREAKDOWN STRUCTURE OF BASEBALL STADIUM PDF

Title WORK BREAKDOWN STRUCTURE OF BASEBALL STADIUM
Course Projecting Planning - Schedule and Budget
Institution Conestoga College
Pages 3
File Size 81.6 KB
File Type PDF
Total Downloads 119
Total Views 158

Summary

Work Breakdown Structure (25-30 items)
Create WBS in MS Word using either tabular or chart form
Minimum 3 levels of work in your WBS (levels 1 and 2 are provided in the case)
Minimum 3 work packages at level 3...


Description

Work Breakdown Structure – Avignon Stadium Level – 1 Avignon Baseball Stadium 1. Clearing the site 1.1. Documentation and compliance 1.1.1. Obtaining required permits 1.1.2. Prepare documents for record Keeping 1.2. Emptying the old set up 1.2.1. Removal of old fixtures and furniture 1.2.2. Removing rocks, unwanted debris 1.2.3. Filling all the burrows and holes 1.3. Demolition adjacent building 1.3.1. Removal of the structure 1.3.2. Creation of construction stage 1.3.3. Make storage facility 2. Preparing the site 2.1. Evaluation 2.1.1. Checking for hazardous materials 2.1.2. Site inspection by the PM 2.1.3. Preparing underground utility map 2.2. Preparing the base 2.2.1. Driving support piling 2.2.2. Pouring lower concrete 2.3. Temporary essential setup 2.3.1. Installing portable toilets 2.3.2. Portable water connection 2.3.3. Temporary pond for construction use 3. Construction of the ground 3.1. Seating Arrangements 3.1.1. Installing permanent stands 3.1.2. Instal Foldable chairs 3.1.3. Installing Luxury seating arrangements 3.2. Play field 3.2.1. Leveling ground 3.2.2. Placing paddings 3.2.3. Insert Artificial turf 3.3. Ancillary facilities 3.3.1. Fixing Lightings 3.3.2. Installing walking ramps 3.3.3. Installing dashboards 3.4. Stadium Infrastructure 3.4.1. Making Luxury boxes 3.4.2. Preparing restaurant areas 3.4.3. Installing Lockers 3.4.4. Constructing Gym

3.4.5. Constructing Washrooms 4. Roof Installation 4.1. Preparation 4.1.1. Taking dimensions 4.1.2. Documenting dimensions 4.1.3. Procuring materials for roof 4.2. Preparing roof 4.2.1. Identify alternate site 4.2.2. Assemble materials 4.2.3. Finalize structure 4.3. Developing software 4.3.1. Setting up wireless 4.3.2. Installing software 4.3.3. Testing 4.4. Installing Roof 4.4.1. Construct roof support 4.4.2. Instal roof tracks 4.4.3. Instal roof 5. Inspection 5.1. Fixture inspection 5.1.1. Electric lines inspection 5.1.2. Drainage system inspection 5.1.3. Quality inspection of all the fixtures 5.2. Building structure Inspection 5.2.1. Landscape inspection 5.2.2. Internal and external paintwork 5.2.3. Concrete pavement Inspection 5.3. Documentation 5.3.1. Documenting structural defects 5.3.2. Setting deadlines for repairs 5.3.3. Prepare hand over documents 5.4. Handing Over 5.4.1. Inspection certificate 5.4.2. Handing over warranty certificate 5.4.3. Handing over all Final Certificates

Work- Breakdown structure Narrative

The above is the work breakdown structure of Avignon Baseball stadium. It is assumed that the requirements and the design and structure of the stadium are finalized and the construction is about to start. The construction of the stadium is classified into 5 parts. Since this is a renewed version of the stadium, the first step would be to remove the existing structure and clear the site. This phase will include the project manager visiting the site and evaluating the conditions of the site and obtaining necessary permits for demolishing the old structure. Old fittings and fixtures would be removed, and the ground would be leveled out. A new site for construction base and storing equipment would be identified. The next step would be to prepare the site for developing the ground, for which an underground utility map would be prepared so that underground water supply, cables, or pipes are not disturbed. Temporary toilets for workers and a pond for water requirements would be developed. The third group would be to work on the fittings, furniture, and stadium infrastructure. The roof Installation phase would include taking the dimensions and preparing the roof part in an alternative site. Developing wireless software to operate the roof will also be developed. After the final preparation of the roof, the roof will be installed. The fifth work breakdown would be the Inspection process, in which the PM will inspect the infrastructure, the fittings, electric systems, drainage systems. Any errors found during this will be documented and the deadline would be fixed. After the final inspection, important documents like the Inspection certificate, warranty certificate, and final certificates would be handed over....