SWEP Project - PREPARATION OF A BILL OF ENGINEERING MEASUREMENT AND EVALUATION (BEME) FOR A 5 BEDROOM FLAT BUILDING (Electrical Power segment)....


Description

UNIVERSITY OF ILORIN

PREPARATION OF A BILL OF ENGINEERING MEASUREMENT AND EVALUATION (BEME) FOR A 5 BEDROOM FLAT BUILDING

BY GROUP B3, SUBGROUP 2 STUDENTS WORK EXPERIENCE PROGRAMME (SWEP) (2019/2020 SESSION)

SUBMITTED TO:ENGR. B.O ARIYO

FACULTY OF ENGINEERING AND TECHNOLOGY STUDENTS WORK EXPERIENCE PROGRAMME (S.W.E.P) ’19

7TH JUNE, 2021.

GR GROUP OUP B3, SUBGR SUBGROUP OUP 2

NAME

AJAYI ANOINTING MOLOLUWA AKINROLABU OLADIPUPO BLESSING ADELEKE KAYODE AKEEM GBOLAHAN AKINKUNMI ADEYEMI ABDULBASIT ADEDAYO AJAO QUADRI OLANREWAJU ADEWUYI TAIWO UMAR

MATRIC NUMBER

SIGNATURE

INTR INTRODUCTION ODUCTION Before any engineering/building work is done, it is required to know beforehand the plausible cost of construction known as the Estimated Cost. A tool called Bill of Engineering Measurement and Evaluation (BEME) is used before, during and post construction of a proposed project. It includes the cost of materials, labour, equipment and other resources needed to ensure the successful completion of the project.

QUESTION A 5 bedroom flat has the following load, recommend the appropriate distribution board (DB) for such building.

1. 38 no of 9W Energy saving lighting bulbs. 2. 5 no of 20W ceiling fan. 3. 35 no of 13A socket outlet. 4. 10 no of 15A socket outlet. 5. 1 no of cooker. 6. 1 no of washing machine. 7. 1 no of pumping machine. 8. 2 no of Refrigerators.

REGULA REGULATIO TIO TIONS NS ON DISTRIB DISTRIBUTION UTION BO BOARD ARD (DB) PR PRO OTECTIVE FUSE RA RAT TING

FINAL SUB-CIRCUIT

CABLE SIZE

IEEE REGULATIONS ON D.B PROTECTIVE FUSE RATING

Lighting Point

1.5mm2 2 core cable

5A

13A Socket Outlet

2.5mm2 3 core cable

4 No = 15A

15A Socket Outlet

2.5mm2 3 core cable

1 No = 15A

1 Cooker control unit

1 No = 30A

1 Washing Machine

4mm2/ 6mm2 2 core cable 6mm23 core cable

1 No = 30A

1 Pumping Machine

10mm23 core cable

1 No = 30A

OBJECTIVES To calculate the Estimate cost of materials needed for the electrical wiring of a 5 bedroom flat building.

QUO QUOT TATION FOR THE ELECTRICAL WIRI WIRING NG OF A 5 BEDR BEDROOM OOM FLA FLAT TB BUILDING UILDING Item Description

Quanti ty

Rate (N)

Amount (N)

(kobo)

9W Energy saving Lighting Bulb

38

450

17,100

00

Lamp Holder 25W Ceiling Fan 13A Socket Outlet 15A Socket Outlet Air Conditioner

38 5 35 10 6 1 1 2

Distribution Board 1.5mm2 single core 2.5mm2 single core 4mm2 single core 6mm2 single core 10mm2 single core

1 4 4 2 1 2

46,000 15,000 20,000 28,000 39,000 75,000

8ft Copper Earth Rod Earth Leakage Circuit Breaker (ELCB) 50kg bag of Salt TOTAL

1 1

8,000 19,550

11,400 45,000 17,500 8,000 600,00 0 90,500 35,000 180,00 0 46,000 60,000 80,000 56,000 39,000 150,00 0 8,000 19,550

00 00 00 00 00

Washing Machine Pumping Machine Refrigerator

300 9,000 500 800 100,00 0 90,500 35,000 90,000

1 -

4,100 -

4,100 1,470,1 50

Contingency(10% increase in the total amount) = N1,617,165 Workmanship charges = 25% of Contingency =N404,292 Total Fee = N1,617,165+ N404,292

00 00 00 00 00 00 00 00 00 00 00 00 00

= N2,021,457

LOAD ESTIMA ESTIMATION TION CAL CALCULA CULA CULATION TION

LIGTHING POINT - 38 No of 9W energy savings lighting bulb Current (load) I = Power (P) / Voltage(V) I = (9/240) x 38 I = 1.425A

- 25W Ceiling Fan Current (load) I = Power (P) / Voltage (V) I = (25/240) x 5 I = 0.521A TOTAL CURRENT FOR LIGHTING POINT = 1.425A + 0.521A= 1.946A

SOCKET OUTLET - 35 No. of 13A socket outlet I = (13 x 35A) / 4 I = 113.75A

- 10 No. of 15A socket outlet I= (10x15A) / 4

I = 37.5A

AIR CONDITIONER - 6 No. of air conditioner I = 6x15A I = 90A WASHING MACHINE - 1 No. of washing machine I = 30A

PUMPING MACHINE - 1 No. of pumping machine I = 1 x30A I = 30A

REFRIGERATOR - 2 No. of refrigerators I = 2 x15A I = 30A

COOKER - 1 No. of cooker

I = 1 x 30A I = 30A

Components

Curre Number of ways on D.B nt

9W Energy saving lighting bulb,

5A

1

13A Socket Outlet

114A

10

15A Socket Outlet

38A

3

Pumping Machine

30A

1

Refrigerator

30A

1

Washing Machine

30A

1

Coker control unit

30A

1

Air Conditioner

90A

6

TOTAL

367

24

25W Ceiling fan.

CONCL CONCLUSION USION Prior to the above estimates given above, the Estimated cost of the electric wiring of a five (5) bedroom flat building isN2,021,457 (Two million, twenty-one thousand, four hundred and fifty-seven Nairaonly). Also, the Estimated Load consumption is given to be 367A, 24ways. Therefore, the recommended Distribution Board (DB) for the building is a 400A, 36ways, single phased Distribution board....