Title | F10 Form Explanation |
---|---|
Course | Integrative Studies 1 - Surveying |
Institution | The Robert Gordon University |
Pages | 1 |
File Size | 50.4 KB |
File Type | |
Total Downloads | 9 |
Total Views | 175 |
Explanation of an F10 form....
F10 Form
Explaining the form: The location of the construction project has been clearly noted. Some details are given about the project such as timescale and number of people on site, as well as a short description. There have been 15 contractors allocated to the site, this allows for: • • • • • • • • • • • • • • •
Joiner Electrician Glazier Landscaper Plumber HVAC (Heating, ventilation, air conditioning) Painter and Decorator Roofer Utility Fitter Heavy Equipment Operators Flooring Fitter Drainage services Concrete Specialists Transportation Company Main Contractor (labourers)
The form then goes on to give details of those involved in the project. Following that is the declaration details under the Construction Design and Management Regulations 2015. Clarifying that either the client or someone on behalf of the client understand their duties under these regulations....