Title | LIBRO R Buckminster Fuller Critical Path PDF |
---|---|
Author | Joel Martin |
Pages | 510 |
File Size | 63.5 MB |
File Type | |
Total Downloads | 12 |
Total Views | 40 |
v R. Buckminster Fuller Critical Path Kiyoshi Kuromiya, Adjuvant CONTENTS Foreword — (ix) Introduction: Twilight of the World's Power Structures (xvii-xxxviii) 1. Speculative Prehistory of Humanity 3 2. Humans in Universe 25 3. Legally Piggily 60 II 4. Self-Disciplines of Buckminster Fuller 123 ...
v
R. Buckminster Fuller
Critical
Path
Kiyoshi Kuromiya,
Adjuvant
CONTENTS
Foreword
—
(ix)
Introduction: Twilight of the World's
Power
Structures (xvii-xxxviii)
1.
Speculative Prehistory of
Humanity
2.
Humans
25
3.
Legally Piggily
in
Universe
3
60
II 4.
Self-Disciplines of Buckminster Fuller
5.
The Geoscope World Game
6.
123
161
198
III 7.
Critical Path: Part
8.
Critical Path: Part
One Two
9.
Critical Path: Part
Three
10.
Critical Path: Part
Four
229
252
270 309
Appendix
1.
Chronology of
Appendix
2.
Chronological Inventory of Prominent Technological,
1895 to Date
Index
411
Scientific Discoveries
Economic and 378
and Artifacts
Political
Scientific,
World Events:
347
Foreword
It
the author's working assumption
is
meaningless. This
that the
words good and bad are
based on science and not on opinion. In 1922 physicists
is
discovered a fundamental complementarity of disparate individual phenom-
ena to be operative
in physical Universe.
This was fundamentally amplified
with the subsequent discovery of the always-and-only-different, always-coexisting proton
and neutron which, with
positrons, neutrinos,
No
their always-coexistent electrons,
and antineutrinos, are eternally intertransformable.
longer was valid the "building block" of the Universe.
ered that unity was plural and at
minimum
tations are essential to the successful
sixfold. All the
It
accomplishment of eternally regener-
ative Universe. Science's discovery of
fundamental complementarity has
frequently occasioned individual scientists' realization that the tive
was discov-
intercomplemen-
used as the opposite of the word positive
is
word nega-
at best carelessly
and mis-
informedly employed. Since complementarity Universe, the
essential to the success of eternally regenerative
is
phenomenon
nor can
tofore as
good and bad are
it
identified as the opposite of positive
cannot be
be bad, since the interopposed phenomena known here-
negative,
regenerative Universe.
essential to the 100-percent success of eternally
They
are both good for the Universe.
many fundamentally complementary aspects of Unihole is not a negative. As implosion is to explosion, the
Science recognizes verse.
The black phenomenon
black hole hole
is
is
the inverse phase
to the inside-out,
—the outside-inning phase—of cosmic good and bad —or
What humans have spontaneously itive
and negative
expanding Universe. The black evolution.
identified as
—are evolutionary complementations
in
as pos-
need of more ac-
curate identifications.
IX
x
Critical Path you want
If
your ship to windward through a narrow passage, you
to sail
have to do what
windward"
sailors call "beating to
—
first
you
sail
on your
port tack, then on your starboard tack, then port, then starboard, again and again, not left foot,
This book
is
I
walk right
foot,
written with the conviction that there are no "good" or
"bad" people, no matter how offensive or eccentric seem.
We
on your "good tack" and your "bad tack."
not right foot, wrong foot.
am
confident that
if I
known humans,
stances as any other
to society they
may
were born and reared under the same circumI
would have behaved much
as they
have.
There's a short verse written long ago by an English poet and teacher, Elizabeth Wordsworth:
If all good people were
And
all clever
clever,
people were good,
The world would be nicer than ever
We
thought that
But somehow, That the two
it
'tis
hit
possibly could.
seldom or never
it
off as they should;
For the good are so harsh
The
you think you
If
identify with
anybody
I
ple.
God
included
What
designed people.
humans
am
You and
trying to
do
is
I
didn't design peo-
to discover
we humans
if
For many years
I
God
permits us progressively to
hesitated about writing this book.
God
has introduced
many, many thousands of humans. Quite a few of those have had decision-making powers that could, and often did, major ways.
sands of decisions cisions
Much
made by
inadvertently
know and
are to continue in Universe.
to
affairs in
why God
in Universe.
I'm trying to find out what preferably to do
I
be sure to remember
in this book,
don't have any "good" or "bad" people.
that
me
to the clever,
clever so rude to the good.
I
have known
affect
human
of their decision-making integrated with thou-
other Earthians.
The
integrated thousands of de-
were compounded with a myriad of unforeseen
technological, exploratory,
and environmental happenings. The individual
decision-makings and unforeseen happenings around the world and in Universe at large altogether synergetically produced historical
results
not
contemplated by any. Such noncontemplated-by-any results constitute evolution
In
—the
my
will of
God.
eighty-five years
I
secret, critical information.
have often been privy to what was
Time and change have
crets. In piecing together the significant
at the
time
"declassified" those se-
components of world-around hu-
Foreword
xi
my
inanity's evolutionary trending,
by information confided information, which
in
now
is
me
ing that
my
all
My
I
am
by others. In recollecting once-confidential
essential to
evant evolutionary trendings,
I
my
humanity
all
an adequate comprehension of
hope no one
being a traitor to
friends but to
have frequently been illumined
insights
rel-
make the mistake of thinkNot only am I being loyal to
will
friends.
—without whom there would be no
life.
reasons for writing this book are fourfold:
(A) Because this
am
I
convinced that
book has
my
(B) Because of
of extinction
always to
promptly (C) Because
human knowledge by human survival.
others of what
essential to
driving conviction that
only the truth, and
right
am
is
all
of humanity
each one of us does not dare,
if
tell
—
I
to say
now and
is
in peril
henceforth,
the truth, and to do so
all
now.
convinced that humanity's
fitness for
continuance in
the cosmic scheme no longer depends on the validity of political, religious,
economic, or social organizations, which altogether here-
tofore have been
assumed
(D) Because, contrary to (C),
now depends (1) (2)
(3)
The The The
(4)
I
am
many.
convinced that
human
continuance
entirely upon:
intuitive
wisdom of each and every
individual.
individual's comprehensive informedness. individual's integrity of speaking
individual's
The
to represent the
own
within-self-intuited
and acting only on the
and reasoned
initiative.
individual's joining action with others, as motivated only
by the individually conceived consequences of so doing. (5)
The
individual's never-joining action with others, as motivated
only by crowd-engendered emotionalism, or by a sense of the
crowd's power to overwhelm, or in fear of holding to the course indicated by one's
We ing
is
ferent.
all
see things differently. Seeing
sensing. Smelling
And
our
circumstances.
is
sensing.
own is
intellectual convictions.
sensing. Hearing
What each
different senses are differently effective
Our
different sensings of
is
sensing.
faculties.
The
is dif-
under ever-differing
individual brains coordinatingly integrate
our different
Touch-
of us happens to sense
all
the ever-
integrated product of our
multifold individual sensings produces awareness. Only through our sensings are
we aware
of the complementary "otherness."
Awareness of the "otherness"
is
information.
The complex of successively
experienced informations produces interweaving episodes
—and the complex
of special-case-episode-interweavings produces the scenario that our brain's
memory banks identify as our individual being's "life." The way only-our-own, individual integrity of being
responds spontane-
Critical Path
xii
own exclusive sensing of any given otherness episode is mean when I use the word feeling: How do I feel about life? How feel about it now? and again now? Our feelings often change. What
ously only to our
what
I
do
I
do
I feel
.
One
that
.
.
need to do about what
I
am
I
feeling?
many wonderful human beings that I've known who has afhuman beings in a markedly inspiring degree was e. e. cum-
of the
fected other
mings, the poet.
He
"A
wrote a piece called
which
Poet's Advice,"
I feel
elucidates
years ago at age thirty-two, jettisoned
"little I," fifty-three
all
that
I
why had
ever been taught to believe and proceeded thereafter to reason and act only
on the basis of why, acting
entirely
on
my own
initiative, I
operating only on behalf of all humanity
human
life
on our
sought to discover what,
—
in attempting to
planet,
if
any-
produce sustain-
and metaphysical advancement of the
ingly favorable physical
able by the individual,
also explains
by a penniless, unknown individual
thing, can be effectively accomplished
all
Cummings's poem
direct personal experience.
which omnihuman advantaging
integrity of
task, attempt-
inherently impossible of accomplishment by any
is
nation, private enterprise, religion, or other multipeopled, bias-fostering
combination thereof.
A POETS ADVICE A poet is somebody who feels, and who expresses his feelings through words. This
A
may sound
lot
easy. It isn't.
of people think or believe or
know
And
believing or knowing; not feeling.
they
poetry
feel
thinking or —but —not knowing or bethat's
feeling
is
lieving or thinking.
Almost anybody can learn
man
being can be taught to
lieve or
you know, you're a
to think or believe or
feel.
lot
Why?
know, but not a
single hu-
Because whenever you think or you be-
of other people: but the
moment you
feel,
you're
nobody-but-yourself.
—
To be nobody-but-yourself in a world which is doing its best, night and make you everybody else means to fight the hardest battle which any
day, to
—
human being can fight; and never stop fighting. As for expressing nobody-but-yourself in words, that means working just a little harder than anybody who isn't a poet can possibly imagine. Why? Because nothing
do exactly If,
at the
feeling,
is
quite as easy as using
this nearly all of the
you
end of your
first
time
words
like
somebody
—and whenever we do
it,
ten or fifteen years of fighting
find you've written
one
line
else.
we
We
all
of us
are not poets.
and working and
of one poem, you'll be very lucky
in-
deed.
And
so
my
young people who wish to become poets is: do someunless you're not only willto blow up the world die. you till and fight work and
advice to
thing easy, like learning ing,
but glad, to
feel
all
how
—
Foreword
Does It's
Or
xiii
this
sound dismal?
the most wonderful
so
It isn't. life
on
earth.
I feel.
—
cummings
e. e.
Exploring, experiencing, feeling, and strictly
and only on
my
—
to the best of
individual intuition,
I
my
ability
became impelled
—acting
to write this
book.
I'm not claiming to be a poet or that
this
book
mings well enough to be confident that he would ten
it.
is
poetry, but
feel
I
happy that
knew cumI
had
writ-
Digitized by the Internet Archive in
2012
http://archive.org/details/criticalpathOOfull
CRITICAL PATH
INTRODUCTION:
Twilight of the World's Power Structures Humanity
moving ever deeper
is
into crisis
—a
crisis
without prec-
edent. First,
it is
a crisis brought about by cosmic evolution irrevocably intent
upon completely transforming omnidisintegrated humanity from a complex of around-the-world, remotely-deployed-from-one-another, differently colored, differently credoed, differently cultured, differently communicating,
and
differently
competing
sively interconsiderate,
Second,
we
entities into a
completely integrated, comprehen-
harmonious whole.
are in an unprecedented crisis because cosmic evolution
irrevocably intent
is
also
upon making omni-integrated humanity omnisuccessful,
able to live sustainingly at an unprecedentedly higher standard of living for
Earthians than has ever been experienced by any; able to live entirely
all
within
its
cosmic-energy income instead of spending
ings account
(i.e.,
the fossil fuels) or spending
equipment account
(i.e.,
atomic energy)
its
its
cosmic-energy sav-
cosmic-capital plant and
—the atoms with which our Space—a spending
biosphere are structured and equipped
ship Earth and
its
no
than burning your house-and-home to keep the family
less illo...