Six Sigma Project Report Template Quick Reference

General Requirements for Report:  Three to six single-spaced pages (including tables and figures).  Your report must follow the DMAIC outline and meet all minimum requirements identified below. Note: we recognize the content, length and emphasis of individual sections within your reports will vary based on your actual findings and writing styles.

Required Section Content The headings below must be included in your report. The rest of the text below refers to content that you either must include in your report or may include. For more detailed explanation and examples of each of these sections, refer to the Six Sigma Project Report Template. 1. Cover Page: Title, Name, E-mail, Company and Date of Submittal. In addition, students must identify a Project Mentor in their company (Supervisor, Quality manager, Six Sigma Black belt) who can authenticate and validate the findings in the report.

accomplish this task by including at least one table, graph, or diagram within the main body of the text. (e.g., include a Pareto chart, cause-and-effect diagram, scatter plot, etc. Note: Paste Excel graphs/tables as pictures into report to reduce file size. After copying the graph, click Edit>Paste special and select "Picture"). b. Note: We encourage the use of additional data analysis tools.

2. Executive Summary (Standalone document 1 page maximum) a. Problem Statement b. Critical tools/ methods used in Analysis c. Major results / findings d. Conclusions & Recommendations

6. Recommendations: The Improve Phase a. Discussion of alternative solutions considered (only if applicable). b. Recommended Solution or Action Plan

3. Improvement Opportunity: The Define Phase a. Definition of the problem (restatement of problem and project scope). b. Key measures used in evaluating success. c. Impact on key business issues.

7. The Control Phase a. Discuss suggested method of control to maintain your recommended solution (e.g., new process tracking system, control plan, error detection system).

4. Performance: The Measure Phase a. Identification of key input and output variables (KPIV's and KPOV's) b. Quantify current performance level c. Identify target performance level

8. Conclusion a. Restate quantified project results or at least projected results. Note: if your results are incomplete or sensitive to your company, please try to discuss results in relative terms. (e.g., a 20% reduction in error rates or a 10% cost savings). b. Summarize recommendations and solutions

5. Analysis & Findings: The Analyze Phase a. You must show evidence of the use of at least one data analysis tool/ method discussed in this course. You should

1

9. Appendix (Optional) You may include additional information for reference here. Note: We expect the major figures used in your analysis to be included in the main body of your report.

2

Six Sigma Project Report Template On-Line Green Belt Program at Arizona State University Overview  The following template presents a guideline for preparing a Six Sigma written project report. Your report should be similar in organization and contain similar headings. Subheadings and length of each section will obviously vary based on your findings and writing style.  The italic text in this template is instructional and should not be written in the actual report. The nonitalic text presents examples of the kinds of text you might or should include in your report. The example in this template is based on a case study from Six Sigma: The Breakthrough Management Strategy Revolutionizing the World's Top Corporations by Mikel Harry, Ph.D. and Richard Schroeder, 2000. Note that some of the example text appears on separate pages within the template.  Some of the information in the examples in this template is vague because of lack of source information. However, your report should be as specific as possible, including details and data that reflect your case.  The information in your report should follow the Six-Sigma Problem Solving Methodology DMAIC. This includes a description of the project, key points in the problem-solving process, and detailed support for your conclusions and any recommendations. The final report should be approximately 3-6 single-spaced pages, including tables and figures.  Feel free to use the heading style formats in these guidelines for the headings and subheadings in your written report.  We recognize that some information contained in this template is repetitive across sections. However, since different audiences will read your report to various degrees of depth, we believe that it is essential to repeat certain information. Ultimately, we want you to write a high quality-professional report that has sufficient detail to help other Six Sigma professional utilize and build upon your project findings.  For technical questions, feel free to contact your ASU Course Moderator.

1

Title Stating Subject and Purpose of Report

Submitted to: Name, Title Department/Organization Address (optional)

Prepared by: Name, Title Department/Organization Address (optional) Authentication: Name, Title, E-mail Date Submitted

2

Example:

Damage-Free Delivery Project: Solving Problems with Products Damaged in Shipping

Submitted to: Name Unknown, CEO Polymerland, A Division of GE Plastics

Prepared by: Name Unknown, Champion Also Name Unknown, Black Belt Polymerland, A Division of GE Plastics

December 20, 1997

3

Note: Do not put a page number on your title page. Begin numbering the pages with the Executive Summary. Executive Summary 

The Executive Summary presents the major information the report contains. Its readers are typically managers who need a broad understanding of the project and how it fits into a coherent whole. These readers do not need or want a detailed understanding of the various steps taken to complete your project. Therefore, the Executive Summary allows readers to learn the gist of the report without reading the entire document, to determine whether the report is relevant to their needs, or to get an overview before focusing on the details. We consider writing a concise (one-page or less) and comprehensive executive summary a critical element of an effective Six Sigma project.

The Executive Summary should include:

     

Problem Statement Scope Methods (if appropriate) Major results, including key supporting information Conclusions Recommendations (if appropriate)

An Executive Summary is not used as an introduction to the report, but is an independent, entirely condensed version–the report in miniature. It generally has the following characteristics:



Length of 1 page for reports fewer than 10 pages. For longer reports, maximum length is often 5 to10% of the length of the full report.



The Executive Summary should include no terms, abbreviations, or symbols unfamiliar to the reader. Readers should understand the content of the Executive Summary without reading the rest of the report.

4

Example: Executive Summary On July 1, 1997 a representative of one of our largest and most lucrative customers told us he was considering taking his business elsewhere because too many of our products had been arriving contaminated. We immediately began examining the problem and determined that between January 1, 1997 and June 30, 1997, Polymerland delivered 275,501,855 pounds of products to our customers, 176,381 pounds of which were contaminated. That is, 176,381 pounds of products were damaged during shipping and then delivered to customers. We immediately told our dissatisfied customer that we would examine the problem closely and correct the situation. Next, we formed a team to determine the cause of the problem and implement a solution. Our team used the Six Sigma Strategy to examine the processes used in shipping our products and identify ways to optimize these processes. Following the Six Sigma Strategy, we determined that two of our warehouses, Maumee and Piedmont, produced the highest number of defects, while our Brampton warehouse was operating at Six Sigma levels. In the Maumee and Piedmont warehouses, 95% of the damaged boxes had two punctures at the base of one side of the box, causing leakage. In addition, we determined that 87% of the damage occurred when the boxes were moved with a forklift. We also discovered a relationship between how the product was packaged and the type of damage done. Bags were most likely to be damaged if they were scraped across the floor, but boxes were more likely to be damaged when handled by a forklift operator. We concluded there was a strong correlation between the damaged products and the use of a forklift to move them. However, the reason for the correlation was unclear since the Brampton warehouse, which was working at Six Sigma, also transported the product using forklifts. Therefore, we then looked at the forklift drivers in the Maumee, Piedmont, and Brampton warehouses and discovered that the forklift drivers in Brampton were more experienced than the drivers in Maumee and Piedmont. From this information, we determined that two factors contributed to the number of damaged products customers received: whether the product was moved in the warehouse by forklift and whether the forklift operator was experienced at operating a forklift. To reduce or eliminate the number of boxes damaged in our warehouses, we considered the following alternatives:  Hire more experienced forklift operators for the Maumee and Piedmont plants. However, this would incur significant costs and may not be possible.  Require extensive training for the forklift operators in the Maumee and Piedmont warehouses. This solution would also be expensive and would not guarantee fewer damaged products.  Install shorter forks on all forklifts used in Polymerland warehouses. This installation would cost $350 per forklift. Beginning in December 1997, all Polymerland warehouses replaced the 42-inch forks with 36inch forks on their forklifts. Since this change, the number of damaged products delivered to our customers has reduced significantly. 5

1.0 Introduction (Not: optional as a separate section. You may include the following in the Define Phase Section) Announce the subject of the report (the problem the report addresses), the task performed in response to the problem, and the purpose of the report. Note: The purpose of the report is not the purpose of the project. The purpose of the report is to present information that will enable readers to understand a subject, to affect readers' attitudes toward some subject, or to enable readers to carry out a task. The introduction can also explain key terms used in the report (if appropriate); announce the most significant findings, including key support; announce the conclusions and, if appropriate, recommendations; and forecast the content and organization of the report (optional). Current practice supports including this information to give readers a viewpoint from which to interpret the data the report presents and to provide tools to help readers navigate through the text. Note: some of the information in an introduction may simply repeat from the executive summary. Example: 1.0 Introduction On July 1, 1997 a representative of one of our most lucrative customers told us he was unhappy that many of our products had been arriving contaminated. He complained that he had to use his company's time and resources to ship the defective products back to Polymerland for replacement, and said he would take his business elsewhere if the situation didn't improve. We immediately told him that we would correct the problem to ensure he receives only high quality products from Polymerland. Next, we formed a team chartered with using Six Sigma strategy to determine the cause of the problem and implement a solution. The purpose of this report is to present the results of our team's problem-solving process and explain the solution we adopted. Following the Six Sigma problem-solving strategy, we concluded that two factors contributed to the number of damaged products customers received: whether the product was moved in Polymerland's warehouse by forklift and whether the forklift operator was experienced at operating a forklift. In addition, we determined that the specific damage was caused by the forks on the forklift. The forks protruded six to nine inches out from under the box, so that as the fork was fully inserted under the box being retrieved, the box behind it was punctured. To reduce or eliminate the number of boxes damaged in our warehouses, we considered several alternatives and decided to install shorter forks on all forklifts used in Polymerland warehouses. Therefore, beginning in December 1997, all Polymerland warehouses replaced the 42-inch forks with 36-inch forks for $350 per forklift. This report presents a detailed explanation of the steps we followed using the six sigma problemsolving strategy—define, measure, analyze, improve, and control—to determine why our customer was receiving damaged products and to change the faulty step in our shipping process, ensuring these defects do not happen again. 6

2.0 The Improvement Opportunity: The Define Phase Discuss the problem you examined. Explain how you identified your specific Six Sigma project. You might possibly Integrate visuals and data summaries with text using tools such as a Pareto chart or a summary report of current performance for either a manufacturing or transactional process. Some topics that should be included are:  Discussion of the problem addressed in your project.  Discussion of project scope, (e.g., if you chose to limit your project to a particular part of a larger problem statement or project due to timing constraints or span of influence).  Identification of key measures that you used to evaluate the success of your project (examples: DPM, DPMO, process yield, error rates, processing or order-filling time, machine cycle time, # complaints, etc.)  Discussion of impact on your project on key business indicators (e.g., the impact of your project to your company or customer). 3.0 Performance: The Measure Phase Analyze current performance levels and identify goals you hope to achieve. Integrate visuals presenting flow charts, cause-and-effect diagrams, process control charts, sample data sets, summary statistics, and/or run charts. You also might include visuals presenting results from process capability studies, measurement system analyses, and process audits. (Note: Do not present long, bulky data sets in the main report, place them in appendices to the report.) Identify the Key Product Output Variables (KPOV’s) examined and/or list potential Key Product Input Variables (KPIV’s). The following information should be clearly identified:

  



Current Performance Levels (Required) - identify the current state of your process performance metric(s) (e.g., 25% defect rate, 35,000 DPM, 15 days to complete order). Data Collection (Optional). Briefly discuss the data collected in your project. Include a listing of KPOV’s and KPIV’s examined. Measurement System Analysis (Optional). Discuss the validity of your measurement data either qualitatively or quantitatively using tools such as a Gage Repeatability and Reproducibility Study, and Gage Accuracy Study. Identify the strengths and limitations of your data collection method. Target Performance Levels (Required) - identify the desired performance levels or improvement amounts of your performance metric (e.g., Reduce DPM level from 35,000 to 3.4, or reduce time-to-delivery by 50%).

Examples of Current and Target Performance Level Assessments:  Our current process requires 15 days to complete a special order and we wish to reduce this time to less than 7 days. Or,  We currently are operating at 10,000 DPMs and we wish to reduce this level to less than 3.4 DPMs.

7

Other information that you may want to include in this section are:  Flow chart, SIPOC Diagram or Current State Map of the process. This is highly recommended, as they are a great visual aid and allow other readers to immediately comprehend the process basics.  Visuals presenting results of process capability studies or process audits.  Process Control Charts or Run Charts.  Cause and Effect Diagrams. 4.0 Analysis and Interpretation: The Analyze Phase Analyze gaps between current performance and target performance levels, explaining possible sources of variation. Include subtopics and subheadings that reflect your case. Include visuals supporting analysis from using stratification analysis, regression analysis, correlation analysis, etc. In this section, you should discuss the relationships between your KPIVs and KPOVs. For example, you should discuss those variables that have a direct cause-and-effect relationship or those input variable settings (or range of settings) in which your KPOV(s) are robust. Information that must be included in this section include:  You must demonstrate your understanding of course concepts and tools by showing evidence of the use of at least one data analysis tool/ method discussed in this course. You should support this requirement by including at least one table, graps, or diagram within the main body of the text. (e.g., include a Pareto chart, stratification analysis table, cause-and-effect diagram, scatter plot, correlation analysis, process control chart, measurement systems analysis (gage R&R) report, etc.). (Note: these tables and figures must be integrated into the main body of your report; additional background material may be included in the appendix).  Note: We encourage the use of additional data analysis tools and may request resubmittal of a project to include additional analysis if appropriate.

Note: Some of the analysis tools you use in the Analyze Phase may also apply in the Improve Phase. You may discuss the use of Six Sigma problem solving and analysis tools in either the Analyze Phase or the Improve Phase as appropriate to present your argument.

5.0 Recommendation: The Improve Phase Identify alternative ways to improve performance. Try to evaluate how well alternatives will be able to meet target performance goals. Specify criteria for choosing a course of action. Present conclusions regarding alternatives and identify recommended solution. Consider presenting the material in the following subtopics with appropriate second-level headings.  

Alternative Solutions Considered Recommended Solution 8

6.0 The Control Phase Identify the method of control such as process control charts, poke-yoke devices, process monitoring/ tracking systems, and standardized work. If data is available, demonstrate how your solution has achieved the desired results, where possible. Comment: We realize that it might not be possible to include data that supports that an actual improvement was made to the process because of the project time constraints. If this is the case, please at least discuss the potential benefits of implementing your recommendations.

7.0 Conclusion Briefly restate the problem addressed, the process followed to reach a solution, and the chosen solution. List the potential benefits to the chosen solution. Note: if your results or recommendations are incomplete or sensitive to your company, please try to discuss potential benefits in relative terms. (e.g., a 20% reduction in error rates or a 10% cost savings). If appropriate, explain any further action to be taken, including the responsible team members and schedule. Example: 7.0 Conclusion When one of our most lucrative customers complained about receiving defective Polymerland products, we immediately began working toward a solution. Using Six Sigma strategy, we determined the length of the forks on our forklifts was causing the forks to puncture the boxes during handl...