CADASTRAL SURVEYGLS 310STANDARD TRAVERSE REPORTPREPARED FOR: MADAM NOORAZWANI MOHD RAZIDATE OF SUBMISSION: 21 st DECEMBER 2020CLASS: RAP1205BPREPARED BY MATRICS NUMBERAZULAIDIL FAHMI BIN AZNAM 2018283944MOHAMAD AMIRUN HAKIMI BIN MOHD AZIRUN 2018258744AHMAD ZHAFRI BIN MOHD RAMLE 2018408084MUHAMAD ZUL...
CADASTRAL SURVEY GLS 310 STANDARD TRAVERSE REPORT PREPARED FOR: MADAM NOORAZWANI MOHD RAZI DATE OF SUBMISSION: 21st DECEMBER 2020 CLASS: RAP1205B
PREPARED BY
MATRICS NUMBER
AZULAIDIL FAHMI BIN AZNAM
2018283944
MOHAMAD AMIRUN HAKIMI BIN MOHD AZIRUN
2018258744
AHMAD ZHAFRI BIN MOHD RAMLE
2018408084
MUHAMAD ZULKARNAIN BIN MAJLAN
2018697888
WAN MOHAMAD FIKRIE BIN WAN AZIZ
201866558
FARID BIN MUNANDAR
2018675722
Table of Contents Introduction....................................................................................................................................1 Objective.........................................................................................................................................2 Methodology..................................................................................................................................2 Data Processing............................................................................................................................8 Result..............................................................................................................................................9 Comments....................................................................................................................................13 Conclusion...................................................................................................................................19
Introduction In brief, the form of land title given for stratified assets is a strata title. Strata title is the separation into parcels of buildings or property and the issuing of different names for each parcel called strata titles. Besides, getting two or three storeys on alienated property owned in plots each to be held under a different Strata Title as one lot under the Final Title. Title to the property on which the house sits is maintained until the building is subdivided, although it will be registered under an entity named the Management Corporation (MC) that automatically operates as soon as the titles to the parcels are registered. It is necessary to have the strata title for it acts as evidence of possession of the apartment/condo and is used as a loan fee instrument for banks. Furthermore, the issuance of the strata title would initiate the establishment of the management corporation (MC) by apartment/condo owners. It acts as confirmation of the unit's built-up region and the distribution of your stake in the overall gross units. This allows for the Management Committee to determine the repair fees. Moreover, having a strata title can prevent complications should the developer come under liquidation or become insolvent. Concepts of Strata Title
To give title to units or parcel in a building.
The proposed Strata Plan, comprising of the Site and Storey Plan, is the basis for the proposed construction subdivision.
The Certified Strata Plan is planned, accepted, recorded and registered as a Strata Title after approval.
Objective The objective of the project is to get to know and to measure its bearing and distance match according to its plan. The types of measurement we should do in this project are :-
Re-survey of lot boundaries
Detailed Survey (to determine the location of main and provisional blocks)
Measurement of each storey's height
Measurement of horizontal parcel lengths, accessory parcels and shared property Survey of parcels of land under the strata method.
Methodology Reconnaissance
Reconnaissance is very important to get the general view and to know the real topographical surface of the survey site.
To get the overall picture of the area to be survey can be done smoothly
To identify and obstacles.
To locate traversing stations.
Horizontal Angle Measurement
Standard traverse -Standard traverse consist a series of traverses high accuracy. The linear accuracy in 1:25000 and the angular is 1.5" per station. The purpose of standard traverse is to density secondary control point and as a control network for cadastral survey. Beside that it used for mapping and geodetic control network.
Azimuth control
The azimuth controls get by doing solar observation.
The angular check by solar observation at intervals not exceeding 25 stations.
The true bearing form solar observation was compared between Global Positioning System (GPS).
CRM
According to survey circular 2009, part of survey datum is two new CRM with distance not less than 30 meter.
The observation can be in static method with condition that both point must observe on same time.
The observation takes about 40 minutes except the master set observation where the observation was about an hour.
Adjustment
Tolerance between internal and external angle is 5".
Applied M correction.
Final bearing for each line to be computed.
Angular and Linear Misclosure
Angular 1.5" per station.
Linear Misclosure 1:25000
Standard traverse equipment Equipment
Usage Total station Total station is the most important equipment in survey.
It is used in traversing and detail survey.
Can be obtain bearings and distances almost accurate using this equipment.
To get the straight line of sight.
Prism As reflector unit where it will give the information about bearing and distance during the observation.
Tripod To hold the total station prism.
To make sure total station or prism correctly positioned on the point and level.
Hammer Used to knock the nail at the hard surface.
Nail
Used to mark rhe station at the hard surface.
Solar observation equipment Equipment
Usage Total station Total station is the most important equipment in survey. It is used in traversing and detail survey. Can be obtain bearings and distances almost accurate using this equipment. To get the straight line of sight. Tripod
Tripod
To hold the total station prism. To make sure total station or prism correctly positioned on the point and level.
To hold the total station prism. To make sure total station or prism correctly positioned on the point and level.
Sunglasses Used with total station when during solar observation and ro prevent eyes from directly contact with ultraviolet radiation.
Procedure of work
Preparation
Reconnaissance
Field work
DFT
Traversing
Solar observation
Data Processing
AutoCAD
Preparation
Reconnaissance -Before starting the survey, reconnaissance is important to know and identified the topographical detail the place of the area. Besides that, it needs to be done first to avoid any obstacles during field work and to make sure field work done smoothly.
Fieldwork
DFT -The differential field test should be carried out at the start of every new survey job to make sure that the instrument to be used in a good condition. It is important to ascertain if rhe EDM or total station is unacceptable working order.
Procedure of traversing 1. Start from known point line (CRM for station 1) 2. Set the instrument at station 2 and set 0d00'15" in circle left and target to station CRM1. 3. Observe to station 1. 4. Take the horizontal and vertical angle's reading of station 1. 5. Take the distance reading of station 2 to station 1. 6. At station 2 and set 180d00'15" in circle right and target to station CRM1 and observe to station 1. 7. Take the horizontal and vertical angle reading of station 1. 8. Take the distance reading of station 2 to 1.. 9. Repeat the same step for station 3,4,5,6,7,8 and 9. Procedure of solar observation 1. Put the total station on 2 and prism on CRM1. 2. The focus on prism and set RO value. 3. Make sure that total station is in face left.
4. Total station was set to RO then click ok. The bearing was recorded automatically then target to the sun. 5. Using face left, the sun position was observed on crosshair in the total station then click ok. 6. And then change to face right click ok. 7. Close to RO back. Then click save. 8. Repeat the same step for another set.
Data Processing Station
Bearing/Angle
2
Face Left 00 00 10
Face Right 180 00 10
4
141 57 10
321 57 10
Mean Angle
Bearing
141 57 00
182 42 20
3
For mean angle calculation Circle left = 00 00 10 – 141 57 10 = 141 57 00
For bearing calculation = back bearing (3-2) + mean angle = 182 42 20 + 141 57 00 = 324 39 20
324 39 20
Result
SET 2
Azimuth for line 1-2 = 356 09 20 Distance= 52.018m
Coordinates
Station 1 (CRM) N 53670.231, W 39611.362 Station 7 (CRM) N 53819.061, W 39421.856
STATION
BEARING/ANGLE
Mean Angle
DISTANCE
FINAL DISTANCE
(m)
(m)
186 33 00
60.941
60.941
173 27 00
52.018
52.018
141 57 00
47.147
47.147
218 03 00
60.941
60.941
305 29 10
116.706
116.706
54 30 50
47.147
47.147
177 53 20
34.602
34.602
o
( 1
FACE LEFT (o ‘ ‘’) 00 00 15
FACE RIGHT (o ‘ ‘’) 180 00 15
3
186 33 15
6 33 15
3
90 00 15
270 00 15
‘ ‘’)
2
2 1
263 27 15
83 27 15
2
00 00 10
180 00 10
4
141 57 10
321 57 10
4
90 00 10
270 00 10
2
308 03 10
128 03 10
3
00 00 15
180 00 15
5
305 29 25
125 29 25
5
90 00 15
270 00 15
3
144 31 05
324 31 05
4
00 00 20
180 00 20
6
177 53 40
357 53 40
3
3
4
4
5
6
90 00 20
270 00 20
182 06 40
116.706
116.706
4 5
272 07 00 00 00 15
92 07 00 180 00 15
184 50 10
66.178
66.178
7 7
184 50 25 90 00 15
4 50 25 270 00 15
175 09 50
34.602
34.602
5
265 10 05
85 10 05
5
6
6
STATION
BEARING/ANGLE
Mean Angle o
( 1
FACE LEFT (o ‘ ‘’) 00 00 15
FACE RIGHT (o ‘ ‘’) 180 00 15
3
186 33 15
6 33 15
3
90 00 15
270 00 15
BEARING
FINAL BEARING
176 09 20
2 42 20
‘ ‘’)
186 33 00
2 2 42 20 173 27 00
2 42 20
141 57 00
182 42 20
218 03 00
324 39 20
176 09 20
2 1
263 27 15
83 27 15
2
00 00 10
180 00 10
176 09 20
4
141 57 10
321 57 10
4
90 00 10
270 00 10
2
308 03 10
128 03 10
3
00 00 15
180 00 15
305 29 10
144 39 20
90 08 30
5 5
305 29 25 90 00 15
125 29 25 270 00 15
54 30 50
90 08 30 90 08 30
144 39 20
3
144 31 05
324 31 05
4
00 00 20
180 00 20
6
177 53 40
357 53 40
324 39 20
3 324 39 20 182 42 20
3 182 42 20
4
4 144 39 20 177 53 20
270 08 30
88 01 50
5
6
90 00 20
270 00 20
4 5
272 07 00 00 00 15
92 07 00 180 00 15
7
184 50 25
4 50 25
7
90 00 15
270 00 15
88 01 50
182 06 40
88 01 50
270 08 30
184 50 10
270 08 30 268 01 50
92 52 00
175 09 50
92 52 00
5
6 92 52 00 268 01 50
6 5
265 10 05
85 10 05
268 01 50
COORDINATE CALCULATION station
bearing
distance
latit
depart
2 3 4 5 6 7
356 09 20 2 42 20 324 39 20 90 08 30 88 01 50 92 52 00
52.018 60.941 47.147 116.706 34.602 66.178
51.900 60.873 38.457 -0.289 1.189 -3.310
-3.488 2.877 -27.274 116.706 34.582 66.095
1
CRM7 N 53819.061, W 39421.856 New N 53819.051, W 39421.864 Diff N=0.010
W=0.008
LINEAR MISCLOSE 377.592/(√(0.010)2+(0.008)2)= 29484.98155 / 1:30 000
N/S 53670.231 53722.131 53783.004 53821.461 53821.172 53822.361 53819.051
E/W -39611.362 -39614.850 -39611.973 -39639.247 -39522.541 -39487.959 -39421.864
SKETCH SET 2
Comments
AZULAIDIL FAHMI BIN AZNAM (2018283944) Due to Covid-19 issue, we were enforced to stay at home and learned through online platform Even though we were required to stay at home during this semester, the commitment from our lecturer had gave us basic knowledge for us on how to perform observation at site theoretically. Not only is it important for us to understand how the procedure works but it is also important for us to understand how we were able to acquire results. Secondly, team building. Communication during this pandemic issue surely is more difficult than a normal face-to-face method. We might have different understanding on certain issues. However, we managed to learn on how to discuss efficiently via online. In this era of technology, there are way too many platforms to do discussion We somehow work together to accomplish the task based on requirement needed. Generally, my members had shown decent commitments and responsible with the work given. There were times where we had undergone some confusions on certain issues especially during the process in Strata Title Survey report. However, in the end we were able to accomplish the task in according to the objectives
MUHAMAD ZULKARNAIN BIN MAJLAN (2018697888) Thank to Allah s.w.t finally our group managed to finish this Cadastral Survey task 1 either at the class or in preparing the report. Also, a lot of thanks to my lecturer for giving me some information how to do this task and finishing the report. Firstly, my group getting familiar with the icons in standard traverse calculation, we found that using the standard traverse is done by observing horizontal distance, horizontal angle, solar observation and GPS observation. The standard traverse observes by angle method which is define the interior and exterior angle and the total should be 360 degree. The solar observation is needed for the azimuth control at the starting bearing and the correction for the traverse. At last, we must know the procedure of standard traverse before going to any advance method as a surveyor.
AHMAD ZHAFRI BIN MOHD RAMLE (2018408084) Honestly, from this task, we had learned many new things. We know the difference of the control traverse and standard traverse. And also know how to do the standard traverse and booking. Due to the covid-19 pandemic that is hitting the world now, we as student semester 5 cannot continue the survey job at the university but this is not a problem for us not to complete the standard traverse report. During the survey work done, we had big problem when we just need to continue this based on our experience while doing survey jobs during the last semesters. I’m lucky to be in my group because they can work together even though now we cannot face to face to discuss about survey jobs and many misunderstandings between us. But it is not big trouble. However, that is not a problem for us because our lecturer, Madam Wani, also helped us a lot. Their hardworking is greatly appreciate. Thank you guys for giving for our group a commitment for this first report.
MOHAMAD AMIRUN HAKIMI BIN MOHD AZIRUN (2018258744) For my opinion, in this assignment we learn a lot of new things that we can use in future. Even we can't do this assignment face to face with our friends, we still can finish this assignment. In this assignment, I learn how to differentiate between control traverse and standard traverse. Then, when we do this assignment, we lack of communication because of pandemic covid-19, then we need to make a group WhatsApp to have a discussion. Then, I am really happy because all of my group give a good teamwork to finish this assignment. Even though we have a problem, we still can manage it properly with my teammates. Finally, I am really happy to have a very good teammates to do this assignment and can finish at the specified time and can learn how to do a calculation and work in group.
FARID BIN MUNANDAR 2018675722 First of all, I would like to thank our lecturer, Madam Wani for her guidance and help throughout the task. Due to online learning, it was quite challenging because we didn’t get to experience doing the task on field. Every discussion and work progress are all via online. There was a problem where we don’t understand some part of the task. However, with excellent communication and teamwork between our group members, we manage to overcome each of the problems distinctively. Overall, I am very happy and comfortable to be in this group and I look forward to working with them again.
Wan Mohamad Fikrie Bin Wan Aziz (201866558) Overall, how I feel for this project is at first is I don’t understand anything about standard traverse, how to calculate mean angle, how to find bearing from angle but after we finished this project my knowledge about this task has improved. But I felt a little frustrated because we are doing this task online and we cannot have a practical at the field, however we still manage to finish the task and gain something new for ourselves. My teammate also play their own role and give their best to make sure this task was completely smooth. When there is a problem we have a discussion on WhatsApp and give feedback to the problem. All in all, I feel happy that this task was compl...