Spot Speed Study Lab Report (Level 1) PDF

Title Spot Speed Study Lab Report (Level 1)
Course Highway And Traffic Engineering
Institution Universiti Teknologi MARA
Pages 29
File Size 815.5 KB
File Type PDF
Total Downloads 741
Total Views 834

Summary

HIGHWAY & TRAFFIC LABORATORYECG5 64OPEN-ENDED LABFEB 2020 – JUN 2020TITLE OF EXPERIMENT : SPOT SPEED STUDYDATE OF EXPERIMENT : 04/03/GROUP : EC2206 C4AGROUP MEMBERS 1. AINATUL-FATIMA BINTI MD MUROZI(2018438002)2. FATIN ARIFA BINTI MANSOR(2018264884)3. NABILAH BINTI MD ZIN(2018694072)4. NURFA...


Description

HIGHWAY & TRAFFIC LABORATORY ECG564 OPEN-ENDED LAB FEB 2020 – JUN 2020 TITLE OF EXPERIMENT

: SPOT SPEED STUDY

DATE OF EXPERIMENT

: 04/03/2020

GROUP

: EC2206 C4A

GROUP MEMBERS

1. AINATUL-FATIMA BINTI MD MUROZI (2018438002) 2. FATIN ARIFA BINTI MANSOR (2018264884) 3. NABILAH BINTI MD ZIN (2018694072) 4. NURFAIZA ADRINA BINTI AHMAD KHIR (2018693872) 5. SITI AISYAH BINTI ABD MALIK (2018402684)

LECTURER

: WARDATI BINTI HASHIM

LEVEL OF OPENESS

:

1

MARKS

COMMENTS

INTRODUCTION

CO4 PO4

OBJECTIVE(S)

CO4 PO4

METHODOLOGY

CO4 PO4

RESULTS

CO4 PO4

2

4

6

8

10

DISCUSSION

CO4 PO4

2

4

6

8

10

CONCLUSION

CO4 PO4

2

4

6

8

10

ORGANIZATION

CO4 PO4

2

4

6

8

10

TOTAL MARKS 0

Table of Contents INTRODUCTION ................................................................................................ 2 OBJECTIVE......................................................................................................... 2 THEORETICAL BACKGROUND.................................................................... 2 PROBLEM STATEMENT ................................................................................. 3 APPARATUS ....................................................................................................... 3 METHODOLOGY............................................................................................3-4 RESULTS ........................................................................................................5-13 DATA ANALYSIS .......................................................................................14- 24 DISCUSSION ................................................................................................25-26 CONCLUSION................................................................................................... 27 REFERENCES ....................................................................................................... APPENDIX ............................................................................................................

1

INTRODUCTION In this experiment, the students are required to conduct a spot speed study at the selected area by recording the speeds of sample vehicle in order to estimate the distribution of speeds of vehicles. Level of openness for this experiment is level 1 laboratory activity where the problems and ways & means are provided to the students.

OBJECTIVES The objectives of the study are: a) To establish the speed distribution of a traffic stream at a specific site or called as basic speed data. b) To determine vehicle speed percentiles via speed trend analysis, which are useful in speed related decision making.

THEORETICAL BACKGROUND Spot speed is the instantaneous speed of a vehicle at a specified location. Spot speed study can be used to design the geometry of road like horizontal and vertical curves, super elevation and others. Location and size of signs, design of signals, safe speed, and speed zone determination, require the spot speed data. Spot speed studies also used to determine the speed distribution of a traffic stream at a specific location. The data gathered in spot speed studies are used to determine vehicle speed percentiles, which are useful in making many speed-related decisions. The spot speed data are gathered manually and automatically. The stopwatch method is the least expensive and least accurate because of a small sample size were taken over a relatively short period of time. compared to using radar gun. Study of speed characteristics is the most essential perquisite for any improvement of traffic facilities. The actual speed of vehicles over a particular route may fluctuate widely depending on several factors such as traffic condition, time, place, environment and driver.

2

PROBLEM STATEMENT Over speeding is one of the major causes of road accidents in Malaysia. Speed limits are implemented to prevent over speeding of vehicles. To determine whether the drivers of vehicles comply with the speed limit, spot speed studies are carried out to determine the speed of vehicles operating on the road.

APPARATUS ▪

Radar gun meter



Road measuring wheels



Stopwatch



Safety vest

METHODOLOGY

(MANUAL - STOPWATCH) 1. Necessary preparations such pens or pencils, radar meter spot study data forms and clipboards, radar meter was performed. Ensure all the equipment were in good conditions. Read instructions and procedure for the used radar gun. Backup battery, safety vests and others were obtained too. 2. Study location was decided, and the selected site should be straight and level of the road section that represents different traffic conditions. 3. The layout of the study area was sketched with the description of chosen reference points, position of observation, number of lanes and class of road. 4. Two (2) reference points was selected as Start and End point with a distance of 50 meters apart. 5. Two (2) station observers at Start and End point. 6. Observer at the starting point was gave a sign to observer at the end point to record the vehicle’s time travel form start point to the end point. 7. The other observer was recorded the plate registration number and vehicle classification of selected vehicle. 3

8. The speed of vehicles was determined by using speed formula, speed = distance/time (km/h).

(AUTOMATIC – RADAR GUN) 1. Necessary preparations such pens or pencils, radar meter spot study data forms and clipboards, radar meter was performed. Ensure all the equipment were in good conditions. Read instructions and procedure for the used radar gun. Backup battery, safety vests and others were obtained too. 2. Study location was decided and the selected site should be straight and level of the road section that represents different traffic conditions. 3. The layout of the study area was sketched with the description of chosen reference points, position of observation, number of lanes and class of road. 4. The sample was selected randomly, for examples the observer could record a speeding reading for every third vehicle or every fifth vehicle. 5. The radar meter was made as direct a line with oncoming traffic as possible, meaning to make it as close to the roadway as possible. 6. The vehicle speeds was observed for duration of one hour or until get 100 samples.

4

RESULTS Sheet No.

:1

Location

: Opposite to Dataran

Day

: Wednesday

Cendikiawan UiTM bustop in Shah Alam Time (start)

: 1500

Time (finish) : 1600

Weather

: Sunny day

No. Lanes

No

Speed

Vehicle Plate

:1

Vehicle Classification

Registration 1.

29

WYH8878

Car

2.

28

AKL9557

Car

3.

32

VBA6714

Car

4.

34

TBP9864

Car

5.

27

JDW46

Car

6.

25

BJG9931

Car

7.

45

RN5008

Car

8.

27

BNU5801

Car

9.

25

BNU1906

Car

10.

27

WNF4667

Car

11.

27

MCC5664

Car

12.

32

BPL7578

Car

13.

32

WC2637E

Car

14.

31

KV4609C

Car

15.

29

WQJ600

Car

16.

31

WTG9012

Car

17.

28

VBM2209

Car

18.

32

SK9191B

Car

19.

32

JPC2655

Car

20.

28

VDA1902

Car

21.

39

WLE9558

Car

22.

25

WTS710

Car

5

Sheet No.

: 1 (cont.)

Location

: Opposite to Dataran

Day

: Wednesday

Cendikiawan UiTM bustop in Shah Alam Time (start)

: 1500

Time (finish) : 1600

Weather

: Sunny day

No. Lanes

No

Speed

Vehicle Plate

:1

Vehicle Classification

Registration 23.

32

VAJ5652

Car

24.

35

WXA1960

Car

25.

27

WXN471

Car

26.

24

BPT5597

Car

27.

28

VBC7121

Car

28.

23

WC8233D

Car

29.

24

JSV5153

Car

30.

30

CDY9922

Car

31.

31

VDA102

Car

32.

21

WVS5714

Car

33.

32

WC7934D

Car

34.

34

WJF6921

Car

35.

33

AKK7697

Car

36.

29

WES3642

Car

37.

36

WER2063

Car

38.

41

WWP7482

Car

39.

35

JNV7511

Car

40.

33

WC9493S

Car

41.

40

BMW1272

Car

42.

36

WB9108H

Car

43.

39

JSU8972

Car

6

Sheet No.

: 1 (cont.)

Location

: Opposite to Dataran

Day

: Wednesday

Cendikiawan UiTM bustop in Shah Alam Time (start)

: 1500

Time (finish) : 1600

Weather

: Sunny day

No. Lanes

No

Speed

Vehicle Plate

:1

Vehicle Classification

Registration 44.

38

MDD6119

Car

45.

37

BME4144

Car

46.

24

WVQ5400

Car

47.

32

RAA6925

Car

48.

30

VDK9777

Car

49.

25

VCW1739

Car

50.

35

CAH53

Car

51.

42

VP3746

Car

52.

40

DB9998

Car

53.

19

VCY5857

Bus

54.

28

WSN2047

Car

55.

28

F4122

Car

56.

17

WC3035K

Bus

57.

30

VDJ7662

Car

58.

24

PNC4059

Car

59.

33

CDE5064

Car

60.

52

WXF108

Car

61.

39

VC8418

Car

62.

33

BHJ4345

Car

63.

28

WA894H

Car

64.

22

VDD2204

Car

7

Sheet No.

: 1 (cont.)

Location

: Opposite to Dataran

Day

: Wednesday

Cendikiawan UiTM bustop in Shah Alam Time (start)

: 1500

Time (finish) : 1600

Weather

: Sunny day

No. Lanes

No

Speed

Vehicle Plate

:1

Vehicle Classification

Registration 65.

29

WC8552N

Car

66.

28

WA4310N

Car

67.

29

BJW3418

Car

68.

35

DCU5346

Car

69.

34

PJT823

Car

70.

43

WJW5607

Car

71.

27

WSM3090

Car

72.

28

VCY4297

Car

73.

30

CCN4774

Car

74.

34

VBG233

Car

75.

31

WB2026F

Car

76.

43

TBA9220

Motorcycle

77.

30

TBY4828

Car

78.

39

WNV8396

Car

8

Sheet No.

:2

Location

: Opposite to Dataran

Day

: Wednesday

Cendikiawan UiTM bustop in Shah Alam

No

Time (start)

: 1500

Time (finish) : 1600

Weather

: Sunny day

Distance (m) : 50

Vehicle Plate

Vehicle

Registration

Classification

Time Start

Time Finish

Difference (s)

1.

WYH8878

Car

0

05.71

05.71

2.

AKL9557

Car

0

05.81

05.81

3.

VBA6714

Car

0

04.72

04.72

4.

TBP9864

Car

0

08.63

08.63

5.

JDW46

Car

0

04.69

04.69

6.

BJG9931

Car

04.69

11.94

07.25

7.

RN5008

Car

11.94

16.60

04.66

8.

BNU5801

Car

16.60

22.86

06.26

9.

BNU1906

Car

22.86

30.19

07.33

10.

WNF4667

Car

30.19

38.70

08.51

11.

MCC5664

Car

38.70

46.49

07.79

12.

BPL7578

Car

46.49

53.62

07.13

13.

WC2637E

Car

53.62

1:00.98

07.36

14.

KV4609C

Car

1:00.98

1:07.54

06.56

15.

WQJ600

Car

1:07.54

1:14.52

06.98

16.

WTG9012

Car

1:14.52

1:22.43

07.91

17.

VBM2209

Car

1:22.43

1:28.47

06.04

18.

SK9191B

Car

1:28.47

1:36.00

07.53

19.

JPC2655

Car

1:36.00

1:42.19

06.19

9

Sheet No.

: 2 (cont.)

Location

: Opposite to Dataran

Day

: Wednesday

Cendikiawan UiTM bustop in Shah Alam

No

Time (start)

: 1500

Time (finish) : 1600

Weather

: Sunny day

Distance (m) : 50

Vehicle Plate

Vehicle

Registration

Classification

Time Start

Time Finish

Difference (s)

20.

VDA1902

Car

1:42.19

1:49.44

07.25

21.

WLE9558

Car

1:49.44

1:55.85

06.41

22.

WTS710

Car

1:55.85

2:02.90

07.05

23.

VAJ5652

Car

2:02.90

2:08.92

06.02

24.

WXA1960

Car

2:08.92

2:13.34

04.42

25.

WXN471

Car

2:13.34

2:21.06

07.72

26.

BPT5597

Car

2:21.06

2:28.17

07.11

27.

VBC7121

Car

2:28.17

2:35.86

07.69

28.

WC8233D

Car

2:35.86

2:44.12

08.26

29.

JSV5153

Car

2:44.12

2:50.33

06.21

30.

CDY9922

Car

2:50.33

2:56.89

06.56

31.

VDA102

Car

2:56.89

3:02.71

05.82

32.

WVS5714

Car

3:02.71

3:09.20

06.50

33.

WC7934D

Car

3:09.20

3:15.23

06.03

34.

WJF6921

Car

3:15.23

3:19.91

04.68

35.

AKK7697

Car

3:19.91

3:26.26

06.35

36.

WES3642

Car

3:26.26

3:33.77

07.51

37.

WER2063

Car

3:33.77

3:39.63

05.86

38.

WWP7482

Car

3:39.63

3:44.73

05.10

10

Sheet No.

: 2 (cont.)

Location

: Opposite to Dataran

Day

: Wednesday

Cendikiawan UiTM bustop in Shah Alam

No

Time (start)

: 1500

Time (finish) : 1600

Weather

: Sunny day

Distance (m) : 50

Vehicle Plate

Vehicle

Registration

...


Similar Free PDFs