EVALUASI KINERJA POMPA SENTRIFUGAL MULTISTAGE 13-P-101 PADA UNIT ATMOSPHERIC RESIDUE HYDRODEMETALIZING PT PERTAMINA REFINERY UNIT VI BALONGAN LAPORAN TUGAS AKHIR Oleh HILMI DIAN SAPUTRA NIM 111203053 PROGRAM STUDI TEKNIK KIMIA AKADEMI MINYAK DAN GAS BALONGAN INDRAMAYU 2015 i ABSTRAK PT. Pertamina Re...


Description

EVALUASI KINERJA POMPA SENTRIFUGAL MULTISTAGE 13-P-101 PADA UNIT ATMOSPHERIC RESIDUE HYDRODEMETALIZING PT PERTAMINA REFINERY UNIT VI BALONGAN

LAPORAN TUGAS AKHIR

Oleh HILMI DIAN SAPUTRA NIM 111203053

PROGRAM STUDI TEKNIK KIMIA AKADEMI MINYAK DAN GAS BALONGAN INDRAMAYU 2015

i

ABSTRAK

PT. Pertamina Refinery Unit VI Balongan adalah Badan Usaha Milik Negara (BUMN) dan merupakan salah satu pabrik pengolahan minyak bumi di Indonesia setelah RU di daerah Dumai, Plaju, Cilacap, Balikpapan, dan Sorong. RU VI Balongan merupakan pabrik yang sangat berpengaruh untuk kebutuhan bahan bakar di daerah besar seperti Jakarta, Bandung, Bogor, Bekasi dan sebagainya. Pada RU VI terdapat beberapa unit produksi, salah satunya adalah AHU atau Atmospheric Hydrodemetalization Unit. Produk yang dihasilkan dari AHU ini adalah DMAR atau Demetalization Atmospheric Residue yang digunakan untuk umpan RCC atau Residue Catalytic Cracking, kemudian Naptha, Kerosin, Gas Oil yang diolah kembali di Naphtha Processing Unit, Gas Oil Hydrotreating Unit sehingga digunakan untuk kebutuhan sehari-hari sebagai bahan bakar kendaraan. Proses pengolahan Atmospheric Residue pada unit AHU ini adalah mengolah Atmospheric Residue yang dihasilkan dari unit CDU dengan mengurangi kandungan metal seperti nickel, vanadium, Fe dan Na, serta sulfur organik dan Nitrogen kemudian micro carbon residue yang dapat mengurangi performa katalis di reaktor serta menghasilkan DMAR untuk umpan RCC. Pada unit AHU ini terdapat beberapa alat penting diantaranya adalah pompa feed, feed filter, reaktor, kolom fraksinator, furnace, HE,dan kompresor. Pompa pada unit AHU adalah pompa berjenis sentrifugal. Pompa bertugas untuk memindahkan fluida cair dari satu tempat ke tempat lain yang lebih tinggi dengan cara menaikkan tekanan fluida cair tersebut.

ii

LEMBAR PENGESAHAN EVALUASI KINERJA POMPA SENTRIFUGAL MULTISTAGE 13-P-101 PADA UNIT ATMOSPHERIC RESIDUE HYDRODEMETALIZING PT PERTAMINA REFINERY UNIT VI BALONGAN

Hilmi Dian Saputra NIM 111203053

Laporan Tugas Akhir ini telah disahkan Di Indramayu, Juni 2015 Menyetujui, Pembimbing Lapangan

Maman Rokhman Mengetahui, DHC Section Head

Senior Officer BP Refinery

Sukarno

Fatimah Aradani

iii

RIWAYAT HIDUP

Nama

: Hilmi Dian Saputra

Tempat, tanggallahir

: Jakarta, 14 Agustus1994

Alamat

: Perum. Masnaga Jl. GunungBromo II Blok A/372 Bintara Jaya, Bekasi Barat

Agama

: Islam

Jeniskelamin

: Laki-laki

Tinggi badan

: 162,5 cm

Berat badan

: 65 kg

Kesehatan

: Sehat jasmani dan rohani

Hobby

: Bermain basket

No. HP

: 083823794145

E-mail

: [email protected]

GolonganDarah

:O

Status

: Belum Menikah

iv

RIWAYAT PENDIDIKAN 2000 – 2006

: SD Negeri Pulogebang 20, Jakarta Timur

2006 – 2009

: SMP Negeri 236, Jakarta Timur

2009 – 2012

: SMA Negeri12, Jakarta Timur

2012 -sekarang

: Progam Studi DIII Teknik Kimia Akademi Minyak dan Gas Balongan

PENGALAMAN BERORGANISASI 2012 - Sekarang

: Pengurus dari Perhimpunan Mahasiswa Teknik Kimia (PERMATEK) di Akamigas Balongan

2011 - 2012

: Pengurus dari Organisasi Siswa Intra Sekolah (OSIS) di SMAN 12 Jakarta

2008 - 2009

: Pengurus dari Organisasi Siswa Intra Sekolah (OSIS) di SMPN 236 Jakarta

PRAKTIKUM 1.

Praktikum Kimia Dasar I, AKAMIGAS BALONGAN, Indramayu-Jawa Barat.

2.

Praktikum Fisika Dasar I, AKAMIGAS BALONGAN, Indramayu-Jawa Barat.

3.

Praktikum Kimia Analitik, AKAMIGAS BALONGAN, Indramayu-Jawa Barat.

v

4.

Praktikum Mikrobiologi, AKAMIGAS BALONGAN, Indramayu-Jawa Barat.

KUNJUNGAN LAPANGAN 1.

Kunjungan ke - 1 Mata Kuliah : Mikrobiologi Tempat

: PT. Bukit Baros Cempaka, Sukabumi

Pembimbing : Indah Dhamayanthie, MT. 2.

Kunjungan ke - 2 Mata Kuliah : Alat Industri kimia Tempat

: PT. Sumber Daya Kelola, Indramayu

Pembimbing : Rifana Indrawijaya, ST dan Yully Mulyani, ST 3.

Kunjungan ke - 3 Mata Kuliah : Proses Industri Kimia Tempat

: PT. Indocement Tunggal Perkasa, Bogor

Pembimbing : Indah Dhamayanthie, MT dan Yully Mulyani, ST 4.

Kunjungan ke - 4 Mata Kuliah : Pengolahan Industri Migas Tempat

: PT. Indorama Synthetic TBK, Purwakarta

Pembimbing : Indah Dhamayanthie, MT dan Yully Mulyani, ST 5.

Kunjungan ke - 5 Mata Kuliah : Pengendalian Mutu Produksi Tempat

: PT. Sido Muncul, Semarang

Pembimbing : Indah Dhamayanthie, MT dan Yully Mulyani, ST

vi

PENGALAMAN BEKERJA 1.

Kerja Praktek Tempat

: PT Pertamina Refinery Unit VI Balongan

Judul

: Proses Pengolahan Atmospheric Residue Pada Unit ARHDM

Periode

: 10 November 2014 – 10 Desember 2014

TRAINING & SEMINAR 

“Character And Personality Building” diadakan oleh Akamigas Balongan pada tahun 2012



Seminar Nasional “Crude Oil and Catalytic Convertion Process” diadakan oleh Perhimpunan Mahasiswa Teknik Kimia Akamigas Balongan pada Agustus 2014



“Aspen Hysys” diadakan oleh Perhimpunan Mahasiswa Teknik Kimia Akamigas Balongan pada tahun 2014



Stadium General “Lube Oil Complex” diadakan oleh Perhimpunan MahasiswaTeknik Kimia Akamigas Balongan pada tahun 2013

vii

KATA PENGANTAR Puji syukur kepada Allah SWT. atas berkat rahmat dan karunia-Nya sehingga penulis dapat menyelesaikan laporan ini yang berjudul “EVALUASI KINERJA POMPA SENTRIFUGAL MULTISTAGE 13-P-101 PADA UNIT ATMOSPHERIC

RESIDUE

PT

PERTAMINA

REFINERY

UNIT

VI

BALONGAN”. Laporan tugas akhir ini disusun dalam rangka memenuhi tugas mata kuliah Tugas Akhir yang ditempuh pada semester VI(Enam) Program Studi Diploma III Teknik Kimia AKAMIGAS Balongan. Laporan ini dibuat berdasarkan pengamatan dan data yang dikumpulkan selama preode kerja praktek 1 Mei 2015 – 31 Mei 2015. Oleh karena itu pada kesempatan kali ini penulis mengucapkan terima kasih kepada: 1. Ibu Ir. Hj. Hanifah Handayani, selaku Ketua Yayasan Akamigas Balongan. 2. Bapak Nahdudin Islami,M.Si, selaku Direktur Akamigas Balongan. 3. Ibu Indah Dharmayanthie, M.T, selaku Ketua Program Studi Teknik Kimia Akamigas Balongan. 4. Bapak Ahmad Aulia, selaku DHC Section Head RU VI Balongan. 5. Bapak Suyatni, selaku Senior Supervisor AHU RU VI Balongan. 6. Bapak Dedi Rosliadi, selaku DHC F&Q Supervisor RU VI Balongan. 7. Bapak Ahmad Mursalin, selaku Pannel Man di Bagian AHU.

viii

8. Bapak Maman Rokhman, selaku Pembimbing Lapangan di Bagian AHU. 9. Bapak Fendy Anthonius Lingga, selaku Process Engineer di Bagian AHU. 10. Bapak Rifana Indrawijaya, ST selaku dosen pembimbing I. 11. Ibu Wiwi Pratiwi, S.Si selaku dosen pembimbing II. 12. Kedua orang tua yang memberikan dukungan moral maupun spiritual. 13. Rekan-rekan sesama mahasiswa tugas akhir dan semua pihak yang telah membantu yang tidak dapat penulis sebutkan satu persatu. Penulis menyadari bahwa masih banyak kekurangan dalam penyusunan laporan tugas akhir ini. Oleh karena itu, penulis sangat mengharapkan berbagai kritik dan saran yang bersifat membangun yang padat membawa penulis ke arah yang lebih baik. Semoga laporan ini bisa bermanfaat bagi yang membutuhkan dan bisa dijadikan sebuah motivasi

Indramayu,

Juni 2015

Penulis

ix

DAFTAR ISI

Halaman JUDUL ...............................................................................................................i ABSTRAK .........................................................................................................ii LEMBAR PENGESAHAN ..............................................................................iii RIWAYAT HIDUP ...........................................................................................iv KATA PENGANTAR .......................................................................................viii DAFTAR ISI ......................................................................................................x DAFTAR TABEL .............................................................................................xiv DAFTAR GAMBAR .........................................................................................xv DAFTAR GRAFIK ...........................................................................................xvi DAFTAR LAMPIRAN .....................................................................................xvii BAB I

PENDAHULUAN ...........................................................................1 1.1 Latar Belakang ..........................................................................1 1.2 Tema Tugas Akhir.....................................................................2 1.3 Tujuan Tugas Akhir ..................................................................3 1.3.1 Tujuan yang Bersifat Umum .........................................3 1.3.2 Tujuan yang Bersifat Khusus ........................................3 1.4 Manfaat .....................................................................................3 1.4.1 Bagi Perusahaan ............................................................3 1.4.2 Bagi Akademi Minyak dan Gas Balongan ....................4 1.4.3 Bagi Mahasiswa ............................................................4

x

BAB II

TINJAUAN TEORI .......................................................................5 2.1 Pengertian Umum Pompa...........................................................5 2.2 Pompa Sentrifugal ......................................................................6 2.3 Bagian-bagian Pompa Sentrifugal ..............................................7 2.4 Perhitungan Pompa ....................................................................10

BAB III

METODOLOGI PELAKSANAAN ..............................................20 3.1 Metode Pengumpulan Data ........................................................20 3.2 Metode Studi Literatur ...............................................................20 3.3 Metode Interview ......................................................................20

BAB IV

GAMBARAN UMUM PERUSAHAAN .......................................21 4.1 Sejarah Singkat PT. PERTAMINA (Persero) ........................... 21 4.2 Visi, Misi, Slogan dan Logo PT. PERTAMINA (Persero) ....... 24 4.3 PT. PERTAMINA RU VI Balongan ......................................... 26 4.3.1 Tata Letak PT. PERTAMINA RU VI Balongan ............. 30 4.3.2 Sistem Kontrol ................................................................. 33 4.3.3 Struktur Organisasi Perusahaan ....................................... 34 4.4 Sistem Utilitas .......................................................................... 36 4.5 Pengolahan Limbah................................................................... 36 4.5.1 Pengolahan Limbah Cair .................................................. 37 4.5.2 Pengolahan Limbah Gas .................................................. 38 4.5.3 Pengolahan Limbah Padat ................................................ 38 4.6 Laboratorium ............................................................................. 39 4.7 Unit-unit di RU VI Balongan ..................................................... 42

xi

BAB V

HASIL DAN PEMBAHASAN ......................................................50 5.1 Pengertian Pompa Secara Umum .............................................. 50 5.2 Pompa Sentrifugal Multistage ................................................... 50 5.3 Cara Kerja Pompa ..................................................................... 53 5.3.1 Cara Kerja Pompa Sentrifugal ......................................... 53 5.3.2 Cara Kerja Pompa Sentrifugal Multistage ....................... 55 5.4 Bagian-bagian Pompa Sentrifugal Multistage .......................... 56 5.4.1 Bagian Dalam Pompa ....................................................... 56 5.4.2 Balancing Drum ............................................................... 57 5.4.3 Seal Oil System ................................................................ 58 5.4.4 Lube Oil System ............................................................... 59 5.4.5 Motor ................................................................................ 64 5.5 Kerusakan Yang Terjadi Pada Pompa....................................... 65 5.6 Perhitungan Desain Kinerja Pompa 13-P-101 .......................... 67 5.6.1 Head .................................................................................. 67 5.6.2 Daya Fluida ...................................................................... 68 5.4.1 Daya Pada Motor .............................................................. 68 5.4.1 Efisiensi Pompa ................................................................ 69 5.4.1 Perhitungan Kinerja Desain .............................................. 69 5.7 Perhitungan Aktual Kinerja Pompa 13-P-101 ........................... 72

xii

BAB VI

PENUTUP .......................................................................................87 6.1 Kesimpulan ...............................................................................87 6.2 Saran ..........................................................................................89

DAFTAR PUSTAKA LAMPIRAN

xiii

DAFTAR TABEL

Tabel 4.1 Sejarah Perkembangan PT Pertamina (Persero) .................................22 Tabel 4.2 Produk Unit DTU ...............................................................................44 Tabel 5.1 Hasil Perhitungan Desain Kinerja Pompa 13-P-101 ..........................72 Tabel 5.2 Kondisi Operasi Pompa 13-P-101 ......................................................72 Tabel 5.3 Hasil Perhitungan Aktual Kinerja Pompa 13-P-101 ..........................82

xiv

DAFTAR GAMBAR Halaman Gambar 2.1 Bagian-bagian Pompa Sentrifugal .................................................. 7 Gambar 2.2 Bagian-bagian Pompa Sentrifugal ................................................ 11 Gambar 4.1 Logo Baru PT Pertamina(Persero) ............................................... 25 Gambar 4.2 Logo PT Pertamina(Persero) RU VI Balongan ............................ 28 Gambar 4.3 Struktur Organisasi PT Pertamina(Persero) RU VI Balongan ..... 35 Gambar 4.4 Process Flow Diagram RU VI Balongan ...................................... 49 Gambar 5.1 Pompa Sentrifugal Multistage AHU ............................................. 53 Gambar 5.2 Skema Prinsip Kerja dan Arah Aliran dalam Pompa Sentrifugal. 54 Gambar 5.3 Dua Arah Aliran dalam Pompa Multistage .................................. 55 Gambar 5.4 Bagian-bagian Pompoa Sentrifugal Multistage ............................ 56 Gambar 5.5 Balancing Drum............................................................................ 58 Gambar 5.6 Mechanical Seal............................................................................ 58 Gambar 5.7 Sealing Area pada Pompa ............................................................. 59 Gambar 5.8 Seal System pada Pompa Umumnya ............................................. 59 Gambar 5.9 Lube Oil System pada 12-P-101 AHU .......................................... 60 Gambar 5.10 Main Oil Pump ........................................................................... 61 Gambar 5.11 Lube Oil Cooler .......................................................................... 62 Gambar 5.12 Lube Oil Filter ............................................................................ 63 Gambar 5.13 Lube Oil Storage ......................................................................... 63 Gambar 5.14 Motor .......................................................................................... 64

xv

DAFTAR GRAFIK

Grafik 5.1 Head Pompa 13-P-101 Periode 1-30 April 2015 ..............................83 Grafik 5.2 Daya Fluida Pada Pompa 13-P-101 Periode 1-30 April 2015 ..........83 Grafik 5.3 Daya Motor Pada Pompa 13-P-101 Periode 1-30 April 2015 ..........84 Grafik 5.4 Efisiensi Pompa 13-P-101 Periode 1-30 April 2015 ........................84 Grafik 5.5 Perbandingan Efisiensi Desain dan Aktual Pompa 13-P-101 ..........85

xvi

DAFTAR LAMPIRAN

1. Fotokopi Surat Penerimaan Tugas Akhir. 2. Fotokopi Surat Permohonan Tugas Akhir. 3. Proses Flow Diagram AHU.

xvii

BAB I PENDAHULUAN

1.1. Latar Belakang Pompa merupakan alat penting dalam dunia industri terutama pada industri migas. Pompa bertugas untuk memindahkan fluida cair dan atau menaikkan tekanannya. Prinsip kerja pompa yaitu memanfaatkan energi kinetik yang dihasilkan dari impeler untuk membuat fluida cair bergerak mencapai tempat proses selanjutnya. Pompa memiliki dua jenis yaitu pompa kerja dinamis dan pompa kerja positif. Pompa yang digunakan pada unit ARHDM (Atmospheric Residue Hydro Demetalizing) adalah pompa sentrifugal yang berfungsi sekaligus sebagai pompa feed. Pompa sentrifugal merupakan pompa kerja dinamis yang paling banyak digunakan karena mempunyai bentuk yang sederhana dan harga yang relatif murah. Keuntungan pompa sentrifugal dibandingkan jenis pompa perpindahan positif adalah gerakan impeller yang kontinyu menyebabkan aliran tunak dan tidak berpulsa ,keandalan operasi tinggi disebabkan gerakan elemen yang sederhana dan tidak adanya katup-katup,kemampuan untuk beroperasi pada putaran tinggi, yang dapat dikopel dengan motor listrik, motor bakar atau turbin uap ukuran kecil sehingga hanya membutuhkan ruang yang kecil, lebih ringan dan biaya instalasi ringan,harga murah dan biaya perawatan murah.

1

Permasalahan yang teradi pada pompa tentunya tidak sedikit, oleh karena itu setiap perusahaan pasti mengadakan kegiatan maintenance secara berkala agar tidak terjadi kerusakan yang fatal dan agar kinerjanya tetap terjaga. Permasalahan yang ditimbulkan oleh pompa pada umumnya adalah kavitasi, vibrasi tinggi, bearing rusak, dan lain-lain. Berdasarkan uraian di atas, penulis tertarik untuk mengaplikasikan ilmu teknik kimia dengan menganalisa kinerja pompa sentrifugal pada unit ARHDM PT Pertamina Refinery Unit VI mulai dari teori mengenai pompa sentrifugal, masalah yang teradi dan cara mengatasinya, faktor-faktor yang mempengaruhi baik buruknya kinerja pompa tersebut, dan lain.lain.

1.2. Tema Tema Tugas Akhir yang diangkat oleh Penulis adalah Evaluasi Kinerja Pompa Sentrifugal Multistage 13-P-101 Pada Unit Atmospheric Residue Hydrodemetalizing PT Pertamina Refinery Unit VI Balongan.

1.3. Tujuan 1.3.1. Tujuan Umum 1. Mengetahui

gambaran

mengenai

pelaksanaan pekerjaan di

perusahaan atau institusi tempat penulis Tugas Akhir berlangsung. 2. Dapat mengetahui gambaran mengenai “Evaluasi Kinerja Pompa Sentrifugal Multistage 13-P-101 Pada Unit Atmospheric Residue Hydrodemetalizing PT Pertamina Refinery Unit VI Balongan.”

2

3. Untuk meningkatkan keahlian dan daya kreatifitas mahasiswa. 4. Melatih kemampuan dan kepekaan mahasiswa untuk mencari solusi masalah yang dihadapi di dalam dunia industri atau dunia kerja. 5. Menerapkan il...


Similar Free PDFs